ENS 43173
ENS Event | |
---|---|
21:57 Feb 19, 2007 | |
Title | Unit 2 Performed a Ts Required Shutdown |
Event Description | The following event description is based on information currently available. If through subsequent reviews of this event, additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS or under the reporting requirements of 10CFR50.73.
On 02/19/2007 at approximately 14:57 hours Mountain Standard Time (MST), Palo Verde Nuclear Generating Station (PVNGS) Unit 2 initiated a plant shutdown as required by Condition 'C' of Technical Specification (TS) LCO 3.5.3 to be in Mode 3 with Pressurizer pressure < 1837 psia and Reactor Coolant System (RCS) Tc < 485 degrees F. Limiting Condition for Operability (LCO) 3.5.3 requires that two ECCS trains be Operable. High Pressure Safety Injection Pump (HPSI) 2A was declared inoperable on 02/16/2007 at 13:01 MST and was not restored to Operable status within the TS 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time due to pump bearing oil leakage exceeding the allowable leakage limit. Efforts are in progress to correct the oil leakage issue. The event did not result in the release of radioactivity to the environment and did not adversely affect the safe operation of the plant or health and safety of the public. The observed pump bearing oil leakage is approximately 3 drops/hr. Unit 2 completed a normal reactor shutdown with a manual reactor trip at 20% power. All rods fully inserted. Decay heat is currently being removed via the Main Condenser. The licensee informed the NRC Resident Inspector. |
Where | |
---|---|
Palo Verde Arizona (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
LER: | 05000529/LER-2007-001 |
Time - Person (Reporting Time:+-2.72 h-0.113 days <br />-0.0162 weeks <br />-0.00373 months <br />) | |
Opened: | Tim Gaffney 19:14 Feb 19, 2007 |
NRC Officer: | Steve Sandin |
Last Updated: | Feb 19, 2007 |
43173 - NRC Website | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (100 %) |
After | Hot Standby (0 %) |
WEEKMONTHYEARENS 506002014-11-06T18:16:0006 November 2014 18:16:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Dropped Control Element Assembly ENS 496012013-12-03T06:24:0003 December 2013 06:24:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown Due to Dropped Control Element Assembly ENS 442742008-06-06T06:56:0006 June 2008 06:56:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown Due to Leak in Safety Injection Tank Vent Line ENS 438042007-11-24T05:26:00024 November 2007 05:26:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Plant Shutdown Due to Inoperable Load Sequencer ENS 437362007-10-22T10:11:00022 October 2007 10:11:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Due to Inoperable Steam Driven Auxiliary Feedwater Pump ENS 431732007-02-19T21:57:00019 February 2007 21:57:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit 2 Performed a Ts Required Shutdown ENS 428472006-09-19T08:05:00019 September 2006 08:05:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Pressurizer Heater Capacity Less than Tech Spec Limit ENS 424872006-04-10T19:33:00010 April 2006 19:33:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit 2 Entered a Ts Required Shutdown Due to Inoperable Auxiliary Feedwater Pumps ENS 420502005-10-11T23:02:00011 October 2005 23:02:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown of Both Unit 2 and 3 ENS 419392005-08-22T23:05:00022 August 2005 23:05:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Due to Core Protection Calculator System (Cpcs) Software Not Consistent with System Design Requirements. ENS 419132005-08-12T07:19:00012 August 2005 07:19:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Entered Lco Action Statement 3.8.1 to Be in Mode 5 Due to Unit 1 "B" Diesel Gen. Being Declared Inoperable ENS 415022005-03-18T22:00:00018 March 2005 22:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Inoperable Diesel Generator ENS 413892005-02-09T08:04:0009 February 2005 08:04:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specifications Required Shutdown Due to Loss of Normal and Alternate Power to Safety Bus ENS 405032004-02-03T22:35:0003 February 2004 22:35:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Technical Specification Required Shutdown Due to Rcs Pressure Boundary Leakage 2014-11-06T18:16:00 | |