Pages that link to "TXX-4615"
← TXX-4615
Jump to navigation
Jump to search
The following pages link to TXX-4615:
Displayed 4 items.
- TXX-4823, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed Per Design Documents.Initially Reported on 850918.Review, Including Flexibility Problems of Conduit Between Raceway & Equipment,Continuing.Next Rept Expected by 860627 (← links)
- TXX-4878, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Interface.Initially Reported on 850918.Next Rept Expected by 860815 (← links)
- TXX-4699, Interim Deficiency Rept CP-85-39 Re Installation of Conduit to Equipment Which May Not Be Specified Per Design Documents.Initially Reported on 850918.Issue Expanded to Review Flexibility Problems.Next Rept by 860523 (← links)
- TXX-4615, Deficiency Rept SDAR-201 Re Installed Conduit to Equipment Interface Not Being Specified Per Design Documents.Initially Reported on 850918.Completion of Evaluation Expected by 860212 (← links)