Pages that link to "RS-15-326, Request for License Amendment Regarding Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge"
Jump to navigation
Jump to search
The following pages link to RS-15-326, Request for License Amendment Regarding Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge:
Displayed 50 items.
- ML16130A570 (← links)
- ML16069A269 (← links)
- ML16064A205 (← links)
- ML16048A455 (← links)
- ML16258A152 (← links)
- ML16258A150 (← links)
- ML15348A396 (redirect page) (← links)
- ML16130A570 (← links)
- ML16069A269 (← links)
- ML16097A276 (← links)
- ML16064A205 (← links)
- ML16048A455 (← links)
- ML16288A760 (← links)
- ML16231A131 (← links)
- NRC-2016-0079, Federal Register Notice on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI (← links)
- ML113260348 (← links)
- CAC:MF7160 (← links)
- ML18053A190 (← links)
- ML18053A185 (← links)
- ML18053A178 (← links)
- ML18053A177 (← links)
- RS-15-326, Quad Cities, Units 1 and 2 - Request for License Amendment Regarding Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge (redirect page) (← links)
- RS-15-326 (redirect page) (← links)
- ML16299A024 (← links)
- ML16048A455 (← links)
- ML16288A760 (← links)
- ML16231A131 (← links)
- RS-16-229, Supplemental Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings (← links)
- RS-15-326, Request for License Amendment Regarding Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge (← links)
- RS-11-180, Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio (← links)
- RS-16-201, Quad Cities Nuclear Power Station, Units 1 and 2 - License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition (← links)
- ML16288A760 (← links)
- ML16231A131 (← links)
- RS-06-147, Quad, Units 1 & 2 - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint Tolerance and Standby Liquid Control System Enrichment (← links)
- RS-11-022, Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-16-187, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- RS-16-162, Request for License Amendment to Revise Loss of Voltage Relay Settings (← links)
- RS-16-062, Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge (← links)
- RS-13-165, Request for License Amendment to Revise Battery Surveillance Requirements (← links)
- RS-10-032, Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) (← links)
- RS-07-157, Request for Technical Specification Change for Minimum Power Ratio Safety Limit (← links)
- RS-07-117, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- RS-17-051, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- RS-16-201, License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition (← links)
- RS-13-148, License Amendment Request - Use of Neutron Absorbing Inserts in Units 1 and 2 Spent Fuel Pool Storage Racks (← links)
- RS-05-075, Request for Amendment to Technical Specifications Associated with Feedwater System and Main Turbine High Water Level Trip Instrumentation (← links)
- RS-04-062, Technical Specifications Changes Related to Main Steam Line Flow-High Isolation Instrumentation (← links)
- RS-03-204, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-03-087, Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30D (← links)
- RS-03-044, Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. (← links)
- RS-02-171, Request for License Amendment Related to Heavy Loads Handling (← links)
- RS-02-095, Application for Amendment to License DPR-29 for Quad Cities, Unit 1 Ts. Amendment Would Revise Values of Safety Limit for Minimum Critical Power Ratio (Slmcpr)In TS 2.1.1 for Cycle 18 (← links)
- RS-02-044, Request for Technical Specification Change, Revises Emergency Diesel Generator Required Start Time (← links)
- RS-02-073, Request for Amendment, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 (← links)
- ML21257A420 (← links)
- RS-21-065, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 (← links)
- RS-21-108, Application to Revise Technical Specification 3.1.4, Control Rod Scam Times (← links)
- RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR (← links)
- RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location (← links)
- RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (← links)
- RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days (← links)
- RS-18-006, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)