Pages that link to "05000298/LER-1981-007, Forwards LER 81-007/03L-0.Detailed Event Analysis Submitted"
Jump to navigation
Jump to search
The following pages link to 05000298/LER-1981-007, Forwards LER 81-007/03L-0.Detailed Event Analysis Submitted:
Displayed 50 items.
- ML20004D757 (redirect page) (← links)
- ML20004D758 (← links)
- 05000298/LER-1981-025-04, /04T-0:on 811224,during Full Power,Discharge Was Made from Floor Drain Sample Tank W/O Adequate Sampling & Analysis of Batch.Caused by Personnel Error.Liquid Discharge Procedures Being Revised.Personnel Reprimanded (← links)
- 05000298/LER-1981-025, Forwards LER 81-025/04T-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-026-03, /03L-0:on 811223,switches NBI-LIS-01A & NBI-LIS- 101B Found Set at Level Lower That Tech Spec Limits.Caused by Setpoint Drift.Switches Returned to Correct Setpoints. Instrument Drift to Be Closely Monitored (← links)
- 05000298/LER-1981-026, Forwards LER 81-026/03L-0 (← links)
- 05000298/LER-1981-024-03, /03L-0:on 811106,safety Relief Valve 71-D Failed to Close After Test.Caused by Failure of Solenoid Plunger to Drop Out When Solenoid de-energized.Solenoid Replaced (← links)
- 05000298/LER-1981-024, Forwards LER 81-024/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-023-03, /03L-0:on 811026,uncalibr Temp Switch Installed in MS-TS-1480 During 1981 Refueling Outage.Caused by Technician Error.Technicians Counseled.Will Color Code Switches & Revise Surveillance Procedure (← links)
- 05000298/LER-1981-023, Forwards LER 81-023/03L-0.Detailed Event Analysis Submitted (← links)
- 05000298/LER-1981-022-03, /03L-0:on 810912,blown Fuse in Valve Motor Circuit Disabled Valve & Reactor Core Isolation Cooling Sys.Caused by Motor Grounded by Grease That Penetrated Defective Seal in Valve Operator & Into Armature.Motor & Seal Replaced (← links)
- 05000298/LER-1981-022, Forwards LER 81-022/03L-0.Detailed Event Analysis Also Submitted (← links)
- 05000298/LER-1981-021-03, /03L-0:on 810728,during Performance of Surveillance Procedure on Diesel Generator 2,injection Line Failed.Caused by Metal Fatigue & Vibration.Component Replaced (← links)
- 05000298/LER-1981-021, Forwards LER 81-021/03L-0.Detailed Event Rept Submitted (← links)
- 05000298/LER-1981-020-03, /03L-0: on 810728, During Procedure Returning Diesel Generator 1 to Svc After Flexible Fuel Line Leak, Control Air Line Fitting Failed Causing Generator to Shut Down. Caused by Broken Air Line Due to Crimped Ferrule (← links)
- 05000298/LER-1981-020, Forwards LER 81-020/03L-0. Detailed Event Analysis Also Submitted (← links)
- 05000298/LER-1981-019-03, /03L-0:on 810728,during Surveillance to Prove Operability of Diesel Generator 1,fuel Supply Hose Developed Leak.Caused by Excessive Localized Flexure & Vibration. Hose Replaced (← links)
- 05000298/LER-1981-019, Forwards LER 81-019/03L-0.Detailed Event Analysis Submitted (← links)
- 05000298/LER-1981-016-03, /03L-0:on 810610,core Thermal Power Calculation Performed by Process Computer Found Incorrect Due to Incorrect Feedwater Flow Value in Computer.Caused by Personnel Error in Changing Conversion Coefficient (← links)
- 05000298/LER-1981-016, Forwards LER 81-016/03L-0.Detailed Event Analysis Submitted (← links)
- 05000298/LER-1981-017-03, /03L-0:on 810613,reactor Core Isolation Cooling Sys Steam Supply Valve RCIC-MOV-M016 Failed to Open.Caused by Improperly Wired Motor Operator Circuit.Jumper Installed (← links)
- 05000298/LER-1981-017, Forwards LER 81-017/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-018-03, /03L-0:on 810625,pressure Switch NBI-PS-52A Found W/Trip Point Less Conservative than Tech Spec.Apparently Caused by Setpoint Drift.Switch Readjusted.Setpoints for Switches Reset (← links)
- 05000298/LER-1981-018, Forwards LER 81-018/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-015-03, /03L-0:on 810531,twelve Penetrations Were Found Leaking Excessively.Ten Caused by Normal Wear & Two by Improper Limitorque Operation.Valve Repairs Performed (← links)
- 05000298/LER-1981-013-03, /03L-0:on 810528,during Testing of Station Battery Rated Load Test W/Plant in Cold shutdown,125 Volt Batteries 1A & 1B Discharged at Rate Greater than Required.Caused by Error in Reading Procedure.Procedure Will Be Revised (← links)
- 05000298/LER-1981-015, Forwards LER 81-015/03L-0.Detailed Event Analysis Also Submitted (← links)
- 05000298/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-014-03, /03L-0:on 810608,during Testing,Hpci Pump Turbine Tripped on Overspeed Prior to Reaching Rated Sys Flow.Sys Declared Inoperable.Caused by Improper Valve line-up Procedure.Valve Throttled & Tested (← links)
- 05000298/LER-1981-014, Forwards LER 81-014/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-012-03, /03L-0:on 810519,during Testing HPCI-PS-68D Tripped at 89 Psig Instead of 100 Psig Tech Spec Limit. Caused by Random Instrument Drift.Instrument Immediately Recalibr & Returned to Svc (← links)
- 05000298/LER-1981-012, Forwards LER 81-012/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-011-03, /03L-0:on 810528,during Insp of Unexpected Alarm, CS Header Break Detection Instrument Switches Found Piped to Incorrect Lines.Caused by Connection to Wrong Line at Drywell Penetration.Instruments Connected to Proper Lines (← links)
- 05000298/LER-1981-011, Forwards LER 81-011/03L-0.Detailed Event Analysis Submitted (← links)
- 05000298/LER-1981-009-03, /03L-0:on 810503,two Pacific Scientific Model PSA-10 Mechanical Shock Suppressors Found Inoperable.Cause Under Evaluation.Snubber Replaced (← links)
- 05000298/LER-1981-009, Forwards LER 81-009/03L-0.Detailed Event Analysis Submitted (← links)
- 05000298/LER-1981-010-03, /03L-0:on 810505,static Inverter 1A Spike Suppressor Capacitor Failed Causing Inverter to Become Inoperable.Caused by Aging & Effects of High Ripple Charger (← links)
- 05000298/LER-1981-010, Forwards LER 81-010/03L-0 (← links)
- 05000298/LER-1981-002-03, /03L-0:on 810213,brass Filings Found in Oil Sump of Outboard Motor Bearing of RHR Svc Water Booster Pump. Caused by Loose Inboard Motor Fan & Set Screw.Fan Repaired & Second Set Screw Added (← links)
- 05000298/LER-1981-002, Forwards LER 81-002/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-003-03, /03L-0:on 810223,RHR-MO-26B Motor Amps Increased & Remained Excessively High When Valve Reached Closed Position.Caused by Limit Switch on Limitorque SMB-O Valve Motor Operator Not Opening & de-energizing Starter (← links)
- 05000298/LER-1981-003, Forwards LER 81-003/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-007-03, /03L-0:on 810426,diesel Generator 1 Cylinder Temp Increased During Surveillance Procedure 6.5.12.1 W/Reactor in Cold Shutdown.Caused by Temporary Air Pressure Test Gauge Which Fell Off Control Air Supply (← links)
- 05000298/LER-1981-007 (redirect page) (← links)
- 05000298/LER-1981-008-03, /03L-0:on 810426,reactor Vessel Level Switch LIS-72C,Switch-4,caused Continuous Annunciator 9-3-1/8-2 Alarm.Caused by Failure of Yarway Model 4418C Level Indicating Switch,Due to Film Buildup Between Contacts (← links)
- 05000298/LER-1981-008, Forwards LER 81-008/03L-0.Detailed Event Analysis Encl (← links)
- 05000298/LER-1981-006-03, /03L-0:on 810414,during Normal Surveillance Testing of Scram Discharge Header Cms,Three of Four Channels Installed Failed.Caused by Component Failure.Marginal Crystals Used in Transmitter Replaced by Manufacturer (← links)
- 05000298/LER-1981-006, Forwards LER 81-006/03L-0.Detailed Event Analysis Submitted (← links)
- 05000298/LER-1981-005-03, /03L-0:on 810320,reactor Bldg Closed Cooling Water Pump 1D Tripped During Start.Caused by Installation of Undersized Fuse.Fuses Replaced (← links)
- 05000298/LER-1981-005, Forwards LER 81-005/03L-0.Detailed Event Analysis Submitted (← links)
- 05000298/LER-1981-004-03, /03L-0:on 810306,during Normal Operation,Relay 27x3/1G Found de-energized.Cause Unknown.Relay Replaced. Operation Verified.Corresponding Relay for Redundant Sys Found Operable (← links)