TXX-4615, Deficiency Rept SDAR-201 Re Installed Conduit to Equipment Interface Not Being Specified Per Design Documents.Initially Reported on 850918.Completion of Evaluation Expected by 860212
| ML20136C422 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/07/1985 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Denise R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR-201, TXX-4615, NUDOCS 8511210085 | |
| Download: ML20136C422 (1) | |
Text
.-l,,
Log # TXX-4615 TEXAS UTILITIES GENERATING COMPANY File # 10110 SKYWAY TOWER = 400 NORTH 01JVE STREE"F. L.B. 51 e DAILAN. TEXAM 78201 WILLIAM 0, COUNSIL EZEcuTIVE VICE PREstOEse?
h D Q//{=+,, r, Mr. R. P. Denise, Director Division of Reactor Safety and Projects j 'l:
U.S. Nuclear Regulatory Commission gig / 2B85
/
Region IV 611 Ryan Plaza Drive, Suite 1000 x.s!) ';
Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NO. 50-446 EQUIPMENT CONDUIT INTERFACE QA FILE: CP-85-39, SDAR-201 I
Dear Mr. Denise:
On September 18, 1985, we verbally notified your Mr. T. F. Westerman of a deficiency involving the installed conduit.to equipment interface which may not be as specified per design documents. We have submitted an interim report logged TX :~4589, dated October 10, 1985.
We are continuir:9 our evaluation and anticipate completion by February 12,
[
1986.
Very taly yours,
[
W. G. Counsil JCH/grr c-NRC Region IV (0 + 1 copy)
Director, Inspection and Enforcement (i5 copids)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 999 Q2 s
0
)(o n n.. -., - -. _,c _
.