| Q | CCA | Title |
---|
05000289/FIN-2011005-05 | 2011Q4 | P.1 | Failure to ldentify a Non-Conservative Technical Specification following Revision to River Stage Discharge Analysis |
05000289/FIN-2011005-01 | 2011Q4 | | Inspect and Disposition Leakage Event from BRCP Flange from 1R19 |
05000289/FIN-2011005-04 | 2011Q4 | | Adequacy of Flood Protection without Consideration of Wind Generated Wave Activity |
05000289/FIN-2011005-03 | 2011Q4 | | Adequacy of Seismic Gap Flood Seal |
05000289/FIN-2011005-02 | 2011Q4 | H.5 | Inadequate Control of Reactor Coolant Let-down And Clean-up to Minimize Outage Occupationa Radiation Dose |
05000289/FIN-2012007-03 | 2012Q1 | H.7 | lnadequate Design Control for Battery Sizing Calculation |
05000289/FIN-2012007-04 | 2012Q1 | | Inadequate Design and Maintenance of SBO Diesel Generator Battery |
05000289/FIN-2012007-02 | 2012Q1 | | Inadequate TOL Sizing Evaluation for Jogging/Throttling Valves |
05000289/FIN-2012007-01 | 2012Q1 | | Nonconservative Differential Pressure Value used in DHRyLPI Motor Operated Valves Design Analysis |
05000289/FIN-2012002-04 | 2012Q1 | H.5 | Failure to Perform an Adequate Maintenance Risk Evaluation for DH-V-3 Planned Maintenance |
05000289/FIN-2012002-03 | 2012Q1 | P.2 | Inadequate System Monitoring Results in Multiple IA-P-4 Trips |
05000289/FIN-2012002-02 | 2012Q1 | H.2 | Inadequate Inspection of RCP Flanges |
05000289/FIN-2012002-01 | 2012Q1 | H.7 | Failure to Implement Fire Protection Compensatory Actions for Out-of-Service Appendix R Heat Exchanger |
05000289/FIN-2012008-01 | 2012Q2 | P.3 | Inadeguate Corrective Actions Associated with Esas Relay Failure |
05000289/FIN-2012004-01 | 2012Q3 | H.5 | Failure to Maintain Combustible Loading in the Bwst Tunnel within Fhar Limits |
05000289/FIN-2012403-01 | 2012Q3 | H.14 | Security |
05000289/FIN-2012403-02 | 2012Q3 | P.5 | Security |
05000289/FIN-2012004-02 | 2012Q3 | | Remote Shutdown Relay 69X1RR Contact Failure |