Pages that link to "3F0698-17, Submits Results of Evaluation to NRC Re GL 87-02, Verification of Seismic Adequacy of Mechanical of Condenser & Electrical Equipment in Operating Reactors (USI A-46) for Evaluation of Condenser Hotwell Suction Isolation Valve"
Jump to navigation
Jump to search
The following pages link to 3F0698-17, Submits Results of Evaluation to NRC Re GL 87-02, Verification of Seismic Adequacy of Mechanical of Condenser & Electrical Equipment in Operating Reactors (USI A-46) for Evaluation of Condenser Hotwell Suction Isolation Valve:
Displayed 15 items.
- ML20141K807 (← links)
- ML20134C265 (← links)
- ML20199J359 (← links)
- ML20248H803 (redirect page) (← links)
- ML20216F560 (← links)
- 3F0698-17 (redirect page) (← links)
- 3F0398-16, Forwards Response to 980202 RAI Re Summary Rept on Resolution of USI A-46, Seismic Qualification of Equipment in Operating Npps. Confirmatory self-assessment of USI A-46 Resolutions Will Be Submitted,As Committed Previously (← links)
- 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 (← links)
- 3F1297-24, Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings (← links)
- 3F0198-42, Forwards Rev 8 to Abnormal Procedure (AP) 961, Earthquake, as Supplemental Response for Resolution of USI A-46 (← links)
- 3F1298-01, Forwards Response to NRC 980410 RAI Re Audit Rept of USI A-46,seismic Implementation & Subsequent Evaluations of Related Issues at Crystal River,Unit 3 (← links)
- 3F0194-02, Clarifies Licensees Position on Use of Floor Response Spectra at Unit 3 for Resolution of USI A-46 (← links)
- ML20058P184 (← links)
- 3F1093-04, Provides Response to Request for Addl Info Re Floor Spectra for Resolution of USI A-46 (← links)
- 3F0993-04, Forwards Response to 5 of 6 RAIs in NRC Re Floor Response Spectra for Resolution of USI A-46.Floor Response Spectra for Upper Two Floors in Reactor Bldg in Process of Development & Will Be Provided by 931015 (← links)