Pages that link to "HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan"
Jump to navigation
Jump to search
The following pages link to HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan:
Displayed 50 items.
- ML17296A323 (redirect page) (← links)
- HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval (← links)
- HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval (← links)
- RA-20-0312, Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection Program, Fourth Ten-Year Interval (← links)
- ML092310353 (← links)
- ML081330466 (← links)
- ML081330465 (← links)
- ML081330464 (← links)
- ML080460093 (← links)
- HNP-07-178, Shearon Harris, Submittal of Information in Support of NFPA 805 Pilot Observation Reviews (← links)
- HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme (← links)
- HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-025, Shearon Harris Nuclear Power Plant, Unit 1, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan (redirect page) (← links)
- HNP-17-025 (redirect page) (← links)
- HNP-16-029, Response to Request for Additional Information Regarding License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change (← links)
- HNP-13-114, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns (← links)
- HNP-13-016, Annual Report in Accordance with Technical Specification 6.9.1.2 (← links)
- HNP-12-069, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 139 (← links)
- HNP-07-061, G20060793 - C. S. Hinnant Ltr Shearon Harris, Unit 1, Response to Request for Comment on Proposed Director'S Decision Under 10 CFR 2.206 (← links)
- HNP-06-081, Submittal of Inservice Inspection Summary Report for Harris Nuclear Plant (← links)
- HNP-03-111, Change to Emergency Plan Implementing Procedures for Shearon Harris (← links)
- HNP-01-157, Revised Shearon Harris Nuclear Plant Emergency Plan Implementing Procedures PEP-110 (Revision 8), PEP-230 (Revision 7), PEP-310 (Revision 11) & PEP-110 (Revision 9) (← links)
- HNP-13-001, License Amendment Request to Revise Technical Specification Table 3.3-4 Degraded Voltage Time Delay Values Acceptance Review Supplement (← links)
- HNP-07-105, Response to Requests for Additional Information Regarding the Environmental Review for Shearon Harris Nuclear Power Plant License Renewal Application, Response to RAI No. 1, Item 1 Through Item 7 (← links)
- HNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date (← links)
- RA-18-0066, Cycle 21 Owner'S Activity Report (← links)
- HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval (← links)
- HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes (← links)
- HNP-18-042, Annual Environmental (Non-radiological) Operating Report (← links)
- HNP-18-032, Annual Radiological Environmental Operating Report (← links)
- HNP-18-031, Annual Radioactive Effluent Release Report (← links)
- HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation (← links)
- HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval (← links)
- HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O (← links)
- HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.2 (← links)
- HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 1 (← links)
- HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors (← links)
- HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 (← links)
- HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. (← links)
- HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis (← links)
- HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications (← links)
- HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements. (← links)
- HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal (← links)
- HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection (← links)
- HNP-17-040, Snubber Program Plan (← links)