Pages that link to "PMNS20241150, Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 1"
Jump to navigation
Jump to search
The following pages link to PMNS20241150, Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 1:
Displayed 50 items.
- PMNS20230812, Periodic Advanced Reactor Stakeholder Meeting (← links)
- PMNS20231097, Periodic Advanced Reactor Stakeholder Meeting (← links)
- PMNS20231384, 2024 Nondestructive Examination (NDE) Technical Information Exchange - Hybrid (← links)
- PMNS20231341, Discussion of Draft NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors (← links)
- PMNS20231377, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (← links)
- PMNS20231361, NRC Public Hybrid Meeting with NEI to Address Industry Comments on the Draft Safety Evaluation on NEI 16-03, Guidance for Monitoring of Fixed Neutron Absorbers in Spent Fuel Pools (← links)
- PMNS20240017, Meeting to Discuss Sections of the National Organization of Test, Research and Trainingreactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications(Nei 23-03) with the U. S. Nuclear Regulatory Commission (NRC) S (← links)
- PMNS20240010, Public Meeting to Discuss SRP Chapter 19 Scope for Light-Water Reactor Construction Permit Applications Staff White Paper Guidance (← links)
- PMNS20231422, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application (← links)
- PMNS20231420, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application (← links)
- PMNS20231419, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application (← links)
- PMNS20231418, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application (← links)
- PMNS20231397, Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent License Renewal Review (← links)
- PMNS20231392, NRC Hybrid Workshop (1 of 3) - Update to RG 1.183, Revision 1, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors (← links)
- PMNS20231401, Meeting Between NRC Staff and Representatives of Nuclear Energy Institute to Discuss Draft Revision E to NEI 20-07, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C Systems (← links)
- PMNS20240146, NRC Hybrid Workshop (2 of 3) - Update to RG 1.183, Revision 1, Alternative Radiologicalsource Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors (← links)
- PMNS20240133, Public Meeting on Holtec SMR Conformance with RG 1.189 Rev. 5, Fire Protection Guidance (← links)
- PMNS20240126, Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent Licenserenewal Review (← links)
- PMNS20240012, 10 CFR Part 52 Construction Lessons-Learned Report (← links)
- PMNS20240125, Kickoff Public Meeting with Duke Energy on Belews Creek Early Site Permit Pre-Application (← links)
- PMNS20240087, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (← links)
- PMNS20231417, Quarterly NRC-NuScale Management Meeting on NuScale US460 Standard Design Approval Application (← links)
- PMNS20240076, NRC Meeting with Industry Steam Generator Task Force (← links)
- PMNS20240027, NRC Public Meeting (Virtual) with the Nuclear Energy Institute (NEI) on the Emergency Response Organization (ERO) Remote Augmentation White Paper, Revision 0 (← links)
- PMNS20240022, Reactor Oversight Process Public Meeting (← links)
- PMNS20240086, Periodic Advanced Reactor Stakeholder Meeting (← links)
- PMNS20241055, Virtual NRC Public Meeting with the Nuclear Energy Institute (NEI) on the Status of Emergency Response Organization (ERO) White Paper, Rev. 0 and NEI 99-01, Rev. 7, Development of Emergency Action Levels for NON-PASSIVE Reactors (← links)
- PMNS20240944, NRCs Annual Higher Burnup Workshop V (← links)
- PMNS20241063, Discussion on Proposed Changes to NEI 99-02 Performance Indicators for Revision 8 and IE01 Whitepaper (← links)
- PMNS20241054, Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent Licenserenewal Review (← links)
- PMNS20240962, Meeting to Discuss Sections of the National Organization of Test, Research and Trainingreactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications(Nei 23-03) with the U. S. Nuclear Regulatory Commission (NRC) S (← links)
- PMNS20240987, Pre-application Public Meeting on SMR, LLCs (Holtec) SMR-300 Cyber Security Plan (← links)
- PMNS20240975, Public Meeting to Discuss NRC Staff Guidance for Power Uprate Reviews (← links)
- PMNS20240791, Periodic Advanced Reactor Stakeholder Meeting (← links)
- ML24212A339 (← links)
- PMNS20240974, NRC Meeting with Industry Steam Generator Task Force (← links)
- PMNS20240946, Meeting with Energy Northwest (← links)
- PMNS20240966, Virtual Public Meeting on Draft Responses to Requests for Additional Information (Rais) on Topical Report PWROG-22021, Justifications for the Proposed Changes to the Quadrant Power Tilt Ratio Technical Specifications (← links)
- PMNS20240961, NRC Public Meeting to Discuss LWR Reactor Accident Analysis Modenization Efforts (← links)
- PMNS20240953, Virtual Public Meeting Between the Us Nuclear Regulatory Commission and the Pressurized Water Reactor Owners Group to Discuss Liquid Penetrate Testing Examination Frequency (← links)
- PMNS20240753, Periodic Advanced Reactor Stakeholder Meeting (← links)
- PMNS20240709, 6th Quarterly NRC Management Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application Status (← links)
- PMNS20240890, Discuss SMR-300 Intended Limited Work Authorization (LWA) Scope, Overall Licensing Strategy, and Timeline (← links)
- PMNS20240908, Notice of Meeting with Nuclear Energy Institute (NEI) to Discuss Draft Revision E to NEI 20-07, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C Systems (← links)
- PMNS20240867, Meeting to Discuss Trial Use Regulatory Guide 1.247, Acceptability of Probabilistic Risk Assessment Results for Advanced Non-Light Water Reactor Risk-Informed Activities (← links)
- PMNS20240743, Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent License Renewal Review (← links)
- PMNS20240882, Status of Risk Evaluation Guidance Updates Developed by Greatr (Group for Risk Evaluation and Assessment Tools Review) (← links)
- PMNS20240900, Reactor Oversight Process Public Meeting (← links)
- PMNS20240894, Advanced Reactor Construction Oversight Program Public Workshop 4 (← links)
- PMNS20240893, Meeting to Discuss Sections of the National Organization of Test, Research and Trainingreactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications(Nei 23-03) with the U. S. Nuclear Regulatory Commission (NRC) S (← links)