Pages that link to "05000272/LER-1982-088, Forwards LER 82-088/03L-0.Detailed Event Analysis Encl"
Jump to navigation
Jump to search
The following pages link to 05000272/LER-1982-088, Forwards LER 82-088/03L-0.Detailed Event Analysis Encl:
Displayed 19 items.
- 05000311/LER-1982-143, Forwards LER 82-143/03L-0.Detailed Event Analysis Encl (← links)
- 05000311/LER-1982-136, Forwards LER 82-136/01T-0.Detailed Event Analysis Encl (← links)
- 05000311/LER-1982-134, Forwards LER 82-134/03L-0.Detailed Event Analysis Encl (← links)
- 05000311/LER-1982-132, Forwards LER 82-132/03L-0.Detailed Event Analysis Encl (← links)
- ML20070C134 (redirect page) (← links)
- 05000272/LER-1982-088 (redirect page) (← links)
- 05000311/LER-1982-135, Forwards LER 82-135/01T-0.Detailed Event Analysis Encl (← links)
- 05000272/LER-1982-090, Forwards LER 82-090/01T-0.Detailed Event Analysis Encl (← links)
- 05000311/LER-1982-106, Forwards LER 82-106/03L-0.Detailed Event Analysis Encl (← links)
- 05000272/LER-1982-064, Forwards LER 82-064/03L-0.Detailed Event Analysis Encl (← links)
- 05000311/LER-1982-145, Forwards Corrected LER 82-145/03X-1.Detailed Event Analysis Encl (← links)
- 05000311/LER-1982-138-03, /03L-0:on 821119,shift Supervisor Realized That Surveillance Requirement to Check Local Sightglass Levels of Accumulators 23 & 24 Was Overdue.Caused by Personnel Oversight.Personnel Counseled (← links)
- 05000311/LER-1982-136-01, /01T-0:on 821124,small Svc Water Leak of 0.5 Gpm Discovered on Cooling Coil of Containment Fan Coil Unit 23. Caused by Erosion of Cooling Coil by Silt in Svc Water. Coil Blanked Off to Seal Leak (← links)
- 05000311/LER-1982-132-03, /03L-0:on 821106 & 15,spurious Actuation of Safeguards Equipment Control Cabinet 2A Resulted in de-energization of Vital Bus 2A.Caused by Noise in Sys Control Circuitry.Noise Suppression Devices Will Be Added (← links)
- 05000272/LER-1982-088-03, /03L-0:on 821109,fire Observed in Fire Detection Instrumentation Panel 1FP3.Panel de-energized & Several Fire Detectors Rendered Inoperable.Caused by Failure of Panel Alarm Buzzer Relay.Relay Replaced (← links)
- 05000311/LER-1982-108-03, /03L-0:on 820915 & 17,RPI 1C4 Discovered Reading Greater than 12 Steps Lower than Bank Demand Indication.Caused by Combination of RPI Module Calibr Drift & Change in Actual Rod Position Signal Output (← links)
- 05000311/LER-1982-106-03, /03L-0:on 820913,six Broken Links Discovered on Circulator Travelling Screen 21A.Possibly Caused by stress-induced Cracking.Links Replaced.Design Change Request Issued to Consider Stainless Steel Links (← links)
- 05000272/LER-1982-064-03, /03L-0:on 820816,Westinghouse Reported Potential Problem Re Solid State Protection Sys.Evaluation of Rept for Applicability to Facility Underway.Supplemental Rept Will Be Submitted (← links)
- 05000311/LER-1982-085-03, /03L-0:on 820816,two Malfunctions of Reactor Coolant Channel Flow Indication 24 Experienced Due to Failure of Signal Isolation Amplifiers.No Common Cause for Isolation Amplifier Failure Determined.Amplifiers Replaced (← links)