Pages that link to "L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (Rict) for the 120-Volt AC Instrument Bus Requirements"
Jump to navigation
Jump to search
The following pages link to L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (Rict) for the 120-Volt AC Instrument Bus Requirements:
Displayed 50 items.
- ML15356A185 (← links)
- ML15356A184 (← links)
- ML15219A184 (← links)
- ML18114A120 (← links)
- ML18110A141 (← links)
- ML18108A607 (← links)
- ML18098A070 (← links)
- ML18127B128 (← links)
- ML18127A500 (← links)
- L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) (← links)
- L-2015-259, ANP-3440NP, Revision 1, Response to NRC Questions SRXB-RAI-1 and Snpb RAI-2 Thru Snpb RAI-20. (← links)
- L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (← links)
- L-77-245, Letter Forwarding Additional Information Regarding Neutron Shielding in the Reactor Vessel Cavity (← links)
- L-76-326, Response to Letter of 8/13/1976 to Evaluate Reactor Coolant System Design and Provide Certain Information Regarding Susceptibility to Overpressurization Events, FP&L Will Report the Results by 10/15/1976 (← links)
- L-76-381, Response to Request of 9/30/1976 for Information on Operating Experience with Loose-Parts and Loose-Parts Monitoring System (← links)
- L-76-416, Response to Letter of 11/5/1976, Forwards Requested Additional Appendix I Information (← links)
- L-77-111, 04/08/1977 Response to Request for Additional Information Steam Generator Operating History (← links)
- L-78-175, Forwards Responses to Questions from NRC Regarding Cycle 2 Reload Safety Evaluation (← links)
- L-78-180, Response to Nrc'S 5/17/1978 Letter, Fp&L'S Commitment to Complete Testing Concerning Resistance Temperature Detector Response Times by 12/1/1978 (← links)
- L-78-177, Response to Letter of 5/8/1978 Requesting Certain Information to Complete Review of Application to Restart St. Lucie Unit 1 Following Refueling. FP&L Will Provide Schedule to Responses by 6/8/1978 (← links)
- L-78-199, Forwards Response to Two Staff Positions on Diesel Generator Lockout Enclosed in 5/8/1978 Letter (← links)
- L-78-207, Forwards Diesel Generator Information in Response to 12/15/1977 Letter (← links)
- L-76-361, Forwards Reactor Vessel Overpressurization Issue Progress Report (← links)
- L-75-600, Response to 11/26/75 Letter Furnishing Information on Reactor Vessel Support Program (← links)
- L-75-371, Letter Responding to the June 27, 1975 Letter Requesting Additional Information Concerning Stalled Hurricanes and Advising That It Will Not Be Possible to Submit the Information Before August 8, 1975 (← links)
- L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 (← links)
- L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change (← links)
- L-2016-096, Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 (← links)
- L-2015-279, RAI Response Clarification for SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel (← links)
- L-2015-270, Request for Additional Information Reply Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements (← links)
- L-2015-258, Request for Additional Reply for License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection Commitment (← links)
- L-2015-179, Response to Request for Additional Information Regarding the Spring 2014 Steam Generator Tube Inspections (← links)
- L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 (← links)
- L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request (← links)
- L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies (← links)
- L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply (← links)
- L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- L-2017-210, Updated Final Response to NRC Generic Letter 2004-02 (← links)
- L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 (← links)
- L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 (← links)
- L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes (← links)
- L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B (← links)
- L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents (← links)
- L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. (← links)
- L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle (← links)
- L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes (← links)
- L-2016-084, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States. (← links)
- L-2016-018, Response to Request for Additional Information Fourth Ten-Year Inservice Inspection Interval License - Amendment Request Changes to Snubber Surveillance Requirements (← links)
- L-2015-304, RAI Reply for the Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents (← links)
- L-2015-211, Response to Request for Additional Information Regarding License Amendment for Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (← links)