Pages that link to "NRC-90-0075, LER 87-045-02:on 870908,operator Removed Fuse Which Deenergized Dc Control Power to Bus 72C,resulting in Loss of Power Supply to Swing Bus & to LPCI Loop Selection Valves. Caused by Design Flaw.Design Change initiated.W/900518 Ltr"

Jump to navigation Jump to search
What links here
⧼whatlinkshere-target⧽
⧼whatlinkshere-ns⧽
⧼whatlinkshere-filter⧽

The following pages link to NRC-90-0075, LER 87-045-02:on 870908,operator Removed Fuse Which Deenergized Dc Control Power to Bus 72C,resulting in Loss of Power Supply to Swing Bus & to LPCI Loop Selection Valves. Caused by Design Flaw.Design Change initiated.W/900518 Ltr:

Displayed 41 items.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)