Pages that link to "10 CFR 50.20, Two Classes of Licenses"
Jump to navigation
Jump to search
The following pages link to 10 CFR 50.20, Two Classes of Licenses:
Displayed 50 items.
- 10 CFR 50.20 (redirect page) (← links)
- 10 CFR 50 (← links)
- ML13343A006 (← links)
- ML091310218 (← links)
- TMI-13-105, Update 10 of the Post-Defueling Monitored Storage Safety Analysis Report (← links)
- TMI-13-050, Re-issue of Update 9 of the Post-Defueling Monitored Storage Safety Analysis Report (← links)
- ML19275F299 (← links)
- ML19289F385 (← links)
- ML083050449 (← links)
- ML20054L165 (← links)
- ML20054F571 (← links)
- ML20054F339 (← links)
- ML032240282 (← links)
- ML20077S746 (← links)
- ML20113E429 (← links)
- ML20071K790 (← links)
- ML20134G762 (← links)
- ML20134G765 (← links)
- ML20241A017 (← links)
- ML20247F082 (← links)
- ML20236L017 (← links)
- ML21175A287 (← links)
- ML21236A288 (← links)
- ML20210R479 (← links)
- PY-CEI-NRR-2124, Responds to Requests for Info Re Adequacy & Availability of Design Bases Info for Pnpp (← links)
- ML20054F700 (← links)
- 10 CFR 50.54, Conditions of licenses (← links)
- 10 CFR 50.1, Basis, Purpose, and Procedures Applicable (← links)
- 10 CFR 50.2, Definitions (← links)
- 10 CFR 50.3, Interpretations (← links)
- 10 CFR 50.4, Written Communications (← links)
- 10 CFR 50.5, Deliberate Misconduct (← links)
- 10 CFR 50.7, Employee Protection (← links)
- 10 CFR 50.8, Information Collection Requirements: Omb Approval (← links)
- 10 CFR 50.9, Completeness and Accuracy of Information (← links)
- 10 CFR 50.10, License Required; Limited Work Authorization (← links)
- 10 CFR 50.11, Exceptions and Exemptions From Licensing Requirements (← links)
- 10 CFR 50.12, Specific Exemptions (← links)
- 10 CFR 50.13, Attacks and Destructive Acts by Enemies of the United States; and Defense Activities (← links)
- 10 CFR 50.21, Class 104 Licenses; for Medical Therapy and Research and Development Facilities (← links)
- 10 CFR 50.22, Class 103 Licenses; for Commercial and Industrial Facilities (← links)
- 10 CFR 50.23, Construction Permits (← links)
- 10 CFR 50.30, Filing of Application for Licenses; Oath Or Affirmation (← links)
- 10 CFR 50.31, Combining Applications (← links)
- 10 CFR 50.32, Elimination of Repetition (← links)
- 10 CFR 50.33, Contents of Applications; General Information (← links)
- 10 CFR 50.34, Contents of Applications; Technical Information (← links)
- 10 CFR 50.36, Technical Specifications (← links)
- 10 CFR 50.37, Agreement Limiting Access to Classified Information (← links)
- 10 CFR 50.38, Ineligibility of Certain Applicants (← links)
- 10 CFR 50.39, Public Inspection of Applications (← links)
- 10 CFR 50.40, Common Standards (← links)
- 10 CFR 50.41, Additional Standards for Class 104 Licenses (← links)
- 10 CFR 50.42, Additional Standard for Class 103 Licenses (← links)
- 10 CFR 50.43, Additional Standards and Provisions Affecting Class 103 Licenses and Certifications for Commercial Power (← links)
- 10 CFR 50.44, Combustible Gas Control for Nuclear Power Reactors (← links)
- 10 CFR 50.45, Standards for Construction Permits, Operating Licenses, and Combined Licenses (← links)
- 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors (← links)
- 10 CFR 50.47, Emergency Plans (← links)
- 10 CFR 50.48, Fire Protection (← links)
- 10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants (← links)
- 10 CFR 50.50, Issuance of Licenses and Construction Permits (← links)
- 10 CFR 50.51, Continuation of License (← links)
- 10 CFR 50.52, Combining Licenses (← links)
- 10 CFR 50.53, Jurisdictional Limitations (← links)
- 10 CFR 50.55, Conditions of Construction Permits, Early Site Permits, Combined Licenses, and Manufacturing Licenses (← links)
- 10 CFR 50.56, Conversion of Construction Permit to License; Or Amendment of License (← links)
- 10 CFR 50.57, Issuance of Operating License. (← links)
- 10 CFR 50.58, Hearings and Report of the Advisory Committee On Reactor Safeguards (← links)
- 10 CFR 50.59, Changes, Tests and Experiments (← links)
- 10 CFR 50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation (← links)
- 10 CFR 50.61, Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events (← links)
- 10 CFR 50.62, Requirements for Reduction of Risk From Anticipated Transients Without Scram (Atws) Events for Light-Water-Cooled Nuclear Power Plants (← links)
- 10 CFR 50.63, Loss of All Alternating Current Power (← links)
- 10 CFR 50.64, Limitations On the Use of Highly Enriched Uranium (Heu) In Domestic Non-Power Reactors (← links)