Pages that link to "3F0289-18, Comment on Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants.Industry Actions in Maint Area Effective W/Continuing Improvement Across Industry.Balance of Plant Equipment Inappropriate"
Jump to navigation
Jump to search
The following pages link to 3F0289-18, Comment on Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants.Industry Actions in Maint Area Effective W/Continuing Improvement Across Industry.Balance of Plant Equipment Inappropriate:
Displayed 21 items.
- ML19324B870 (← links)
- ML20024H428 (← links)
- ML20056G983 (← links)
- ML20064G149 (← links)
- ML20067C149 (← links)
- ML20083N461 (← links)
- ML20077M679 (← links)
- ML20098B280 (← links)
- ML20094E114 (← links)
- ML20091S053 (← links)
- ML20199E082 (← links)
- ML20204G652 (← links)
- ML20235V571 (redirect page) (← links)
- 3F1287-24, Comment on Proposed Rules 10CFR4,11,25,30,31,32,34,35,40,50, 60,61,70,71,73,74,75,95 & 110 Re Retention Period for Records.Formal Tech Spec Amends Should Not Be Required to Implement Changes & No 10CFR170 Fees Should Be Incurred (← links)
- 3F0289-18 (redirect page) (← links)
- 3F1298-06, Comment Supporting Proposed Rule 10CFR50.65 Re Monitoring Effectiveness of Maint at Npps.Expresses Concern Re Absence of Definition of risk-significant Configurations & Unacceptable Level for Safety Function Degradation (← links)
- 3F1288-02, Requests That Comment Period Be Extended from 60 Days to 120 Days on Proposed Rule 10CFR50 Re Maint in Nuclear Power Plants (← links)
- 3F1098-09, Comment Re Integrated Review of Assessment Process for Commercial Npps.Recommends That Assessment Process Be Reviewed with Consideration of Enforcement Process,Insp Process & Reporting Process (← links)
- 3F0492-15, Comment Concurring W/Comments Offered by NUMARC on Sections 7 & 8 of Draft NUREG-1449, Shutdown & Low-Power Operation at Commercial Nuclear Power Plants in Us. Urges NRC to Consider Comments Carefully (← links)
- NL-95-0061, Comment on Draft GL Re Testing of safety-related Circuits. Util Primary Concern W/Requested Actions of Proposed GL Is Schedule (← links)
- NL-95-0053, Comment on Review of NRC Insp Rept Content,Format & Style. Insp Repts Frequently Not Appropriately Focused on Safety Issues (← links)