Pages that link to "ML20128D263"
Jump to navigation
Jump to search
The following pages link to ML20128D263:
Displayed 15 items.
- ML20107A012 (← links)
- ML20115J066 (← links)
- ML20128D285 (← links)
- ML20128D276 (← links)
- ML20126J181 (← links)
- ML20126C726 (← links)
- ML20128D267 (← links)
- B11570, Highlights Recent Major Milestones in Fuel Performance Program.Three Investigations Conducted During Last Half of Cycle 6 Operation & Weld Defects Probed.No Significant mfg- Related Failure Mechanisms Noted (← links)
- B11590, Forwards Supplemental Info Describing Zone Enriched Assembly Configuration Implemented in Feed Fuel Regions for Cycle 7 (← links)
- B11561, Forwards Reload Safety Analysis in Support of Cycle 7 Reload.Core Reload Will Not Adversely Affect Plant Safety (← links)
- B11568, Forwards Results of Core Barrel Insp Performed During Cycle 7 Refueling outage.Through-wall Cracks at Thermal Shield Support Lugs 4 & 5 Not Propagated (← links)
- B11569, Application for Amend to License DPR-65,revising Tech Spec Sections 3.2.1,Page 3/4 2-1 & 3.2.2.2,Page 3/4 2-6 Re Cycle 7 Reload,Based on Discussions W/Nrc (← links)
- B11486, Forwards Small Break Loca/Eccs Performance Analysis W/Axial Shape Index of -0.10. Encl Analysis Amends Loca/Eccs Analysis Provided in Per 10CFR50,App K-II.1.b. Previous Reviews Re Effects of Reloads Remain Valid (← links)
- B11437, Application for Amend to License DPR-65,consisting of Proposed Revs to Tech Specs for Preliminary Reload Safety Analysis Re Cycle 7 Refueling (← links)
- B10927, Provides Summary of Reevaluations of LOCA Based on Identification of Several Assemblies Containing Leaking Fuel Pins & fuel-related Damage Which Necessitated Rev to Cycle 6 Core Loading Pattern (← links)