05000250/FIN-2016002-02
Jump to navigation
Jump to search
Site: | Turkey Point |
---|---|
Report | IR 05000250/2016002 Section 1R17 |
Date counted | Jun 30, 2016 (2016Q2) |
Type: | NCV: Green |
cornerstone | Barrier Integrity, Initiating Events, Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.17 |
Inspectors (proximate) | A Sengupta J Patel J Rivera L Suggs R Reyes R Williams T Fanelli T Hoeg W Loo |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion XVI |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |