Pages that link to "U-604707, Submittal of 2021 Annual Radiological Environmental Operation Report"
Jump to navigation
Jump to search
The following pages link to U-604707, Submittal of 2021 Annual Radiological Environmental Operation Report:
Displayed 50 items.
- U-604484, October 1, 2016 to September 30, 2017, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report (← links)
- U-604485, October 1, 2017 Through September 30, 2018, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report (← links)
- U-604483, Annual Dose Report for 2018 (← links)
- U-604478, Notification of Readiness for NRC 95001 Inspection (EA-18-104) (← links)
- U-604454, Transmittal of Revision 20 to Technical Specification Bases (← links)
- U-604458, Submittal of the Core Operating Limits Report, Cycle 19, Revision 14 (← links)
- U-604453, Regulatory Conference Information (← links)
- U-604457, Third Ten-Year Interval Inservice Testing Program Plan Revision 9 (← links)
- U-604451, Response to NRC Inspection Report and Preliminary White Finding (← links)
- U-604446, Registration of Use of Casks to Store Spent Fuel (← links)
- U-604444, Registration of Use of Casks to Store Spent Fuel (← links)
- U-604438, Post Outage 90-Day Lnservice Inspection (ISI) Summary Report (← links)
- U-604436, Notification of Readiness for NRC 95001 Inspection (EA-17-203) (← links)
- U-604424, Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 19, Revision 13 (← links)
- U-604417, Annual Dose Report for 2017 (← links)
- U-604415, 2017 Annual Radiological Environmental Operating Report (← links)
- U-604416, Submittal of 2017 Annual Radioactive Effluent Release Report (← links)
- U-604409, Notification of Readiness for NRC 95001 Inspection (EA-17-098) (← links)
- U-604403, Response to Preliminary White Finding EA-17-203 (← links)
- U-604400, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (Cover Letter Only) (← links)
- U-604396, Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases (← links)
- U-604391, Appeal of Final Significance Determination of a White Finding; EA-17-098 (← links)
- U-604367, Response to Nuclear Regulatory Commission Inspection Report 05000461/2017009 and Preliminary White Finding, EA-17-098 (← links)
- U-604368, Reply to a Notice of Violation IR 05000461/2017002-02 (← links)
- U-604372, Notification of Intention Regarding Inspection Report 05000461/2017009 and Preliminary White Finding (EA-17-098) (← links)
- U-604359, Third Ten-Year Interval Lnservice Testing Program Plan, Revision 8 (← links)
- U-604357, Special Report: Inoperable Drywall High Range Gamma Radiation Monitor (← links)
- U-604353, Submittal of the Core Operating Limits Report Cycle 18, Revision 12 (← links)
- U-604339, Notification That Annual Dose Report for 2016 Was Submitted Via the REIRS on April 12, 2017 (← links)
- U-604342, Transmittal of 2016 Annual Radiological Environmental Operating Report (← links)
- U-604326, Third Ten-Year Interval Inservice Testing Program Plan Revision 7 (← links)
- U-604321, Registration of Use of Casks to Store Spent Fuel (← links)
- U-604320, Submittal of National Pollutant Discharge Elimination System Permit No. ILG870019 (← links)
- U-604314, Registration of Use of Casks to Store Spent Fuel (← links)
- U-604303, Post-Outage 90-Day Inservice Inspection Summary Report (← links)
- U-604284, Core Operating Limits Report for Cycle 17, Revision 11 (← links)
- U-604281, Preparation and Scheduling of Operator Licensing Examinations (← links)
- U-604278, Annual Radioactive Effluent Release Report for 2015 (← links)
- U-604277, Annual Radiological Environmental Operating Report (← links)
- U-604279, Annual Dose Report for 2015 (← links)
- U-604269, Operational Safety Review Team (Osart) Follow Up Mission Report (← links)
- U-604262, Third Ten-Year Interval Inservice Testing Program Plan, Revision 6 (← links)
- U-604257, Transmittal of Revision 17 to the Technical Specification Bases (← links)
- U-604254, Readiness for a Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period (← links)
- U-604245, Security Agreement for Re-Administering Exam (← links)
- U-604250, Notification of Readiness for NRC 95001 Inspection (← links)
- U-604246, Preparation and Scheduling of Operator Licensing Examinations (← links)
- U-604243, Special Report: Inoperable Post Accident Monitoring Instrumentation (← links)
- U-604237, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report (← links)
- U-604226, Regulatory Conference Supplemental Information (← links)