Pages that link to "Information Notice 2010-18, Generic Issue 199, Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants."
Jump to navigation
Jump to search
The following pages link to Information Notice 2010-18, Generic Issue 199, Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants.:
Displayed 36 items.
- Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con (← links)
- Information Notice 2010-25, Inadequate Electrical Connections (← links)
- Information Notice 2010-27, Ventilation System Preventive Maintenance and Design Issues (← links)
- Information Notice 2010-23, IN: Malfunctions of Emergency Diesel Generator Speed Switch Circuits (← links)
- Information Notice 2010-21, Crack-Like Indication in the U-bend Region of a Thermally Treated Alloy 600 Steam Generator Tube (← links)
- Information Notice 2010-22, Fuel Assemblies Damaged During Refueling Operations due to Misalignment (← links)
- ML101970221 (redirect page) (← links)
- ML16229A113 (← links)
- ML16259A109 (← links)
- ML16126A033 (← links)
- Information Notice 2010-18, Generic Issue 199, Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants. (← links)
- ML15300A073 (← links)
- ML15212A796 (← links)
- ML15211A005 (← links)
- ML15209A870 (← links)
- ML14289A140 (← links)
- ML14041A373 (← links)
- ML13322A890 (← links)
- ML13144A093 (← links)
- ML13144A092 (← links)
- ML13113A174 (← links)
- ML12324A049 (← links)
- ML12201A623 (← links)
- ML12056A047 (← links)
- ML12053A340 (← links)
- ML12052A305 (← links)
- ML11354A403 (← links)
- ML11298A095 (← links)
- ML11213A203 (← links)
- ML11213A024 (← links)
- Press Release-11-175, Corrected: NRC Seeks Public Input on Draft Generic Letter Regarding Updated Seismic Analyses for U.S. Nuclear Reactors (← links)
- Press Release-11-164, NRC Seeks Public Input on Draft Generic Letter Regarding Updated Seismic Analyses for U.S. Nuclear Reactors (← links)
- Press Release-10-158, NRC Shares Ongoing Seismic Research on Eastern and Central U.S. Nuclear Power Plants (← links)
- ML18246A007 (← links)
- ML18323A103 (← links)
- ML18310A072 (← links)
- FOIA/PA-2011-0259 (← links)
- ML19095B572 (← links)
- ML19291D891 (← links)
- ML20080M857 (← links)
- ML20290A626 (← links)
- PLA-7897, Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. (← links)
- ML21083A267 (← links)
- ML21083A279 (← links)
- ML21162A069 (← links)
- NL-21-0576, Units 1 and 2 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- ML21344A126 (← links)
- ML22082A268 (← links)
- ML23009A354 (← links)
- ML23289A012 (← links)
- Information Notice 2010-18 (redirect page) (← links)
- IR 05000298/2010009 (← links)
- ML16229A113 (← links)
- ML16259A109 (← links)
- ML16126A033 (← links)
- Information Notice 2010-18, Generic Issue 199, Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants. (← links)
- ML15300A073 (← links)
- ML15212A796 (← links)
- ML15209A870 (← links)
- ML15113A187 (← links)
- ML14289A140 (← links)
- ML14273A510 (← links)
- ML14245A386 (← links)
- ML14160B128 (← links)
- ML14092A417 (← links)
- ML14092A416 (← links)
- ML14092A414 (← links)
- ML14092A330 (← links)
- ML14085A426 (← links)
- ML14085A398 (← links)
- ML14050A290 (← links)
- ML14041A373 (← links)
- ML14038A020 (← links)
- ML13338A141 (← links)
- ML13322A890 (← links)
- ML13144A093 (← links)
- ML13144A092 (← links)
- ML13113A174 (← links)
- ML12338A394 (← links)
- ML12324A049 (← links)
- ML12208A429 (← links)
- ML12201A623 (← links)
- ML12088A302 (← links)
- ML12056A047 (← links)
- ML12053A340 (← links)
- ML12052A305 (← links)
- ML12047A300 (← links)
- ML12037A160 (← links)
- ML12037A053 (← links)
- ML11354A403 (← links)
- ML11325A311 (← links)
- ML11298A095 (← links)
- ML11270A060 (← links)
- ML11262A260 (← links)
- ML11262A173 (← links)
- ML11249A193 (← links)
- ML112360114 (← links)
- ML11235A541 (← links)
- ML11216A263 (← links)
- ML11213A203 (← links)
- ML11213A024 (← links)
- ML110910566 (← links)
- ML110390250 (← links)
- ML110140845 (← links)
- ML18065A025 (← links)
- NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5 (← links)
- ML103481289 (← links)
- ML103400547 (← links)
- ML103400523 (← links)
- ML103400510 (← links)
- ML18107A580 (← links)
- ML18102B236 (← links)
- ML120970148 (← links)
- ML120970147 (← links)
- ML18285A204 (← links)
- RS-15-185, Dresden and LaSalle County - Supplemental Information Regarding Seismic Hazard Risk Evaluation and Seismic Hazard Prioritization Results - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of (← links)
- ML18323A103 (← links)
- ML18310A072 (← links)
- ML18288A444 (← links)
- L-MT-17-053, Redacted - Monticello and Independent Spent Fuel Storage Installation - Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 15 (← links)
- NL-15-0926, Request to Revise Technical Specification LCO 3.5.2 for a One-Time Change to Support a Unit 1 Residual Heat Removal Pump Motor Replacement (← links)
- L-12-244, Correction of Errors in the License Renewal Application Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 29 (← links)
- LIC-11-0099, Table B-2 Nuclear Safety Capability Assessment Methodology Review (← links)
- L-11-154, Reply to Request for Additional Information for the Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 10 (← links)
- RS-18-102, License Amendment Request for a One-Time Extension to Technical Specification 3.8.1, AC Sources-Operating, Required Action A.2 (← links)
- NL-18-0039, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ... (← links)
- NL-12-1344, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines. (← links)
- ML18347B366 (← links)
- RS-15-185, County - Supplemental Information Regarding Seismic Hazard Risk Evaluation and Seismic Hazard Prioritization Results - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near. (← links)
- RS-18-142, Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended. (← links)
- SBK-L-14007, Response to Request for Additional Information Regarding License Amendment Request 13-03, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency... (← links)
- PNP 2013-010, Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- SBK-L-11001, Response to Request for Additional Information, NextEra Energy License Renewal Application (← links)
- NOC-AE-11002773, Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA (← links)
- NOC-AE-11002687, Response to Request for Additional Information for the South Texas Project License Renewal Application (← links)
- ML19128A145 (← links)
- ML19128A141 (← links)
- ML19105B263 (← links)
- ML19095B572 (← links)
- ML18109A507 (← links)
- ML19291D891 (← links)
- ML19289B866 (← links)
- ML20080M857 (← links)
- RS-20-052, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4b (← links)
- ML20106F164 (← links)
- ML20150A007 (← links)
- LR-N20-0043, PSEG Nuclear LLC - Response to Request for Additional Information, Adopt 10 CFR 50.69 LAR (← links)
- RS-20-139, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 (← links)
- ML20290A626 (← links)
- PLA-7897, Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. (← links)
- ML21083A267 (← links)
- ML21083A279 (← links)
- ML21125A215 (← links)
- ML21140A324 (← links)
- JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- ML21162A069 (← links)
- W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt (← links)
- NL-21-0576, Units 1 and 2 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- ML21344A126 (← links)
- NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 (← links)
- RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power (← links)
- Information Notice 2010-20, Repetitive Failures of Turbine Driven Auxiliary Feedwater Pumps Due To Ineffective Corrective Actions (← links)
- Information Notice 2010-14, Containment Concrete Surface Condition Examination Frequency And Acceptance Criteria (← links)
- Information Notice 2010-17, Common Cause Failure of Boiling-Water Reactor Recirculation Pumps With Variable Speed Drives (← links)
- Information Notice 2010-13, Failure to Verify that Post-Fire-Shutdown Procedures Can Be Performed (← links)
- Information Notice 2010-09, Importance of Understanding Circuit Breaker Control Power Indications (← links)
- Information Notice 2010-11, Potential for Steam Voiding Causing Residual Heat Removal System Inoperability (← links)
- Information Notice 2010-10, Implementation of a Digital Control System Under 10 CFR 50.59 (← links)
- Information Notice 2010-07, Welding Defects in Replacement Steam Generators (← links)
- Information Notice 2010-05, Management of Steam Generator Loose Parts and Automated Eddy Current Data Analysis (← links)
- Information Notice 2010-04, Diesel Generator Voltage Regulation System Component Due To Latent Manufacturing Defect (← links)
- Information Notice 2010-03, Failures of Motor-Operated Valves Due to Degraded Stem Lubricant (← links)
- Information Notice 2010-06, Inadvertent Control Rod Withdrawal Event While Shutdown (← links)
- Information Notice 2010-01, Pipe Support Anchors Installed Improperly (← links)
- Information Notice 2010-02, Construction-Related Experience with Cables, Connectors, and Junction Boxes (← links)
- Information Notice 2010-23, In: Malfunctions of Emergency Diesel Generator Speed Switch Circuits (← links)
- Information Notice 2010-22, Fuel Assemblies Damaged During Refueling Operations Due to Misalignment (← links)
- Information Notice 2010-13, Failure to Verify That Post-Fire-Shutdown Procedures Can Be Performed (← links)
- Information Notice 2010-23, in: Malfunctions of Emergency Diesel Generator Speed Switch Circuits (← links)
- Information Notice 2010-20, Repetitive Failures of Turbine Driven Auxiliary Feedwater Pumps Due to Ineffective Corrective Actions (← links)
- Information Notice 2010-14, Containment Concrete Surface Condition Examination Frequency and Acceptance Criteria (← links)
- Information Notice 2010-17, Common Cause Failure of Boiling-Water Reactor Recirculation Pumps with Variable Speed Drives (← links)
- Information Notice 2010-04, Diesel Generator Voltage Regulation System Component Due to Latent Manufacturing Defect (← links)
- NRC/NMSS/SFST (← links)
- Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 (← links)
- Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10- (← links)
- FOIA/PA-2011-0259 (← links)
- Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic (← links)
- Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review (← links)