Pages that link to "10 CFR 60.73, Reports of Deficiencies"
Jump to navigation
Jump to search
The following pages link to 10 CFR 60.73, Reports of Deficiencies:
Displayed 50 items.
- 10 CFR 60.73 (redirect page) (← links)
- 10 CFR 60 (← links)
- 05000219/LER-2014-005, Secondary Containment Declared Inoperable (← links)
- ML17157C140 (← links)
- ML11171A066 (← links)
- ML16321A447 (← links)
- ML062830533 (← links)
- ML061660373 (← links)
- ML061660370 (← links)
- ML061660368 (← links)
- ML061660365 (← links)
- ML041910310 (← links)
- ML20128C238 (← links)
- ML20212E724 (← links)
- ML22326A244 (← links)
- 05000293/LER-1997-026, :on 971206,automatic Scram Was Initiated.Caused by High Reactor Water Level During Power Ascension.Pilot Valve Clip Was Repositioned Inside Bailey Positioner & Valve Was Stroked Smoothly (← links)
- 05000443/LER-1997-005, :on 970314,misposition of Main Steam Line Radiation Monitors Was Discovered.Caused by Human & Misjudgement Errors.Design Change Was Implemented to Relocate MSLRMs Approx 24 Inches Upstream (← links)
- 05000336/LER-1997-002-01, :on 970108,damper 2-HV-210 Could Not Be Manually Operated within Ten Minutes as Required in Accident Analysis.Caused by Inadequate Evaluation of Mechanical Binding.Damper Was Placed in Fail Open Position (← links)
- 05000409/LER-1985-014, :on 850725,partial Reactor Scram Occurred,Hpcs Pumps & Emergency Diesel Generators Started & Containment Bldg Isolated.Caused by Ground in Gas Pressure Scram Circuit.Ground Located & Wire Repaired (← links)
- 05000352/LER-1990-029-01, :on 901128,personnel Received Main Control Room Annunciator Alarm Associated W/Toxic Gas Detection Sys. Caused by Failure of Toxic Gas Analyzer Memory.Vendor Contacted to Provide Addl Actions (← links)
- 05000289/LER-1990-003, :on 900227,turbine Bypass Valves Isolated During Plant Heatup Due to Main Steam Valve Closure.Caused by Personnel Error.Personnel Reviewed Event to Emphasize Need to Follow Administrative Requirements (← links)
- 05000368/LER-1989-019-02, :on 890927,identified That Closing Torque on Valves May Be Insufficient Against Postulated Worst Case Differential Pressure.Caused by Initial Plant Construction. Mod to Replace Gearing Made to Motor Operator (← links)
- 05000368/LER-1989-017-01, :on 891005,discovered That Number of Operable Logarithmic Power Level Instrumentation Channels Less than Required by Tech Specs.Caused by Personnel Error.Shift Supervisor & Senior Reactor Operator Counseled (← links)
- ML19324B314 (← links)
- 05000254/LER-2015-004, Regarding Automatic Depressurization System Trip Logic Failure (← links)
- 05000219/LER-2014-005, Regarding Secondary Containment Declared Inoperable (← links)
- 05000254/LER-2014-003, Regarding HPCI Interlock Doors Opened Simultaneously Cause Loss of Secondary Containment (← links)
- 05000219/LER-2013-001, Regarding Automatic Reactor Scram Due to an Invalid Intermediate Range Monitor (IRM) Scram Signal (← links)
- 05000219/LER-2012-002-01, Regarding Loss of Offsite Power During Hurricane Sandy (← links)
- 10 CFR 60 (← links)
- 10 CFR 60.1, Purpose and Scope (← links)
- 10 CFR 60.2, Definitions (← links)
- 10 CFR 60.3, License Required (← links)
- 10 CFR 60.4, Communications and Records (← links)
- 10 CFR 60.5, Interpretations (← links)
- 10 CFR 60.6, Exemptions (← links)
- 10 CFR 60.7, License Not Required for Certain Preliminary Activities (← links)
- 10 CFR 60.8, Information Collection Requirements: Approval (← links)
- 10 CFR 60.9, Employee Protection (← links)
- 10 CFR 60.10, Completeness and Accuracy of Information (← links)
- 10 CFR 60.11, Deliberate Misconduct (← links)
- 10 CFR 60.15, Site Characterization (← links)
- 10 CFR 60.16, Site Characterization Plan Required (← links)
- 10 CFR 60.17, Contents of Site Characterization Plan (← links)
- 10 CFR 60.18, Review of Site Characterization Activities. (← links)
- 10 CFR 60.21, Content of Application (← links)
- 10 CFR 60.22, Filing and Distribution of Application (← links)
- 10 CFR 60.23, Elimination of Repetition (← links)
- 10 CFR 60.24, Updating of Application and Environmental Impact Statement (← links)
- 10 CFR 60.31, Construction Authorization (← links)
- 10 CFR 60.32, Conditions of Construction Authorization (← links)
- 10 CFR 60.33, Amendment of Construction Authorization (← links)
- 10 CFR 60.41, Standards for Issuance of a License (← links)
- 10 CFR 60.42, Conditions of License (← links)
- 10 CFR 60.43, License Specification (← links)
- 10 CFR 60.44, Changes, Tests, and Experiments (← links)
- 10 CFR 60.45, Amendment of License (← links)
- 10 CFR 60.46, Particular Activities Requiring License Amendment (← links)
- 10 CFR 60.47, Facility Information and Verification (← links)
- 10 CFR 60.51, License Amendment for Permanent Closure (← links)
- 10 CFR 60.52, Termination of License (← links)
- 10 CFR 60.61, Provision of Information (← links)
- 10 CFR 60.62, Site Review (← links)
- 10 CFR 60.63, Participation In License Reviews (← links)
- 10 CFR 60.64, Notice to States (← links)
- 10 CFR 60.65, Representation (← links)
- 10 CFR 60.71, Records and Reports (← links)
- 10 CFR 60.72, Construction Records (← links)
- 10 CFR 60.74, Tests (← links)
- 10 CFR 60.75, Inspections (← links)
- 10 CFR 60.78, Material Control and Accounting Records and Reports (← links)
- 10 CFR 60.101, Purpose and Nature of Findings (← links)
- 10 CFR 60.102, Concepts (← links)
- 10 CFR 60.111, Performance of the Geologic Repository Operations Area Through Permanent Closure (← links)
- 10 CFR 60.112, Overall System Performance Objective for the Geologic Repository After Permanent Closure (← links)
- 10 CFR 60.113, Performance of Particular Barriers After Permanent Closure (← links)
- 10 CFR 60.121, Requirements for Ownership and Control of Interests In Land (← links)
- 10 CFR 60.122, Siting Criteria (← links)