Pages that link to "CNL-20-044, License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis"
Jump to navigation
Jump to search
The following pages link to CNL-20-044, License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis:
Displayed 50 items.
- FLEX (← links)
- Tornado Missile (← links)
- Mission time (← links)
- Tornado Generated Missile (← links)
- Internal Flooding (← links)
- Tornado-Generated Missile (← links)
- ML13227A103 (← links)
- ML13092A393 (← links)
- ML13070A307 (← links)
- ML12242A477 (← links)
- ML18079B140 (← links)
- NL-13-148, Browns Ferry, Unit 1, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484) (← links)
- ML18171A337 (← links)
- ML093350655 (← links)
- ML093080158 (← links)
- ML081760567 (← links)
- ML080910360 (← links)
- Probabilistic Risk Assessment (← links)
- ML071790514 (← links)
- ML063180579 (← links)
- ML063170065 (← links)
- ML062990302 (← links)
- ML062210458 (← links)
- ML061290590 (← links)
- ML061110102 (← links)
- ML060950060 (← links)
- ML060410288 (← links)
- Incorporated by reference (← links)
- CNL-17-014, Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Pro (← links)
- CNL-14-074, Redacted Version of License Amendment Request (TS-488) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 (← links)
- CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 (← links)
- CNL-17-056, Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) (← links)
- CNL-16-010, Application to Modify Technical Specification 4.3.1.2, Fuel Storage Criticality (TS-508) (← links)
- CNL-16-016, License Amendment Request (BFN TS-509) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 (← links)
- CNL-16-068, Update to License Amendment Request, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) (← links)
- CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) (← links)
- CNL-15-073, Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And. (← links)
- CNL-15-074, Update to License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (← links)
- CNL-15-029, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TS-502) (← links)
- CNL-14-166, Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479) (← links)
- CNL-14-144, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits (BFN TS-494) (← links)
- CNL-16-155, Application to Revise Technical Specifications to Adopt TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, to Request Alternative to the ASME Code, and To.. (← links)
- Tornado Missile Risk Evaluator (← links)
- CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) (← links)
- CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report (← links)
- High winds (← links)
- CNL-19-034, to TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3.. (← links)
- CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision (← links)
- CNL-18-099, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results (← links)
- CNL-13-126, Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs-TS-485 (← links)