Pages that link to "2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan"
Jump to navigation
Jump to search
The following pages link to 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan:
Displayed 50 items.
- ML103630579 (← links)
- ML102250418 (← links)
- 1CAN071501, Arkansas, Unit 1 - 90-Day Response to Request for Additional Information Adoption of National Fire Protection Association Standard NFPA-805 (← links)
- 1CAN031503, Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Arkansas Nuclear One, Unit 1 (← links)
- 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) (← links)
- 2CAN061406, Arkansas, Unit 2 - Response to Request for Additional Information Adoption of National Fire Protection Association Standard NFPA-805 (← links)
- 2CAN051405, LER 14-01-00 for Arkansas Nuclear One, Unit 2 Regarding Operation of Switchgear Rooms Ventilation Prohibited by Technical Specifications (← links)
- 1CAN051401, Time-Limited Aging Analysis Regarding Reactor Vessel Internals Loss of Ductility for Arkansas Nuclear One, Unit 1 at 60 Years Arkansas Nuclear One Unit 1 (← links)
- 2CAN031402, ANO, Unit 2, LAR Supplemental Containement Building Emergency Escape Air Lock Testing and Exemption from Certain Requirements of 10 CFR 50, App J (← links)
- 2CAN011402, License Amendment Request - Containment Building Emergency Escape Air Lock Testing and Exemption from Certain Requirements of 10 CFR 50, Appendix J (← links)
- 1CAN121301, Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits (← links)
- 2CAN121303, Response to Request for Additional Information Adoption of Technical Specification Task Force (TSTF)-422 (← links)
- 1CAN011201, Arkansas, Unit 1 - Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (← links)
- 2CAN011105, Arkansas Nuclear One, Unit 2, Inservice Inspection Plan for Fourth 10-Year Interval (← links)
- 1CAN081004, Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop (← links)
- 2CAN061003, Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years (← links)
- 2CAN041004, Response to Request for Additional Information on Request for Alternative ANO2-ISI-004 (← links)
- 1CAN030905, Post-Outage Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Arkansas Nuclear One (← links)
- 1CAN060801, Arkansas, Unit 1, Request for Extension of Completion Date for Resolution of Generic Letter 2004-02 (← links)
- 2CAN020802, License Amendment Request Replacement of Containment Sump Buffer Request for Additional Information, Arkansas Nuclear One, Unit 2 (← links)
- 1CAN050705, ANO - 1 Weld Overlay Examination Results (← links)
- 1CAN050701, Arkansas - Unit 1 - Cycle 21 Core Operating Limits Report (← links)
- ML071150108 (← links)
- 2CAN030701, Arkansas One, Unit 2, License Amendment Request, Proposed Technical Change Regarding Containment Spray Nozzle Test Requirements (← links)
- 2CAN010702, Arkansas, Unit 2 - Inservice Inspection (ISI) Summary Report (← links)
- 1CAN100602, Supplemental Information to License Amendment Request to Support Use of Metamic Poison Insert Assemblies in Spent Fuel Pool, Arkansas Nuclear One, Unit 1 (← links)
- 2CAN090601, Response to Request for Additional Information on ANO-2 Steam Generator Tube Inservice Inspection Report (← links)
- 2CAN060601, Arkansas, Unit 2 - Revision Report of Containment Building Tendon Surveillance and Concrete Inspection (← links)
- 2CAN050603, Arkansas, Unit 2 - Supplement to Amendment Request to Allow One-time Extension of Containment Spray System Allowable Outage Time (← links)
- 1CAN040601, Arkansas, Unit 1 - Inservice Inspection Summary Report (← links)
- 2CAN040602, Arkansas, Unit 2 - Request for Relaxation to NRC Order EA 03-09 Regarding Bare Metal Visual Inspection on the ANO-2 Reactor Vessel Hand (← links)
- 1CAN050601, Arkansas, Unit 1 - Withdrawal of Proposed Operating License Amendment for Revised ANO-1 Control Room Habitability Analysis (← links)
- 2CAN030601, Steam Generator Tube Inservice Inspection Report Arkansas Nuclear One - Unit 2 (← links)
- 2CAN020602, Arkansas, Unit 2 - Supplement to Amendment Request to Allow One-Time Extension of Containment Spray System Allowable Outage Time (← links)
- 1CAN010604, Arkansas, Unit 1 - 60-Day Report for Plant Alloy 600 Inspections for Refueling Outage 1R19 (← links)
- 1CAN061601, Request for Alternative from Volumetric/Surface Examination Frequency - Requirements of ASME Code Case N-729-1 - Arkansas Nuclear One, Unit 1 (← links)
- 1CAN031604, Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Co (← links)
- 1CAN051402, Arkansas, Unit 1, Notification of Revised License Renewal Commitments (← links)
- 2CAN051403, License Amendment Request Supplemental, Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186). (← links)
- 1CAN041401, Request for Implementation Date Relief in Response to March 12, 2012,Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) (← links)
- 2CAN121201, Revised Request for Alternative ANO2-ISI-007 Code Case N-770-1 Baseline Examination Arkansas Nuclear One, Unit 2 (← links)
- 1CAN100902, Arkansas, Unit 1 - License Amendment Request Supplemental Regarding Technical Specification Changes for Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (← links)
- 1CAN030804, Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 1 (← links)
- CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals (← links)
- CNRO-2007-00009, Arkansas One, Unit 1 - Request for Alternative ANO1-ISI-008, Request to Extend the Current ASME Inservice Inspection Interval in Accordance with NRC Information Notice 98-44 (← links)
- 2CAN111801, Supplemental to the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) (← links)
- 1CAN101801, Response to Request for Additional Information Related to the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to ... (← links)
- 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report (← links)
- 2CAN101801, Responses to the Request for Additional Information Regarding License Amendment Request to Update the Reactor Coolant System Pressure-Temperature Limits (← links)
- 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval (← links)