05000400/FIN-2018001-01

From kanterella
Jump to navigation Jump to search
01
Site: Harris Duke energy icon.png
Report IR 05000400/2018001 Section 1R05
Date counted Mar 31, 2018 (2018Q1)
Type: URI:
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.05
Inspectors (proximate) J Zeiler
A Patz
J Dodson
S Rose
INPO aspect
'