Pages that link to "L-2022-053, Submission of Periodic Reports"
Jump to navigation
Jump to search
The following pages link to L-2022-053, Submission of Periodic Reports:
Displayed 50 items.
- L-2018-054, Turkey Point, Units 3 and 4 - 2017 Annual Radioactive Effluent Release Report (← links)
- L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 (← links)
- L-2015-217, Turkey, Unit 3 - Special Report Regarding Accident Monitoring Instrumentation (← links)
- L-2014-114, Proposed Change to Turkey Point Units 3 and 4 Technical Specifications to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents. License Amendment Request No. 233 (← links)
- L-2014-250, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1) (← links)
- L-2014-253, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit (← links)
- L-2014-237, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit (← links)
- L-2014-249, Request for Revision of Enforcement Discretion Regarding Technical Specification 3/4.7.4, Ultimate Heat Sink (← links)
- L-2014-235, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information (← links)
- L-2014-040, Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 4 (← links)
- L-2014-045, 2013 Annual Report of Reactor Coolant Specific Activity Limits for Turkey Point Units 3 and 4 in Docket Nos. 50-250 and 50-251 (← links)
- L-2013-319, Florida Power & Light Company'S Turkey Point Units 3 and 4, Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns (← links)
- L-2012-398, Turkey Point, Units 3 and 4, Transmittal of 10 CFR 50 Appendix E Evacuation Time Estimate Study (← links)
- L-2012-248, Turkey Point, Units 3 and 4, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone Change (← links)
- L-2011-349, Turkey Point Initial Exam 2011-302 General Correspondence (← links)
- L-2012-007, Turkey Points, Units 3 & 4, Response to Reactor System Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation (← links)
- L-2011-190, Turkey Point, Units 3 and 4 - Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues (← links)
- L-2011-032, Turkey Point, Units 3 and 4 - Supplement 1 to Fuel Storage Criticality Analysis (← links)
- L-2011-036, Turkey Point, Units 3 & 4 - Response to NRC Request for Additional Information (RAI) Regarding NRC General Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate (LAR 205) (← links)
- L-2010-235, LER, Turkey Point, Units 3 and 4, Special Report - Accident Monitoring Instrumentation Inoperable (← links)
- L-2010-212, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update - Resubmission (← links)
- L-2010-173, Turkey Point, Unit 4, BADGER Test Results - License Condition 3.H(b) (← links)
- L-2010-169, Turkey Point, Units 3 and 4 - Fuel Storage Criticality Analysis (← links)
- L-2010-031, Turkey Point, Units 3 & 4, 2009 Annual Radioactive Effluent Release Report (← links)
- L-2009-240, Core Operating Limits Report for Turkey Point Unit 4 (← links)
- L-2009-249, Issuance of Amendment Regarding Spent Fuel Boraflex Remedy Supplement 3 to Request for a Change in Implementation Date (← links)
- L-2009-247, Issuance of Amendment Regarding Spent Fuel Boraflex Remedy - Supplement 2 to Request for a Change in Implementation Date (← links)
- L-2009-151, Turkey Point, Units 3 and 4, License Amendment Request No. 197 for H*: Alternate Repair - Criteria for Steam Generator Tubesheet Expansion Region (← links)
- L-2009-176, Response in Support of Turkey Point Unit 3 Extension Request - Alternative Approach for Demonstrating Turkey Point Unit 3 Compliance with Generic Letter (GL) 2004-02 Using Turkey Point Unit 4 Integrated Test Data (← links)
- L-2009-155, LER 09-02-00 for Turkey Point, Unit 3 MSIV Drain Line Leak Causes Technical Specification Required Shutdown; Failure to Perform PMT Causes Inoperable MSIV (← links)
- L-2009-135, Turkey Point, Units 3 & 4 - Response to NRC Trace Plant Model Data Request - Extended Power Uprate (← links)
- L-2018-136, L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations (← links)
- L-2018-136, L-2018-136-Attachment 46 Enclosure 2 - Letter from Miami-Dade County, Dept. of Regulatory and Economic Resources Dated July 10, 2018 on Site Assessment Report (← links)
- L-2018-136, L-2018-136-Attachment 46 Enclosure 1 - Letter from Bob Bertelson, FLP Dated March 25, 2016 on Total Suspended Solids to Florida Dept. of Environmental Protection (← links)
- L-2018-136, L-2018-136-Attachment 44 Enclosure 1 - Cumulative Hypersaline Groundwater Withdrawals (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 20 - Upper Floridan Freshening Wells (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 19 - South Florida Water Management District Pumpage Report for Water Use Permit (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 18 - South Florida Water Management District Pumpage Report for Water Use Permit (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 17 - South Florida Water Management District Pumpage Report for Water Use Permit (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 16 - South Florida Water Management District Pumpage Report for Water Use Permit (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 15 - FPL Turkey Point Unit 5 Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 14 - South Florida Water Management District Pumpage Report for Water Use Permit (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 13 - Florida Power & Light Company - Conditions of Certification PA-03-45E for Turkey Point Units 3-5 (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 12 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Unit 3-5 (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 11 - FPL Turkey Point Unit 5 Groundwater Monitoring Plan Forty-Seventh Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 10 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Units 3-5 (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 9 - FPL Turkey Point Unit 5 Groundwater Monitoring Plan Forty-Sixth Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 8 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Units 3-5 (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 7 - FPL Turkey Point Unit 5 Groundwater Monitoring Plan Forty-Fifth Quarterly Well Report (← links)