Pages that link to "05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure"
Jump to navigation
Jump to search
The following pages link to 05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure:
Displayed 43 items.
- ML20101G784 (redirect page) (← links)
- 05000254/LER-1996-003 (redirect page) (← links)
- 05000254/LER-1996-013, Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1996-012, Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 970301 (← links)
- 05000254/LER-1996-011, Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated (← links)
- 05000265/LER-1996-001, Forwards LER 96-001-00.Listed Commitments Made,Including Event Will Be Included as Part of Continuing Training for Both Licensed Operators & Engineering Dept (← links)
- 05000254/LER-1996-021, Forwards LER 96-021-00,for Quad Cities Nuclear Power Station.No Commitments Being Made (← links)
- 05000265/LER-1996-002, Forwards LER 96-002-00.Licensee Revised Qcop 2300-1 to Ensure That Piping Downstream of Sys Isolation Valve Is Filled & Vented After Maint (← links)
- 05000254/LER-1996-025, Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values (← links)
- 05000254/LER-1996-023, Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated (← links)
- 05000265/LER-1996-003, Forwards LER 96-003-00 Submitted IAW Requirements of 10CFR50.73(a)(2)(v)(D).Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items (← links)
- 05000254/LER-1996-019, Forwards LER 96-019 IAW Requirements of 10CFR50.73(a)(2)(ii)(B) & Discusses Listed Commitments (← links)
- 05000254/LER-1996-018, Forwards Supplemental Info Re LER 96-018-00,correcting Editorial Error (← links)
- 05000254/LER-1996-020, Forwards LER 96-020-00.Commitments Included in LER & Submitted (← links)
- 05000265/LER-1996-003-01, :on 961112,Unit 2 LPCI Was Declared Inoperable. Caused by Failure of 2D RHR Pump Discharge Check Valve.Lpci Kf Pressure Was re-established within One Hour (← links)
- 05000254/LER-1996-022-01, Extends Commitment Date for Completing Rev to Plant CR Dose Analysis of Record,Per LER 96-022-01 (← links)
- 05000254/LER-1996-021-01, :on 961011,B CR HVAC Sys Was Declared Inoperable Due to Crankcase Heater Power Supply Design Deficiency.Design Change Notice 9600380 Issued,Which Replaced Crankcase Heater W/Safety Related Heater (← links)
- 05000265/LER-1996-002-10, :on 961009,HPCI Sys Declared Inoperable.Caused by Improper Filling & Venting After Aug 1996 Maint.Air Purged from Sys & line-up Procedure Revised to Ensure Filling & Venting of Piping (← links)
- 05000254/LER-1996-025-01, :on 961220,discovered Original Value for Strainers Head Loss Incorrect.Cause Could Not Be Determined. Training Provided for Operators to Recognize Pump Cavitation During Design Basis Accidents (← links)
- 05000254/LER-1996-023-01, :on 961124,CR Emergency Filtration Sys Failed to Maintain Required Airflow Due to Cognitive Personnel Error.Instrument Loop for Gauge Fi 1/2-5795-307 Calibr (← links)
- 05000265/LER-1996-003-13, :on 961112,Unit 2 LPCI Was Declared Inoperable to 2D RHR Pump Discharge Check Valve Failure.Lpci Kf Was re-established within 1 Hour & Operability Determination Was Completed for PIF 96-3196 (← links)
- 05000254/LER-1996-014-03, :on 960927,electrical Distribution Weekly Surveillance Did Not Document Voltage Verification Due to an Inadequate Procedure.Qcos 0005-06 Has Been Revised to Ensure Verification of Proper Voltages (← links)
- 05000254/LER-1996-017-01, :on 960825,manual Scram Taken During Reactor Startup When Reactor Water Level Increased Following Unplanned Opening of All Main Turbine Bypass Valves Occurred,Due to Inadequate Procedures.Procedures Revised (← links)
- 05000254/LER-1996-018-01, :on 960903,TS Surveillance Requirements Were Misinterpreted Due to Conservative Misunderstanding of Requirement.Memo Was Written to Explain Which Min TS Surveillances Must Be Performed Re Mode Switch (← links)
- 05000254/LER-1996-016-01, :on 960823,secondary Containment Would Not Have Satisfied All UFSAR Requirements,Due to Siding Explosion Bolts Which Were Damaged by Either High Winds or Ineffective Work Pratices.Damaged Bolts Replaced (← links)
- 05000254/LER-1996-019-01, :on 960904,main Steam Line Radiation Monitor Functional Test Was Not Performed within Frequency Established for TS When in Refueling Mode Due to Incomplete Documentation of TS Interpretation.Qcap 2300-11 Was Changed (← links)
- 05000254/LER-1996-020-01, :on 960907,CR Emergency Filtration Sys Declared Inoperable.Caused by Operator Knowledge Weakness.Operators Declared CR Emergency Filtration Sys Inoperable & Entered 14-day LCO (← links)
- 05000254/LER-1996-013-01, :on 960808,zebra Mussels Were Discovered on Fire Pump Suction Strainers.Caused by Inadequate Insp Frequency of Fire Pump Suction Strainers.Divers Removed & Cleaned Zebra Mussels from Fire Pump Suction Strainers (← links)
- 05000254/LER-1996-012-02, :on 960620,diesel Fuel Oil Transfer Piping Noted in Unanalysed Condition Due to an Incomplete Safety Classification Upgrade.Minor Mod Has Been Completed Which Removes Autofill Capability for Fire Pump Day Tanks (← links)
- 05000254/LER-1996-011-02, :on 960708,determined Postulated Fire Could Have Caused Disabling Damage to Selected Motor Operated Valves.Caused by Inadequate Design Analysis Review.Movs Analyzed for Susceptibility to Single Failure (← links)
- 05000254/LER-1996-010-02, :on 960611,discovered Installed Gallery Steel Configuration Lacked Required Cross Bracing.Caused by Deficiency in Original Design Configuration Control Process. Installed Gallery Cross Bracing (← links)
- 05000254/LER-1996-015-01, :on 960816,HPCI Sys Jet Impingement Support Baseplate/Concrete Expansion Anchors Were Improperly Installed,Due to Ineffective Work Practices & QA Program. Review Will Be Completed (← links)
- 05000254/LER-1996-008-02, :on 960607,TS Required Pressure Not Met During Local Leak Rate Testing.Caused by Procedural Deficiency. Procedure Changes Submitted & Check Valves Retested Using Appropriate Vent Paths (← links)
- 05000265/LER-1996-001-10, :on 960417,HPCIS Was Declared Inoperable Due to Procedural Deficiency Which Allowed Isolation of Turbine Exhaust Vacuum.Licensed Operators Have Been Trained on Procedure Changes (← links)
- 05000254/LER-1996-009-01, :on 960523,noted Discrepancy in Cable Length Modeled in Existing Degraded Voltage Calculations.Caused by Design Analysis Deficiency.Performed Design Changes to Correct Voltage Problems (← links)
- 05000254/LER-1996-005-07, :on 960203,B CR HVAC Sys Declared Inoperable Due to Outside Air Temp.Submitted TS Change Requesting That Heater Power Be Measured Instead of Differential Temp Across Heater to Determine Operability (← links)
- 05000254/LER-1996-007-02, :on 960510,secondary Containment Damaged.Caused by Tornado.Initiated Shutdown,Ac Power Restored to Prompt Notification Sys & Station Blackout Bldg Cables Spliced Per Er 9603099 (← links)
- 05000254/LER-1996-001-07, :on 960303,B CR HVAC Sys Inoperable Due to Malfunctioning Relay Which Prevented Isolation of Air Handling Unit Fan.Ems Replaced Relay & Forwarded Damaged Relay to Engineering for Evaluation (← links)
- 05000254/LER-1996-003-02, :on 960222,unanticipated Start Occurred on Unit 1 Edg.Caused by Inadequate Guidance within Procedure Qcmms 6600-03.Procedure Qcmms 6600-03 Will Be Revised to Clarify Switch Settings (← links)
- 05000254/LER-1996-002-04, :on 960220,CR HVAC Sys Inoperable.Caused by Design Oversight Involving Toxic Gas Anlayzer.On 960223 Procedure Change to Qcop 5750-09, CR Ventilation Sys, Made to Allow for Operation of Booster Fans (← links)
- 05000254/LER-1996-006, :on 960210,TS 3.0.A Incorrectly Invoked Due to Procedural & Operator Knowledge Deficiencies.Policy Statement Developed & Presented to Licensed Operator Re Expectations for Use & Entry Into TS 3.0.A (← links)
- 05000254/LER-1996-004-01, :on 960130,HPCI Sys Declared Inoperable Due to Gland Exhauster Breaker Trip.Hpci Gland Exhauster Breaker Replaced & Tested for Proper Operation & AOP Time Delay Bypass Switches in Starting Circuit Replaced (← links)