Pages that link to "W3P84-1408, Responds to Violations Noted in Insp Rept 50-382/83-22. Corrective Actions:All Problems Identified During Plant Operation Will Be Evaluated & Design Mods Implemented Per ALARA Program"
Jump to navigation
Jump to search
The following pages link to W3P84-1408, Responds to Violations Noted in Insp Rept 50-382/83-22. Corrective Actions:All Problems Identified During Plant Operation Will Be Evaluated & Design Mods Implemented Per ALARA Program:
Displayed 2 items.
- ML20106A537 (redirect page) (← links)
- W3P84-1408 (redirect page) (← links)
- W3P84-1408, Responds to Violations Noted in Insp Rept 50-382/83-22. Corrective Actions:All Problems Identified During Plant Operation Will Be Evaluated & Design Mods Implemented Per ALARA Program (← links)
- W3P84-1529, Confirms Position Re Open Item 8322-02 Concerning ALARA Review of Gaseous & Liquid Radwaste Sys Against Recommendations of ANSI N55.4-1979 & N55.6-1979.Review Will Be Performed Prior to Exceeding 5% Power Level (← links)
- W3P84-1532, Confirms Util Position Re Open Item 8322-02 Requesting ALARA Review of Gaseous & Liquid Radwaste Sys Against ANSI Stds. Util Will Reevaluate Sys Utilizing ALARA Aspects of Stds, W/Primary Focus on as-built Conditions (← links)