Pages that link to "RS-22-050, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds"
Jump to navigation
Jump to search
The following pages link to RS-22-050, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds:
Displayed 50 items.
- RS-17-128, Byron, Units 1 and 2, Peach Bottom, Units 1, 2, and 3, Three Mile Island, Units 1 and 2 - Transmittal of Radiological Emergency Plan Annex and Addendum Revisions (← links)
- RS-17-073, Basis for Reimbursement from Decommissioning Trusts for Braidwood Station, Units 1 & 2, Byron Station, Unit 2 and Limerick Generating Station, Unit 1 (← links)
- RS-17-048, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors (← links)
- RS-15-077, Submittal of Updated Site Specific Safstor Decommissioning Cost Estimates for Braidwood, Byron and LaSalle Stations (← links)
- RS-14-223, Enclosure C - Application for Withholding Proprietary Information from Public Disclosure Supporting the Following Set 31 RAI Response RAI 4.3.4-3a (← links)
- RS-14-082, ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report (← links)
- RS-13-145, Braidwood and Byron, Units 1 and 2 - Application for Renewed Operating Licenses (← links)
- RS-12-221, Updated Final Safety Analysis Report (Ufsar), Revision 14, Transmittal Letter Note: Add to Existing Package (← links)
- RS-12-126, Supplemental Information Related to License Amendment Request Regarding Measurement Uncertainty Recapture Power Uprate (← links)
- RS-12-037, Braidwood, Unit 2, and Byron, Unit 2, Response to Request for Information Regarding Thermal Conductivity Degradation and 10 CFR 50.46 Report (← links)
- RS-11-110, Ltr. 11/16/11 Braidwood Confirmation of Operator License Exam (← links)
- RS-11-030, ECCS Evaluation Model Error - 10 CFR 50.46 Reports (← links)
- RS-10-105, Braidwood and Byron Stations, Units 1 and 2 - Response to Request for Additional Information Regarding the Decommissioning Financial Assurance Plans (← links)
- RS-09-161, Response to Request for Additional Information Regarding Generic Letter 2008-01 (← links)
- RS-09-095, Decommissioning Funding Assurance Plan (← links)
- RS-08-010, Additional Information Supporting Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (← links)
- RS-18-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69 (← links)
- RS-07-059, Transmittal of WCAP-16401-NP, Revision 0, Technical Basis for Repair Options for Reactor Vessel Head Penetration Nozzles and Attachment Welds: Byron and Braidwood Units 1 & 2. (← links)
- RS-06-023, Exelon/Amergen Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications. (← links)
- RS-06-019, Response to NRC Request for Additional Information with Respect to Request for License Amendment Related to Application of Alternative Radiological Source Term (← links)
- RS-18-095, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-03 (← links)
- RS-18-094, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-06 (← links)
- RS-18-049, Supplemental Information to Correct an Error Related to License Amendment Request to Incorporate Changes Supported by TSTF-547, Revision 1, Clarification of Rod Position Requirements (← links)
- RS-17-084, Response to Request for Additional Information for Byron Station and Braidwood Station Post Peening Relief Requests (← links)
- RS-16-175, High Frequency Supplement to Seismic Hazard Screening Report,Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 the Near Term-Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RS-15-174, Revisions to Byron and Braidwood Stations, Units 1 and 2 License Renewal Application and Byron Station Applicant'S Environmental Report, Sections 3.1.3, 3.1 .3.1 and 4.1 (← links)
- RS-15-155, Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-15-093, Second 10 CFR 54.21 (B) Annual Amendment to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-15-035, Update to Report the Completion of Commitment 47, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-239, Response to NRC Request for Additional Information, Set 40, Dated August 20, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-248, Interim Update Related to Earlier Response to Set 29 RAI B.2.1.5-1a, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-215, Request for Extraction of Enclosure D of Exelon Set 10 RAI Response Letter RS-14-084, Dated March 28, 2014, Related to the Braidwood and Byron, Units 1 and 2, License Renewal Application (← links)
- RS-14-175, Response to NRC Request for Additional Information, Set 28, Dated May 29, 2014, Related to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1, and 2, License Renewal Application (← links)
- RS-14-169, Responses to NRC Requests for Additional Information, Set 27, Dated May 21, 2014, and Correction of Previously Submitted Information Related to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Applica (← links)
- RS-14-165, Responses to NRC Requests for Additional Information, Set 24, Dated May 19, 2014, Related to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-177, Request for Withdrawal of Documents in Accordance with 10 CFR 2.390(c), Related to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-166, Response to NRC Request for Additional Information, Set 25 Dated May 19, 2014, Related to the Byron Station, Units 1 and 2 and Braidwood Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-119, Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5 (← links)
- RS-14-150, Responses to NRC Requests for Additional Information, Set 23, Dated April 24, 2014, Related to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1, and 2, License Renewal Application (← links)
- RS-14-149, Responses to NRC Requests for Additional Information, Set 22, Dated April 24, 2014, Related to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1, and 2, License Renewal Application (← links)
- RS-14-143, Responses to NRC Requests for Additional Information, Set 21, Dated April 17, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-155, Update to Chapter 9 of Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report (← links)
- RS-14-154, Update to Chapter 9 of Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Braidwood Station Applicant'S Environmental Report (← links)
- RS-14-130, Responses to NRC Requests for Additional Information, Set 18, Dated April 10, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-126, Response to NRC Request for Additional Information, Set 20, Dated April 7, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1, and 2, License Renewal Application (← links)
- RS-14-129, Responses to NRC Requests for Additional Information, Set 19, Dated April 8, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1, and 2, License Renewal Application (← links)
- RS-14-124, Response to NRC Request for Additional Information, Set 16, Dated April 3, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1, and 2, License Renewal Application (← links)
- RS-14-135, 10 CFR 54.21(b) Annual Amendment to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-092, Responses to NRC Requests for Additional Information, Set 15, Dated March 11, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-11-048, Additional Information Related to Byron Station Unit 1, Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)