Pages that link to "TAC:57809"
Jump to navigation
Jump to search
The following pages link to TAC:57809:
Displayed 19 items.
- ML20133F264 (← links)
- ML20129A151 (← links)
- TAC:58013 (redirect page) (← links)
- TAC:59265 (redirect page) (← links)
- ML20141F878 (← links)
- ML20154E988 (← links)
- ML20150C715 (← links)
- ML20199E968 (← links)
- ML20214N797 (← links)
- ML20237A738 (← links)
- A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 (← links)
- A06958, Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project Manager (← links)
- B11916, Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly Suggested (← links)
- B11598, Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 851226 (← links)
- B15304, Informs NRC of Util Election to Extend Present Second 10-yr ISI Interval for Facility by 12 Months,As Allowed by ASME Code (← links)
- B13946, Provides Addl Info Requested During 910819 Telcon Re Second 10-yr Inservice Insp Testing Program.Info Clarifies Relief Requests Submitted in (← links)
- A09625, Provides Addl Info Re Second 10 Yr in-service Insp Testing Program,Per NRC 910618 Request (← links)
- B13793, Forwards Request for Relief from Valve Testing Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,Per 10CFR50.55a(g) (← links)
- TAC:59294 (redirect page) (← links)
- ML20135G169 (← links)
- ML20134N605 (← links)
- ML20133E707 (← links)
- ML20126M298 (← links)
- A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 (← links)
- B11910, Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from (← links)
- B11766, Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 860131 (← links)
- B11889, Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons (← links)
- B11712, Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool Capacity (← links)
- B11827, Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity (← links)
- B11549, Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement (← links)
- ML20141B826 (← links)
- TAC:59849 (redirect page) (← links)
- TAC:59899 (redirect page) (← links)
- TAC:60052 (redirect page) (← links)
- TAC:60188 (redirect page) (← links)
- ML20151M062 (← links)
- ML20195G527 (← links)
- B13180, Responds to NRC Station Blackout Rule Re Plant Capability for Maintaining Core Cooling & Containment Integrity (← links)
- A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 (← links)
- ML20043F161 (← links)
- A08591, Responds to Generic Ltr 89-16 Re Installation of Hardened Wetwell Vent.Cost Estimates & Staff plant-specific Backfit Analysis Will Be Used to Evaluate Efficiency of Requiring Installation (← links)
- TAC:60517 (redirect page) (← links)
- TAC:60638 (redirect page) (← links)
- TAC:60697 (redirect page) (← links)
- A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 (← links)
- B11672, Forwards Revised Response to SER (NUREG-1031) Question 480.37 Re Asymmetric Pressure Loadings on Structures & Components Due to Postulated Pipe Ruptures,Including Results of Evaluation of Asymmetric Loadings on Pressurizer (← links)
- B11733, Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still Applicable (← links)
- B11271, Application for Amend to License DPR-65,revising Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers.Fee Paid (← links)
- A04668, Forwards Responses to Open Items Re Exceptions from Guidelines of Rev 2 to Reg Guide 1.97 (Contained in Suppl 1 to NUREG-0737) Discussed in 850416 Meeting.Responses Should Resolve NRC Concerns Re Open Items (← links)
- ML20141N041 (← links)
- ML20141N037 (← links)