Pages that link to "3F0298-02, Forwards Status of Requirements Stated in SE Submitted W/ License Amend 163.Status of SE Requirements Do Not Invalidate or Alter Any Conclusions,Or Basis of Any Conclusion,Supporting TS Issued in License Amend 163"
Jump to navigation
Jump to search
The following pages link to 3F0298-02, Forwards Status of Requirements Stated in SE Submitted W/ License Amend 163.Status of SE Requirements Do Not Invalidate or Alter Any Conclusions,Or Basis of Any Conclusion,Supporting TS Issued in License Amend 163:
Displayed 20 items.
- IR 05000302/1997007 (← links)
- ML20199E395 (← links)
- ML20199B738 (← links)
- ML20199B442 (← links)
- ML20203C969 (redirect page) (← links)
- ML20203C390 (← links)
- 05000302/LER-1997-039, Corrected Page 1 to LER 97-039-00,adding Rept Date in Block 7.On 971108,unqualified Matl Discovered Left in Reactor Bldg During Const.Caused by Personnel Error.Polystyrene Permanently Installed (← links)
- ML20202E567 (← links)
- ML20202D416 (← links)
- ML20236U596 (← links)
- ML20216J910 (← links)
- 3F1297-38, Forwards Addl Info on Validations of Proposed Emergency Operating Procedures Containing Operator Actions Related to TS Change Request 210,per 971203 Telcon (← links)
- 3F0298-02 (redirect page) (← links)
- 3F0298-02, Forwards Status of Requirements Stated in SE Submitted W/ License Amend 163.Status of SE Requirements Do Not Invalidate or Alter Any Conclusions,Or Basis of Any Conclusion,Supporting TS Issued in License Amend 163 (← links)
- 3F0998-15, Clarifies Current Licensing Basis for Time Necessary to Start Control Complex Chillers at Crystal River Unit 3 (CR-3) After loss-of-offsite Power (← links)
- 3F1297-32, Provides NRC Requested Clarification Re Use of HPI Flow Throttling TS Change Request Notice 210.No New Commitments Made in Submittal (← links)
- 3F1297-27, Forwards Response to 971126 RAI Re TS Change Request 210, Which Addresses Design & Licensing Basis Changes Primarily Involving Plant Systems Used to Mitigate Consequences of Certain Small Break LOCA (← links)
- 3F1197-45, Submits Rev 1 to TS Change Request Notice 210,which Proposes Amends to OL DPR-72.Rev Addresses Changes Resulting from NRC Review of TS Change Request Notice 210.Rev Involves Additional Restrictions,Editorial Clarifications & Typos (← links)
- 3F1197-54, Forwards Copy of Proposed Rev 5 to EOP-8, LOCA Cooldown, as Committed in (← links)
- 3F0198-35, Forwards Complete Updated TS & Bases Pages to TS Change Request Notice 210 Submitted on 970614.Updated Pages Reflect Changes Identified in Licensee ,Correction of Typo & Addition of Footnotes (← links)
- 3F0198-29, Informs That Util in Conjunction W/Framatome Technologies Inc,Completed Confirmation Which Includes Consideration of SG Tube Plugging Levels Specific for CR-3.Util Verified That LOCA Analyses of Record Does Not Require Manual Actuation (← links)
- 3F1297-47, Forwards Response to 971219 RAI Re TS Change Request Notice 210,addressing Design & Licensing Basis Changes Involving Plant Systems Used to Mitigate Consequences of Certain Sbloca.Commitments Made by Util Also Encl (← links)