Pages that link to "PNO-II-80-021, on 800208,QC Inspectors Qualified for Inspecting Pipe Hangers Terminated for Cheating on Test That Would Have Expanded Expertise.Licensee Expects Employees to Create Media Interest"
Jump to navigation
Jump to search
The following pages link to PNO-II-80-021, on 800208,QC Inspectors Qualified for Inspecting Pipe Hangers Terminated for Cheating on Test That Would Have Expanded Expertise.Licensee Expects Employees to Create Media Interest:
Displayed 29 items.
- PNO-II-97-033, on 970614,extended Shutdown Due to Steady Increases Detected in SG 2A Primary to Secondary Tube Leakage.Nrc Resident Inspector Will Followup on Licensee Shutdown & Recovery Activities (← links)
- PNO-II-86-021, on 860310,unit Returned to Operation After Being Out of Svc Since 860307 for Repair of Leaking Sludge Lance Cover on Steam Generator.Unit Operating at 100% Power (← links)
- PNO-II-85-116, on 851211,facility Shut Down to Repair Steam Generator Tube Leak & Correct Low Oil Level in Reactor Coolant Pump.Caused by Low Level Indication on Reactor Coolant Pump.Restart of Unit Scheduled for 851226 (← links)
- PNO-II-96-075, on 961031,shutdowns Required by TS After C Battery Failed to Meet Required Capacity Criteria During Modified Performance Test.C Vital DC Bus cross-connected to a Battery.Decrease in Capacity Unexpected (← links)
- PNO-II-97-015, Re Media Interest in Evacuation of Site Environ Lab,Due to Potentially Explosive Matl.Acid Was re-established,diluted & Stored in Licensee Hazardous Matl Area for Routine Disposal (← links)
- PNO-II-85-067, on 850712,main Generator Trip & Reactor Trip Occurred.Caused by Damaged Permanent Magnet Generator. Permanent Magnet Generator Being Replaced & Main Generator Bearings Being Evaluated.Plant to Be Restarted on 850723 (← links)
- PNO-II-85-090, on 850920,false Bomb Threat Reported at Plant.Search Conducted & Empty Briefcase Found (← links)
- PNO-II-80-049, Safe Energy Alliance Is Planning Forum on 800329 at Park Outside Plant Gate.Group Has Demonstrated Peacefully Before at Plant (← links)
- ML20126B262 (redirect page) (← links)
- PNO-II-80-021 (redirect page) (← links)
- PNO-II-86-030, on 860414 & 15,one Pressurizer Level Channel Failed & Unidentified Leak Found During Subsequent Containment Entry,Respectively.Gradual Shutdown Started. Repairs Made During Containment Entry (← links)
- PNO-II-86-008, on 860123,declared Unusual Event & Began Controlled Shutdown of Plant,Unit 2,due to Computer Calculation of Reactor Coolant Sys Identification Leak 1.5 Gpm (← links)
- PNO-II-86-046, on 860726,during Visual Insp of Reactor Vessel Internals,Five Objects Identified Around Baffle Wall.On 860628,w/Westinghouse Assistance,Objects Confirmed to Be Irradiated Fuel Pellets from Broken Fuel Pin (← links)
- PNO-II-89-043, on 890604,util Employee & Visitors Caused 3 Consecutive Alarms of Portal Monitor While Exiting Site After Tour.No Contamination Surveys Conducted.Util Surveyed Homes of Employee & Visitors.No Contamination Found (← links)
- PNO-II-98-030, on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event (← links)
- PNO-II-89-019, on 890307,Unit 1 Manually Tripped Due to Drop in Pressurizer Level,Increase in Main Steam Line Radiation & Increased Charging Flow Revealed Primary to Secondary Leak. Alert Declared & Onsite Emergency Response Activated (← links)
- PNO-II-87-044, augmented Insp Team Dispatched to Investigate Failure of Westinghouse Model DS416 Breaker Which Failed to Open Even Through Control Room Indicators Indicated Open. Breaker Manually Opened at Breaker Cabinet (← links)
- PNO-II-97-051, on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened (← links)
- PNO-II-89-063A, on 890906,Augmented Insp Team Dispatched to Investigate Overpressurization of Containment Spray Sys & Resultant Spill of Contaminated Water Into Auxiliary Bldg. Problems Existed W/Operability Test Procedure (← links)
- PNO-II-89-063, on 890905,spill of Approx 10,000 Gallons of Contaminated Water Into Auxiliary Bldg Occurred.Caused by Overpressurization of Primary Sys Pressure Allowed to Pressurize Train a Containment Designed for 220 Psi (← links)
- PNO-II-86-079, on 861022,reactor Bldg Temporarily Evacuated After Detection of Live Steam Near post-accident Sampling Sys Drain Line.Sys Isolation Valve Received Stray Signal & Energized Open.Cause Under Investigation (← links)
- PNO-II-86-076, on 861015,29 of 53 Sirens Failed to Activate During Annual Emergency Exercise.Siren Sys Encoder Replaced & Radio Transmitters Checked.Further Testing Will Be Performed to Ascertain & Correct Cause (← links)
- PNO-II-87-009, on 870120,unit Tripped When False Hotwell Emergency Low Level Signal Resulted in Trip of Both Hotwell Pumps.Caused by Linkage Binding of Main Feedwater Pump Turbine Stop Valve.Pump Repaired (← links)
- PNO-II-89-019A, on 890308,auxiliary Feedwater Initiated to Effected Steam Generator,Backfeeding Primary Sys Through Break.Licensee Will Maintain Alert Condition Until DHR Sys Placed in Svc (← links)
- PNO-II-93-076, on 931228,Unit 2 Declared Unusual Event Due to Loss of off-site Power.Licensee Decided to Take Plant to Cold Shutdown Condition & Established Event Review Team to Evaluate Equipment Failures & Plant Response (← links)
- PNO-II-90-068, on 901101,contract Employee Found Deceased in Staging Area Restroom (← links)
- PNO-II-93-053, on 931005,operators Detected Increasing Activity from Condenser Air Ejector Radiation Monitor Indicating Steam Generator Tube Leakage.Region II Will Continue to Monitor Licensee Actions to Find Nature of Leak (← links)
- PNO-II-93-049, on 930927,plant Commenced Controlled Shutdown from 100% Power Due to Unidentified Leakage of 1.2 Gpm in Rcs.Licensee Determined That Majority of Leakage Coming from Seal Ring on Manual Isolation Valve (← links)
- PNO-II-93-038, on 930821,unit Experienced SG Tube Leak Resulting in Shutdown.Region II Will Continue to Monitor Licensee Actions to Determine Nature of Leak (← links)