Pages that link to "HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation"
Jump to navigation
Jump to search
The following pages link to HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation:
Displayed 50 items.
- ML17138A220 (redirect page) (← links)
- ML18214A423 (← links)
- ML18214A422 (← links)
- ML18214A421 (← links)
- ML18214A420 (← links)
- HNP-07-178, Shearon Harris, Submittal of Information in Support of NFPA 805 Pilot Observation Reviews (← links)
- HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme (← links)
- HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-045, Shearon Harris, Unit 1 - 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation (redirect page) (← links)
- HNP-17-045 (redirect page) (← links)
- HNP-16-029, Response to Request for Additional Information Regarding License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change (← links)
- HNP-13-114, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns (← links)
- HNP-13-016, Annual Report in Accordance with Technical Specification 6.9.1.2 (← links)
- HNP-12-069, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 139 (← links)
- HNP-07-061, G20060793 - C. S. Hinnant Ltr Shearon Harris, Unit 1, Response to Request for Comment on Proposed Director'S Decision Under 10 CFR 2.206 (← links)
- HNP-06-081, Submittal of Inservice Inspection Summary Report for Harris Nuclear Plant (← links)
- HNP-03-111, Change to Emergency Plan Implementing Procedures for Shearon Harris (← links)
- HNP-01-157, Revised Shearon Harris Nuclear Plant Emergency Plan Implementing Procedures PEP-110 (Revision 8), PEP-230 (Revision 7), PEP-310 (Revision 11) & PEP-110 (Revision 9) (← links)
- ML012270036 (← links)
- HNP-01-115, Changes to Emergency Plan Implementing Procedures (← links)
- HNP-13-001, License Amendment Request to Revise Technical Specification Table 3.3-4 Degraded Voltage Time Delay Values Acceptance Review Supplement (← links)
- HNP-07-105, Response to Requests for Additional Information Regarding the Environmental Review for Shearon Harris Nuclear Power Plant License Renewal Application, Response to RAI No. 1, Item 1 Through Item 7 (← links)
- HNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date (← links)
- HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval (← links)
- HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes (← links)
- HNP-18-042, Annual Environmental (Non-radiological) Operating Report (← links)
- HNP-18-032, Annual Radiological Environmental Operating Report (← links)
- HNP-18-031, Annual Radioactive Effluent Release Report (← links)
- HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation (← links)
- HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval (← links)
- HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O (← links)
- HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.2 (← links)
- HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 1 (← links)
- HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors (← links)
- HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 (← links)
- HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. (← links)
- HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan (← links)
- HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis (← links)
- HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications (← links)
- HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements. (← links)
- HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal (← links)
- HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection (← links)