Pages that link to "Bernhoft S"
Jump to navigation
Jump to search
The following pages link to Bernhoft S:
Displayed 42 items.
- ML031360468 (← links)
- ML20028E382 (← links)
- ML20028E378 (← links)
- 05000305/LER-1982-016 (← links)
- 05000305/LER-1982-017 (← links)
- 05000305/LER-1982-013 (← links)
- 05000305/LER-1982-012 (← links)
- 3F0702-11, Reporting Required by Environmental Protection Plan (← links)
- 3F0502-09, 2001 Annual Financial Reports for City of Alachua & City of Ocala (← links)
- 3F0502-06, Technical Specifications Bases Control Program (← links)
- 3F0502-05, Part 3 of 7, Crystal River Unit 3 - 2001 Annual Financial Reports (← links)
- 3F0700-18, Application Regarding Proposed Acquisition by CP&L Energy of Florida Progress Corp (← links)
- ML20217D655 (← links)
- 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made (← links)
- 3F0999-26, NPDES Noncompliance Notification:On 990826,permitted Release of SDT-1 (I-FG) to Nuclear Svcs Seawater Sys (D-OF), Occurred.Required Sample Not Obtained Due to Failure of Technician to Collect Sample.Release of SDT-1 Was Diluted (← links)
- 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment (← links)
- 3F0999-05, Comment Supporting Proposed Rules 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Rev 2, Event Reporting Guidelines (← links)
- 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals (← links)
- 3F0899-22, NPDES Noncompliance Notification:On 990714,cooling Towers Tripped Off Line.Caused by Failure of Transformer Providing Power to Cooling Towers Pumps.Reduced Load Causing Temp Measured at Point of Discharge to Begin Trending Downward (← links)
- 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal (← links)
- 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl (← links)
- 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 (← links)
- 3F0799-07, LAR 222,Rev 2 for Amend to License DPR-72,proposing Changes to ITS for CREVS & to VFTP & Correcting Typo in ITS Section 5.6.2.12 (← links)
- 3F0399-08, Forwards Copy of Proposed Changes to NPDES Permit for License DPR-72,per App B of Plant Epp.Changes Were Submitted to Fl Dept of Environ Protection,Requesting Use of Phosphoric Acid Descaling of Plant Equipment (← links)
- 3F0299-19, Submits Addendum to NPDES Permit for Fl Power Corp.Addendum Addressed Clarification of Language Relative to Monitoring Requirements of Ph at Outfall (← links)
- 3F1298-19, Withdraws Requesting Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements (← links)
- 3F0499-24, Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent (← links)
- 3F0499-23, Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements (← links)
- 3F0499-18, Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl (← links)
- 3F0499-14, Requests Relief from NRC Staff Position Presented in NUREG- 0737, Clarification of TMI Action Plan Requirements, Re Containment Hydrogen Monitoring for Crystal River,Unit 3 (← links)
- 3F0499-05, Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin (← links)
- 3F0499-02, Requests Implementation Date for Changes to ITS Associated with LAR 246 Which Requested Deletion of Note Re Number of Required Channels for Degrees of Subcooling Function. Approval of LAR 246,requested by 990719 (← links)
- 3F0199-11, Forwards Revised NPDES Permit FL0000159,per Section 3.2.3 of Environ Protection Plan (← links)
- 3F1298-17, Notifies of Withdarawal of Topical Rept, Boron Dilution by RCS Hot Leg Injection, from NRC Review (← links)
- 3F1298-18, Informs of Plans to Submit LAR by 990514 to Increase Spent Fuel Pool Storage Capacity.Proposed LAR Necessary to Allow Reracking of Spent Fuel Pool B to Replace Current Storage Racks That Contain Neutron Absorbing Matl Boraflex (← links)
- 3F1298-06, Comment Supporting Proposed Rule 10CFR50.65 Re Monitoring Effectiveness of Maint at Npps.Expresses Concern Re Absence of Definition of risk-significant Configurations & Unacceptable Level for Safety Function Degradation (← links)
- 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs (← links)
- 3F1198-20, Informs NRC of Recent Senior Mgt Changes at FPC Which Will Affect Standard Recipients of Incoming NRC Correspondence & Those Authorized to Submit Outgoing Correspondence.Mailing Address Changes Attached (← links)
- 3F1198-09, Requests Extension for CR-3 Plant Specific Responses to GL 97-01,until 990115 (← links)
- 3F0699-09, Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl (← links)
- 3F0599-10, Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl (← links)
- 3F1298-23, Forwards Rev 0 to FPC Calculations F-98-0013, FTI Calculation 32-5001746-00,CR-3 32 EFPY P/T Limits & F-98-0010, FTI Calculation 32-5000218-00,Adjusted Ref Temperatures for 32 EFPY for CR-3, Re LAR 236 (← links)