Pages that link to "DCL-24-045, Annual Report of Occupational Radiation Exposure for 2023"
Jump to navigation
Jump to search
The following pages link to DCL-24-045, Annual Report of Occupational Radiation Exposure for 2023:
Displayed 50 items.
- DCL-17-022, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 (← links)
- DCL-15-095, Response to NRC Request for Additional Information Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report (← links)
- DCL-15-054, One Hundred Eighty-Day Steam Generator Report for Diablo Canyon Power Plant, Unit 2, Eighteenth Refueling Outage (← links)
- DCL-15-044, Decommissioning Funding Report for Diablo Canyon, Units 1 and 2 (← links)
- DCL-15-042, Supplemental Licensee Event Report 1-2014-004-01 for Diablo Canyon, Units 1 and 2 Regarding Actuation of Six Emergency Diesel Generators Due to Loss of Offsite Power (← links)
- DCL-15-041, Supplemental LER 2-13-004-01 for Diablo Canyon, Unit 2 Regarding Technical Specification 3.8.1 Not Met Due to Failed Wire Lug on Emergency Diesel Generator 2-3 (← links)
- DCL-15-009, Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement (← links)
- DCL-14-045, Response to NRC Request for Additional Information Regarding Bequest for Preemption Authority (← links)
- DCL-14-030, Diablo, Units 1 and 2 - Report of 10 CFR 50.59, Changes, Tests and Experiments, for the Period of January 1, 2012 Through December 31, 2013 (← links)
- DCL-14-028, Conclusions of a Third Party Review of Areva Calculations (← links)
- DCL-13-103, Response to NRC Request for Additional Information Regarding Implementation of Multi-Unit/Multi-Source Dose Assessment Capability (← links)
- DCL-13-061, CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 2 (← links)
- DCL-12-117, 2011 Annual Commitment Change Summary Report (← links)
- DCL-08-549, Third Quarter 2008 Report on Discharge Monitoring at Diablo Canyon Power Plant (← links)
- DCL-10-125, Notification Letter Designating Diablo Canyon Balance of Plant Systems within the Cyber Security Rule Scope (← links)
- DCL-10-066, License Amendment Request 10-03, Damping Values for the Seismic Design and Analysis of the Reactor Vessel Integrated Head Assembly (← links)
- DCL-09-093, License Amendment Request 09-07, Delayed Access Offsite Power Circuit Conformance with GDC 17 (← links)
- DCL-06-131, Special Report 06-04: Results of Steam Generator Tube Eddy Current Inspections During Unit 1 Thirteenth Refueling Outage (← links)
- DCL-06-100, Special Report 06-02 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon Power Plant Unit 2 Thirteenth Refueling Outage (← links)
- DCL-06-080, PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage (← links)
- DCL-04-003, December 2003 Monthly Operating Report for Diablo Canyon (← links)
- DCL-05-154, Requests NRC Authorization for 10 CFR 50.55a Request No. NDE-SGW for Diablo Canyon Unit 2 for Duration of Unit 2 Second Inspection Interval (← links)
- DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight (← links)
- DCL-16-066, LTR-16-0333 Edward D. Halpin, Senior Vice President, Generation and Chief Nuclear Officer, Pacific Gas and Electric Company, Letter Request to Suspend NRC Review of Diablo Canyon Power Plant License Renewal Application (← links)
- DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294) (← links)
- DCL-11-022, Pacific Gas and Electric Company Supplements a Response to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application (← links)
- DCL-10-167, Response to NRC Letter Dated December 20, 2010, Request for Additional Information (Set 36) for the Diablo Canyon License Renewal Application (← links)
- DCL-10-163, Canyon, Units 1 & 2 - Response to Telephone Conference Call Held Nov. 18, 2010, Between U.S. Nuclear Regulatory Commission and Pacific Gas & Electric Co. Concerning Responses to Requests for Additional Information Related to License Renew (← links)
- DCL-10-131, Response to NRC Letter Dated September 23, 2010, Request for Additional Information (Set 25) for the Diablo Canyon License Renewal Application (← links)
- DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 (← links)
- DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 (← links)
- DCL-18-021, Core Operating Limits Report for Unit 2 Cycle 21 (← links)
- DCL-17-072, Core Operating Limits Report for Cycle 21 (← links)
- DCL-17-060, Response to NRC Request for Additional Information Regarding Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 (← links)
- DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint (← links)
- DCL-16-056, One Hundred Eighty-Day Steam Generator Report for Nineteenth Refueling Outage (← links)
- DCL-16-003, Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- DCL-15-144, Core Operating Limits Report for Cycle 20 (← links)
- DCL-15-118, Response to NRC Request for Additional Information Regarding Relief Request FLIG-U1 (← links)
- DCL-15-062, Expected Submittal Date for Licensee Event Report 2015-001-01 (← links)
- DCL-15-014, Expected Submittal Date for Licensee Event Report 2014-002-01 (← links)
- DCL-14-068, Response to NRC Request for Additional Information Regarding Relief Request SWOL-REP-1 U2 (← links)
- DCL-14-041, Response Update to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic (← links)
- DCL-14-024, Core Operating Limits Report for Cycle 19 (← links)
- DCL-13-078, Response to NRC Request for Additional Information Regarding Request for Relief NDE-RCS-SE-1R18 to Allow Use of Alternative Depth Sizing Criteria (← links)
- DCL-13-063, Inservice Inspection Report for Seventeenth Refueling Outage (← links)
- DCL-13-054, Response Amendment to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic (← links)
- DCL-13-030, Core Operating Limits Report for Unit 2 Cycle 18 (← links)
- DCL-12-118, Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic Unit 1. Part 1 of 2 (← links)
- DCL-12-089, Inservice Inspection Report for Unit 1 Seventeenth Refueling Outage (← links)