Pages that link to "ML021140015"
Jump to navigation
Jump to search
The following pages link to ML021140015:
Displayed 23 items.
- ML11305A147 (← links)
- ML11305A135 (← links)
- RS-06-147, Quad, Units 1 & 2 - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint Tolerance and Standby Liquid Control System Enrichment (← links)
- ML061310396 (← links)
- RS-11-022, Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. (← links)
- RS-16-187, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- RS-10-032, Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) (← links)
- RS-09-152, Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System (← links)
- RS-09-104, Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage (← links)
- RS-19-023, Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1 (← links)
- ML053130192 (← links)
- RS-05-075, Request for Amendment to Technical Specifications Associated with Feedwater System and Main Turbine High Water Level Trip Instrumentation (← links)
- RS-04-133, Request for Changes Related to Technical Specifications Section 3.4.9, Reactor Coolant System Pressure-and Temperature (Pit) Limits. (← links)
- SVP-04-099, Renewal of National Pollutant Discharge Elimination System (NPDES) Permit No. Il 0005037 (← links)
- RS-03-165, Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing (← links)
- RS-03-087, Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30D (← links)
- RS-03-038, Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function (← links)
- RS-02-152, . Request for Technical Specifications Surveillance Requirement 3.3.4.1.2 Change Related to Anticipated Transient Without Scram- Recirculation Pump Trip Instrumentation (← links)
- ML021990388 (← links)
- TAC:MB3626 (← links)
- ML020910005 (← links)
- RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days (← links)