Pages that link to "ML20199B738"
Jump to navigation
Jump to search
The following pages link to ML20199B738:
Displayed 17 items.
- IR 05000302/1997007 (← links)
- ML20199E395 (← links)
- ML20199B442 (← links)
- ML20203C390 (← links)
- 05000302/LER-1997-039, Corrected Page 1 to LER 97-039-00,adding Rept Date in Block 7.On 971108,unqualified Matl Discovered Left in Reactor Bldg During Const.Caused by Personnel Error.Polystyrene Permanently Installed (← links)
- ML20202E567 (← links)
- ML20202D416 (← links)
- ML20216J910 (← links)
- 3F1297-38, Forwards Addl Info on Validations of Proposed Emergency Operating Procedures Containing Operator Actions Related to TS Change Request 210,per 971203 Telcon (← links)
- 3F0298-02, Forwards Status of Requirements Stated in SE Submitted W/ License Amend 163.Status of SE Requirements Do Not Invalidate or Alter Any Conclusions,Or Basis of Any Conclusion,Supporting TS Issued in License Amend 163 (← links)
- 3F1297-32, Provides NRC Requested Clarification Re Use of HPI Flow Throttling TS Change Request Notice 210.No New Commitments Made in Submittal (← links)
- 3F1297-27, Forwards Response to 971126 RAI Re TS Change Request 210, Which Addresses Design & Licensing Basis Changes Primarily Involving Plant Systems Used to Mitigate Consequences of Certain Small Break LOCA (← links)
- 3F1197-45, Submits Rev 1 to TS Change Request Notice 210,which Proposes Amends to OL DPR-72.Rev Addresses Changes Resulting from NRC Review of TS Change Request Notice 210.Rev Involves Additional Restrictions,Editorial Clarifications & Typos (← links)
- 3F1197-54, Forwards Copy of Proposed Rev 5 to EOP-8, LOCA Cooldown, as Committed in (← links)
- 3F0198-35, Forwards Complete Updated TS & Bases Pages to TS Change Request Notice 210 Submitted on 970614.Updated Pages Reflect Changes Identified in Licensee ,Correction of Typo & Addition of Footnotes (← links)
- 3F0198-29, Informs That Util in Conjunction W/Framatome Technologies Inc,Completed Confirmation Which Includes Consideration of SG Tube Plugging Levels Specific for CR-3.Util Verified That LOCA Analyses of Record Does Not Require Manual Actuation (← links)
- 3F1297-47, Forwards Response to 971219 RAI Re TS Change Request Notice 210,addressing Design & Licensing Basis Changes Involving Plant Systems Used to Mitigate Consequences of Certain Sbloca.Commitments Made by Util Also Encl (← links)