TAC:57809
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Results
Other: A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170, B11549, Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement, B11827, Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity, ML20129A151, ML20133F264, ML20141F878, ML20151M062, ML20154E988, ML20195G527 | |
From | |
MONTHYEARB11271, Application for Amend to License DPR-65,revising Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers.Fee Paid1985-05-28028 May 1985
[table view]Application for Amend to License DPR-65,revising Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers.Fee Paid ML20129A1511985-05-31031 May 1985 Proposed Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers B11598, Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 8512261985-06-27027 June 1985 Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 851226 B11549, Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement1985-07-24024 July 1985 Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement ML20126M2981985-07-24024 July 1985 Application for Amend to License DPR-65,revising Tech Specs to Expand Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks.Fee Paid ML20134N6051985-08-26026 August 1985 Forwards Auxiliary Sys Branch Request for Addl Info Re Util 850724 Request to Modify Tech Spec Concerning Expansion of Spent Fuel Storage Capacity.Response Requested within 15 Days ML20135G1691985-09-0505 September 1985 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion,To Complete Review of 850724 Request to Modify Tech Specs.Info Requested within 15 Days of Ltr Receipt B11712, Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool Capacity1985-09-16016 September 1985 Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool Capacity ML20133F2641985-10-0101 October 1985 Proposed Rev to Tech Spec 3/4.7.10,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired B11733, Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still Applicable1985-10-0101 October 1985 Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still Applicable ML20133E7071985-10-0303 October 1985 Forwards Structural & Geotechnical Engineering Branch Request for Addl Info to Complete Review of 850724 Application to Modify Tech Specs Re Spent Fuel Storage Capacity Expansion B11827, Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity1985-10-28028 October 1985 Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity B11889, Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons1985-11-25025 November 1985 Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons B11766, Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 8601311985-11-25025 November 1985 Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 860131 B11910, Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from1985-12-0303 December 1985 Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from B11916, Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly Suggested1985-12-16016 December 1985 Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly Suggested ML20141F8781986-01-0303 January 1986 Advises That Review Underway of Proposed Inservice Insp & Testing Program,Submitted on 850627.Proposal Would Increase Program Beyond Current Tech Spec Requirements.Final Approval of Submission Will Be Granted Upon Completion of Review ML20214N7971987-05-27027 May 1987 Forwards Request for Addl Info for Review of 850627 Submittal Re Inservice Testing at Facility.Addl Info Should Be Submitted within 60 Days of Ltr Receipt A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 1701987-05-29029 May 1987 Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 ML20195G5271987-10-0202 October 1987 Technical Evaluation Rept:Millstone Nuclear Power Station, Unit 1,Post-Fire Shutdown Evaluation,App R A06958, Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project Manager1988-01-0808 January 1988 Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project Manager ML20151M0621988-04-14014 April 1988 Advises That Revised post-fire Safe Shutdown Methodology Conforms W/Requirements of Sections III.G.3. & Iii.L of App R,10CFR50 & Acceptable,Per .Technical Evaluation Rept SAIC-87/3084 Encl ML20154E9881988-05-12012 May 1988 Fowards Addl Info Re Inservice Insp Program,Per 880212 Request.Attachment 1 Consists of Util Response to Questions Posed in NRC & Attachment 2 Consists of Revised Program Sections ML20150C7151988-06-28028 June 1988 Forwards Request for Addl Info Re Pump & Valve Inservice Testing Program.Response Requested within 60 Days of Receipt of Ltr 1985-08-26 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:57809&oldid=3383044"