Pages that link to "RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)"
Jump to navigation
Jump to search
The following pages link to RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2):
Displayed 50 items.
- ML17054C255 (← links)
- ML17095A268 (← links)
- ML17170A013 (← links)
- ML16230A237 (← links)
- ML16162A211 (← links)
- ML16109A337 (← links)
- ML17249A298 (← links)
- ML14303A506 (← links)
- ML13016A515 (← links)
- ML12121A637 (← links)
- ML12108A123 (← links)
- ML111330653 (← links)
- ML110590921 (← links)
- RS-17-168, Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RS-11-110, Ltr. 11/16/11 Braidwood Confirmation of Operator License Exam (← links)
- ML101230179 (← links)
- ML101190527 (← links)
- ML100850495 (← links)
- ML100480699 (← links)
- ML093070271 (← links)
- ML080370181 (← links)
- ML072430034 (← links)
- ML070170502 (← links)
- ML063260074 (← links)
- RS-18-095, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-03 (← links)
- RS-18-094, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-06 (← links)
- RS-14-154, Update to Chapter 9 of Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Braidwood Station Applicant'S Environmental Report (← links)
- RS-08-044, Additional Information Regarding Braidwood Station Relief Request I2R-48 (← links)
- RS-08-039, Third 10-Year Inservice Inspection Interval, Relief Request 13R-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure Retaining Piping Welds (← links)
- ML18305A360 (← links)
- ML18331A037 (← links)
- ML18318A334 (← links)
- RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) (← links)
- RS-18-041, Response to Request for Additional Information Regarding Request for Relief (I4R-07) for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ... (← links)
- RS-16-223, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-16-231, Revised Response to Request for Additional Information for License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-222, Response to Request for Additional Information Related to License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-218, Response to Request for Additional Information License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-197, License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-145, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-16-020, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-15-276, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-15-083, Request for Schedule Relief/Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- RS-13-204, Response to Request for Additional Information Regarding the Steam Generator Tube Inspection Report, Braidwood, Unit 2, Refueling Outage 16 (← links)
- RS-18-129, Supplement to License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies (← links)
- RS-18-125, Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RS-18-124, Relief Request Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval (← links)
- RS-18-083, Response to Request for Additional Information Regarding Braidwood Station Fourth Inservice Inspection Interval Relief Request 14R-05 (← links)
- RS-18-055, Supplement to Relief Request I4R-03 Associated with the Fourth Inservice Inspection Interval (← links)
- RS-18-030, Relief Requests Associated with the Fourth Inservice Inspection Interval (← links)