Pages that link to "NRC-20-0046, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Fermi 2 Spent Fuel Storage Racks"
Jump to navigation
Jump to search
The following pages link to NRC-20-0046, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Fermi 2 Spent Fuel Storage Racks:
Displayed 50 items.
- NRC-17-0084, 2018 Fermi Ile Proposed Files Letter NRC-17-0084 (← links)
- NRC-18-0018, DTE Energy Company - Property Insurance Coverage (← links)
- NRC-17-0069, Notice of Organization Change - Senior Vice President and Chief Nuclear Officer (← links)
- NRC-17-0040, (LER) SER 17-S01-00 for Fermi 2 Regarding Unescorted Access Granted for Individual Subsequent to Being Denied Unescorted Access at Another Nuclear Facility (← links)
- NRC-17-0021, Decommissioning Funding Status Report for Fermi 1 (← links)
- NRC-17-0022, Decommissioning Funding Status Report for Fermi 2 (← links)
- NRC-17-0019, Submittal of Revision 47 to the Fermi 2 Radiological Emergency Response Preparedness (RERP) Plan (← links)
- NRC-16-0070, DTE Energy - Fermi 2, Flooding Mitigating Strategies Assessment Report (← links)
- NRC-16-0006, License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals (← links)
- NRC-15-0088, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2015 (← links)
- NRC-15-0065, Response to NRC Request for Additional Information Regarding the Fermi 2 Expedited Seismic Evaluation Process Report (← links)
- NRC-15-0039, Decommissioning Funding Status Report for Fermi, Unit 2 (← links)
- NRC-15-0035, Decommissioning Funding Status Report for Fermi, Unit 1 (← links)
- NRC-14-0078, Submittal of Revision 8 to the Fermi 1 Safety Analysis Report (← links)
- NRC-14-0064, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2014 (← links)
- NRC-14-0006, Submittal of Revision 43 to the Fermi 2 Radiological Emergency Response Preparedness (RERP) Plan (← links)
- NRC-13-0060, Response to NRC Request for Additional Information Regarding the Fermi 2 Seismic Walkdown Report (← links)
- NRC-13-0053, Response to Request for Additional Information (RAI) Regarding the License Amendment Request to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles (← links)
- NRC-13-0054, Response to Request for Additional Information Regarding Fermi 2 2013 Biennial Decommissioning Funding Report (← links)
- NRC-13-0048, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2013 (← links)
- NRC-13-0024, Submittal of DTE Energy Company 2012 Annual Form 10-K Report to the United States Securities and Exchange Commission (← links)
- NRC-13-0015, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report (← links)
- NRC-13-0013, DTE Electric Submittal of Flooding Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flood Protection Evaluations (← links)
- NRC-13-0014, Submittal of Corrected Page for License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate (← links)
- NRC-13-0002, Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles (← links)
- NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report (← links)
- NRC-12-0082, Response to Request for Additional Information Regarding the Fermi 2 Physical Security Plan, Revision 14 (← links)
- NRC-12-0084, Price-Anderson Act Guarantee of Payment of Deferred Premiums (← links)
- NRC-12-0076, Detroit Edison'S Response to March 12, 2012 Information Request Regarding Flood Protection Walkdowns (← links)
- NRC-12-0073, DTE Energy - Plans for Restoration of the South Reactor Feedpump (← links)
- NRC-12-0077, Enrico Fermi, Unit 1, Submittal of Revision 7 to the Fermi 1 Safety Analysis Report (← links)
- NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases (← links)
- NRC-12-0057, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 2012 (← links)
- NRC-12-0048, Submittal of the Fermi 2 Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Security and Contingency Plan for Independent Spent Fuel Storage Facilities, Revision 14, and Response to Request (← links)
- NRC-12-0002, 2012 Fermi Power Plant Initial License Examination Outline Submittal (← links)
- NRC-12-0032, Detroit Edison'S 60 Day Response to March 12, 2012 Information Request (← links)
- NRC-12-0025, Submittal of 2011 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report (← links)
- NRC-12-0028, Detroit Edison'S 30 Day Response to March 12, 2012 Information Request (← links)
- NRC-12-0019, Update on Fermi 1 Return to Passive Safstor Status (← links)
- NRC-12-0012, Updated Fermi 1 Groundwater Monitoring Data (← links)
- NRC-12-0005, Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.2 (← links)
- NRC-11-0055, Submittal of the Fermi 2 Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Security and Contingency Plan for Independent Spent Fuel Storage Facilities, Revision 12 (← links)
- NRC-11-0043, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 2011 (← links)
- NRC-11-0040, Enrico Fermi Atomic Power Plant Unit 1, Decommissioning Project Schedule and Cost Changes (← links)
- NRC-11-0018, Enrico Fermi Atomic Power Plant, Unit 1 - Fermi 1 Groundwater Site Conceptual Model (← links)
- NRC-11-0036, Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 4 (← links)
- NRC-11-0017, Letter from Detroit Edison Property Insurance Coverage (← links)
- NRC-10-0079, Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 3 (← links)
- NRC-10-0069, 2010 Fermi Initial License Examination - Post Exam Comments Submittal (← links)
- NRC-10-0055, Notification Letter Designating Fermi 2 Balance of Plant Systems within the Cyber Security Rule Scope (← links)