Pages that link to "05000461/LER-1998-028, Forwards LER 98-028-00,re Thermal Induced Pressure Locking of Safety Related Power Operated Gate Valves Due to Inadequate Initial Design.Commitment Made by Util,Listed"
Jump to navigation
Jump to search
The following pages link to 05000461/LER-1998-028, Forwards LER 98-028-00,re Thermal Induced Pressure Locking of Safety Related Power Operated Gate Valves Due to Inadequate Initial Design.Commitment Made by Util,Listed:
Displayed 35 items.
- 05000461/LER-1998-027, Forwards LER 98-027-00,re Failure to Perform Surveillance Testing on Div II 4.16 Kv Bus Undervoltage Relay within Specified Frequency.Commitments Listed (← links)
- 05000461/LER-1998-032, Forwards LER 98-032-00 Re Excessive Voltage Drop in Control Circuit for Division 3 Diesel Output Circuit Breaker. Commitments Made by Util,Listed (← links)
- 05000461/LER-1998-030, Forwards LER 98-030-00,re Insufficient Suppression Pool Makeup Volume to Meet Design Basis.Commitments Made by Util, Listed (← links)
- 05000461/LER-1998-031, Forwards LER 98-031-00 Re Surveillance Procedures Which Do Not Adequately Consider Accuracy of Installed Instrumentation in Meeting TS Requirements for DG Loading. Commitments,Listed (← links)
- 05000461/LER-1998-029, Forwards LER 98-029-00 Re Inadequate Overcurrent Protection for Electrical Penetrations.Commitments Made by Util,Listed (← links)
- 05000461/LER-1998-035, Forwards LER 98-035-00 Re Failure to Comply with Tech Specs Action Requirements to Immediately Restore Alternating Current & Direct Current Electrical Power Sources,Due to Inadequate Communications.Rept Contains Listed Commitme (← links)
- 05000461/LER-1998-033, Forwards LER 98-033-00 Re Inappropriate Clearing of Caution Tagout Results in Improved TS LCO 3.4.10 Action A.1 Not Being Met.Encl Rept Contains Listed Commitments (← links)
- 05000461/LER-1998-034, Forwards LER 98-034-00 Re Inattention to Detail During Performance of Design Change Which Caused One Train of SPC Mode of RHR Sys to Be Outside Design Basis.Commitment Made by Util,Listed (← links)
- 05000461/LER-1998-037, Forwards LER 98-037-00 Re Failure to Properly Verify & Validate Surveillance Procedure Leads to Failure to Properly Implement Channel Calibr Surveillance Requirements.Rept Contains Listed Commitment (← links)
- ML20199C826 (redirect page) (← links)
- 05000461/LER-1998-028 (redirect page) (← links)
- 05000461/LER-1998-026, Forwards LER 98-026-00 Re Incorrect Supplier Design,Iaw 10CFR50.73.Commitment Made by Util Listed (← links)
- 05000461/LER-1998-006, Forwards LER 98-006-00 & 10CFR21 Rept 21-98-014 Re Incorrect Calculation in DG Control Circuitry Which Resulted in Insufficient Voltage & Inoperability of Div I Dg. Commitments,Listed (← links)
- 05000461/LER-1998-002, Forwards LER 98-002-00 Re Unplanned ESF Actuation & Manual Scram Due to Loss of Svc Air.Commitments Made by Util, Listed (← links)
- 05000461/LER-1998-036, Forwards LER 98-036-01,re Opening Incorrect Electrical Cubicle,Causing Loss of SD Cooling & Leading to Failure to Meet TS Required Action in Required Time.Encl Rept Contains Listed Commitments (← links)
- 05000461/LER-1998-001, Forwards LER 98-001-00,re Failure of Division 2 Safety Related Battery Charger Due to Deficient Supplier Soldered Connections.Ler Also Contains 10CFR21 Rept.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1998-025, Forwards LER 98-025-00 Re Repeated Failures of Switchgear Heat Condenser Gasket.Rept Contains Commitment to Develop & Install Mod to Add Vacuum Breakers to Div 3 Shutdown Svc Water Sys to Mitigate Pressure Transient (← links)
- 05000461/LER-1998-022, Forwards LER 98-022-00 Re Failure to Perform Surveillance Testing within Specified Frequency Due to Data Input Error. Commitments Made by Util,Listed (← links)
- 05000461/LER-1998-021, Forwards LER 98-021-00,re Cracks in Medium & High Density Silicone Penetration Seals Not Per Design Basis.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1998-024, Forwards LER 98-024-00,re Failure to Perform Surveillance Testing on Divsion II Degraded Voltage Relays within Specified Frequency.Event Still Under Investigation.Rev to LER Expected to Be Submitted by 980907 (← links)
- 05000461/LER-1998-012, Forwards LER 98-012-00, High Differential Pressure Required to Close Excess Flow Check Valves Results in Valves Being Outside of Design Basis of Plant, IAW Requirements of 10CFR50.73 (← links)
- 05000461/LER-1998-016, Forwards LER 98-016-00,re Failure to Test Valves 1SX013D/E/F IAW in-service Testing Program.Commitments Made within Ltr, Listed (← links)
- 05000461/LER-1998-003, Forwards LER 98-003-00, Loss of Nuclear Sys Protection Sys Bus Due to Unknown Cause Results in Inadvertent Isolation of Shutdown Cooling. Listed Commitments Contained in LER (← links)
- 05000461/LER-1998-004, Forwards LER 98-004-01 & 10CFR21 Rept 21-98-004/015, Division 2 Nuclear Systems Protection Sys Inverter Not IAW Plant'S Design Basis Due to Various Deficiencies. Commitments Made by Util,Listed (← links)
- 05000461/LER-1998-018, Forwards LER 98-018-00,re Esfa Caused by Deficiencies in Method Used to Perform Nuclear Sys Protection Sys Power Supply Adjustment.Commitments Listed (← links)
- 05000461/LER-1998-019, Forwards LER 98-019-00 Re Failure to Satisfy TS for Ensuring That Electrical Loads Properly Sequence Onto safety-related Buses.Commitments Made by Util,Listed (← links)
- 05000461/LER-1998-015, Forwards LER 98-015-00 Re ESF Actuation.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1998-023, Forwards LER 98-023-00 Re Failure to Adequately Satisfy TS SR for Division 3 Dg.Event Is Still Under Investigation & Revised LER Will Be Submitted by 980930 (← links)
- 05000461/LER-1998-013, Responds to J Carter Telephone Request for GE to Review Clinton LER 98-013-00 (← links)
- 05000461/LER-1998-020, Forwards LER 98-020-00 Re Inadequate Flow Balancing of Shutdown SWS Which Resulted in Less than Required Flow to SWS Loads.Commitment Made by Util,Listed (← links)
- 05000461/LER-1998-005, Forwards LER 98-005-01 Re Failure to Verify Closed Pcivs,Per TS Sr.Commitments Made in Rept,Listed (← links)
- 05000461/LER-1998-007, Forwards LER 98-007-00,inadequate Engineering Evaluation Leads to Installation of Temporary Mod on DC Electrical Power Sys Which Caused Sys to Be Inoperable When Required to Be Operable by Ts.Ler Contains Listed Commitment (← links)
- 05000461/LER-1998-010, Forwards LER 98-010-00 & 10CFR21 Rept 21-97-060 Re Inoperable Divisions 1 & 2 Hydrogen & Oxygen Analyzers Due to Inadequate Commercial Grade Dedication of safety-related Replacement Parts.Commitments,Listed (← links)
- 05000461/LER-1998-008, Forwards LER 98-008-00,re Division I Hydrogen & Oxygen Analyzer Incapable of Meeting Design Basis Due to an Excessive Vibration Condition on Air Compressor.Caused by Personnel Error.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1998-009, Forwards LER 98-009-00,re Failure to Adequately Account for Design Basis Sys Pressures & Voltages for EDG Air Start Sys. Commitments Made within Ltr,Listed (← links)