ENS 51474
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
10:55 Oct 7, 2015 | |
Title | Unplanned Afw Actuation During Refueling Outage Testing |
Event Description | On October 7, 2015, with McGuire Nuclear Station Unit 2 in Mode 4, operators were testing the main turbine and main feedwater pump turbines, 2A safety injection (SI) train trip functions. At the time of the test, the 2A and 2B Auxiliary Feedwater (AFW) pumps were in operation to provide make-up to the steam generators. The main feedwater system was not in service. During realignment activities from the 2A Sl test, the 2A AFW train actuation signal was unblocked when the '2A AFW auto start defeat' switch was returned to 'reset.' This caused the 2A AFW train control valves to fully open, and the associated steam generator sampling and blowdown valves to close. The actuation occurred as designed and there was no adverse impact to the Unit. Public health and safety were not impacted by this event.
Based on a review of the Event Reporting Guidelines and the plant licensing basis, this event was initially determined to be an invalid actuation. However, after further review and discussions with the NRC, Duke Energy concluded the event should be reported as an 8-hour non-emergency in accordance with 10 CFR 50.72 (b)(3)(iv)(A) as a valid actuation of the Auxiliary Feedwater System. A Nuclear Condition Report was initiated for the late notification. The NRC Resident Inspector has been notified. |
Where | |
---|---|
Mcguire North Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+203.38 h8.474 days <br />1.211 weeks <br />0.279 months <br />) | |
Opened: | Kevin Burianek 22:18 Oct 15, 2015 |
NRC Officer: | Jeff Rotton |
Last Updated: | Oct 15, 2015 |
51474 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51474\u003C/a\u003E - \u003Ca href=\"/McGuire\" title=\"McGuire\"\u003EMcGuire\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnplanned Afw Actuation During Refueling Outage Testing\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51474 - McGuire\n","link":"","lat":35.43065277777778,"lon":-80.9415,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Hot Shutdown (0 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 568022023-10-18T15:16:00018 October 2023 15:16:00
[Table view]10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of Auxiliary Feedwater System ENS 564512023-04-02T07:52:0002 April 2023 07:52:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Actuation of Auxiliary Feedwater Motor Driven Pumps ENS 557482022-02-18T09:59:00018 February 2022 09:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and System Actuation ENS 554582021-09-13T04:11:00013 September 2021 04:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation ENS 540472019-05-03T19:54:0003 May 2019 19:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Over Temperature Delta Temperature ENS 532172018-02-16T15:14:00016 February 2018 15:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip During Solid State Protection System Testing ENS 514742015-10-07T10:55:0007 October 2015 10:55:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Afw Actuation During Refueling Outage Testing ENS 495382013-11-14T18:13:00014 November 2013 18:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Indication of Dropped Control Rods ENS 487752013-02-21T14:57:00021 February 2013 14:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Turbine Trip on Loss of Both Main Feed Pumps ENS 485492012-12-02T04:17:0002 December 2012 04:17:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Amsac Actuated at Lower than Expected Turbine Inlet Pressure ENS 467092011-03-30T04:10:00030 March 2011 04:10:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Control Rod Malfunction During Rod Testing Results in Operators Manually Opening Trip Breakers ENS 465592011-01-20T20:18:00020 January 2011 20:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Both Main Feed Pumps During Shutdown ENS 460032010-06-12T10:44:00012 June 2010 10:44:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to a Control Rod Drop Indication ENS 448692009-02-23T09:06:00023 February 2009 09:06:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent Actuation of the Turbine Driven Auxiliary Feedwater Pump ENS 446242008-11-03T07:07:0003 November 2008 07:07:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manually Opened Reactor Trip Circuit Breakers to Insert Control Bank "B ENS 446182008-10-31T16:52:00031 October 2008 16:52:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Rod Control Malfunction ENS 443182008-06-26T21:32:00026 June 2008 21:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Loss of 1B Reactor Coolant Pump ENS 422112005-12-17T08:11:00017 December 2005 08:11:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip from Full Power Due to a Failed Feed Flow Channel ENS 415782005-04-08T19:43:0008 April 2005 19:43:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Main Steamline Isolation Valves Closed on Valid Signal ENS 414572005-03-02T21:29:0002 March 2005 21:29:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of Motor Driven Afw Pumps During Outage 2023-04-02T07:52:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_51474&oldid=83185"