MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 April 19, 2012 L-2012-158 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: St. Lucie Plant Unit 2 Docket No. 50-389 Renewed Facility Operating License No. NPF-16 Supplemental Response to NRC Mechanical and Civil Engineering Branch (EMCB) Regarding Extended Power Uprate License Amendment Request
References:
(1) R. L. Anderson (FPL) to U.S. Nuclear Regulatory Commission (L-2011-021),
"License Amendment Request for Extended Power Uprate," February 25, 2011, Accession No. ML110730116.
(2) Email from T. Orf (NRC) to C. Wasik (FPL), "St. Lucie 2 EPU draft RAIs -
Mechanical & Civil Engineering Branch (EMCB)," January 13, 2012.
(3) R. L. Anderson (FPL) to U.S. Nuclear Regulatory Commission (L-2012-059),
"Response to NRC Mechanical and Civil Engineering Branch (EMCB) Request for Additional Information Regarding Extended Power Uprate License Amendment Request," February 29, 2012, Accession No. ML12065A148.
By letter L-2011-021 dated February 25, 2011 [Reference 1], Florida Power & Light Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lucie Unit 2 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. This represents an approximate increase of 11.85% and is therefore considered an Extended Power Uprate (EPU).
By email from the NRC Project Manager dated January 13, 2012 [Reference 2],
additional information was requested by the NRC staff in the Mechanical and Civil Engineering Branch (EMCB) to support their review of the EPU License Amendment Request (LAR). The request for additional information (RAI) identified 47 questions. By letter L-2012-059 dated February 29, 2012 [Reference 3], FPL provided the requested information. In that letter, FPL also committed to provide a supplemental response to RAI EMCB-23 in a separate submittal. The attachment to this letter provides FPL's supplemental response to RAI EMCB-23.
Aoo(
an FPL Group company 0 WC
L-2012-158 Page 2 of 2 This submittal does not alter the significant hazards consideration or environmental assessment previously submitted by FPL letter L-2011-021 [Reference 1].
This submittal contains no new commitments and no revisions to existing commitments.
In accordance with 10 CFR 50.91 (b)(1), a copy. of this letter is being forwarded to the designated. State of Florida official.
Should you have any questions regarding this submittal, please contact Mr. Christopher Wasik, St. Lucie Extended Power Uprate LAR Project Manager, at 772-467-7138.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.
Executed on i j -d ,l.I Very truly yours, Site Vice President St. Lucie Plant Attachment (1) cc: Mr. William Passetti, Florida Department of Health
L-2012-158 Attachment Page 1 of 3 Supplemental Response to NRC Mechanical and Civil Engineering Branch (EMCB) Request for Additional Information The following information is provided by Florida Power & Light (FPL) in response to the U. S.
Nuclear Regulatory Commission's (NRC) Request for Additional Information (RAI). This information was requested to support Extended Power Uprate (EPU) License Amendment Request (LAR) for St. Lucie Nuclear Plant Unit 2 that was submitted to the NRC by FPL via letter (L-2011-021) dated February 25, 2011, Accession Number ML110730116.
In an email dated January 13, 2012 from NRC (Tracy Orf) to FPL (Chris Wasik), Subject' St.
Lucie 2 EPU draft RAIs - Mechanical & Civil Engineering Branch (EMCB), the NRC requested additional information regarding FPL's request to implement the EPU. The RAI consisted of forty-seven (47) questions from the NRC's Mechanical and Civil Engineering Branch (EMCB).
By letter L-2012-059 dated February 29, 2012, Accession No. ML12065A148, FPL provided the requested information. In that letter, FPL also committed to provide a supplemental response to RAI EMCB-23 in a separate submittal. This attachment provides FPL's supplemental response to RAI EMCB-23.
EMCB-23 To prove acceptability of the shown calculated loads for the steam generator nozzles shown on Tables 2.2.2.2-3 and 2.2.2.2-4, please provide the allowable loads and allowable load derivation.
Original Response:
Allowable nozzle loads were not provided by the supplier of the St. Lucie Unit 2 replacement steam generators (RSGs) during their original design. Instead, the RSG nozzles were analyzed based on loading conditions provided by FPL as part of their original design and procurement.
For the St. Lucie Unit 2 EPU, the RSG nozzle stresses and fatigue usage factors have been calculated for EPU based on EPU loads that bound those provided in EPU LAR Attachment 5, Tables 2.2.2.2-1 and 2.2.2.2-2. The results of the RSG nozzle stress and fatigue analyses using bounding EPU loads are provided in EPU LAR Attachment 5, Table 2.2.2.5-9.
As part of the EPU modification process, reanalysis of the main steam and feedwater piping has been performed. These revised EPU piping analyses establish new loads for the RSG main steam and feedwater nozzles. The RSG main steam and feedwater nozzles are being reanalyzed for these new EPU loads. Accordingly, an update to EPU LAR Attachment 5, Tables 2.2.2.2-1, 2.2.2.2-2, and 2.2.2.5-9 will be provided in a supplemental response.
Supplemental Response:
Reanalysis of the main steam and feedwater piping has been completed as part of the EPU modification process. These updated EPU piping analyses establish revised piping loads for the RSG main steam and feedwater nozzles. The revised piping loads for the RSG main steam and feedwater nozzles are presented in revised EPU LAR Attachment 5, Tables 2.2.2.2-1 and 2.2.2.2-2, below.
These revised RSG main steam and feedwater nozzle piping loads have been compared to the piping loads used to determine RSG nozzle stresses and fatigue usage factors presented in
L-2012-158 Attachment Page 2 of 3 EPU LAR Attachment 5, Table 2.2.2.5-9. The results of this comparison conclude that the RSG main steam and feedwater nozzle stresses and fatigue usage factors presented in.Table 2.2.2.5-9 remain valid.
Table 2.2.2.2-1 Steam Generator Nozzle Loads - Main Steam Nozzles Forces (Kips) Moments (in-Kips) -
Description Axial (Fa) Shear (Fv) Bending (Mb) Torsion (Ma)
Steam Generator 2A Total Loads = (DW +
DBE + THIST(TSV1) + 19.1 46.9 3629 4620 THER) (Note 1)
Total Loads = (DW +
DBE + THIST(MSIV) + 19.3 48.2 3673 4620 THER) (Note 1)
Total Loads = (DW +
DBE + THIST(TSV2) + 19.0 46.5 3606 4619 THER) (Note 1)
Steam Generator 2B Total Loads = (DW +
DBE + THIST(TSV1) + 12.6 35.8 3052 4236 THER) (Note 1)
Total Loads = (DW +
DBE + THIST(MSIV) + 12.8 37.6 3123 4236 THER) (Note 1)
Total Loads = (DW +
DBE + THIST(TSV2) + 12.4 34.9 2976 4235 THER) (Note 1)
Note 1:
DW = Dead Weight DBE = Design Basis Earthquake THER = Thermal THIST(TSV1) = Time History Loads due to Turbine Stop Valve Closure event with Steam Bypass Valves Closed THIST(MSIV) = Time History Loads due to Main Steam Isolation Valve Closure event THIST(TSV2) = Time History Loads due to Turbine Stop Valve Closure event with Steam Bypass Valves Open
L-2012-158 Attachment Page 3 of 3 Table 2.2.2.2-2 Steam Generator Nozzle Loads - Feedwater Nozzles Forces (Kips) Moments (in-Kips)
Description Axial (Fa) Shear (Fv) Bending (Mb) Torsion (Mt)
Steam Generator 2A Total Loads = (DW +
DBE + THIST(FRV) + 8.6 15.3 927 1771 THER) (Note 1)
Total Loads = (DW +
DBE + THIST(FIV) + 8.6 15.4 929 1772 THER) (Note 1)
Steam Generator 2B Total Loads = (DW +
DBE + THIST(FRV) + 9.9 17.7 1665 757 THER) (Note 1)
Total Loads = (DW +
DBE + THIST(FIV) + 9.9 18.2 1671 751 THER) (Note 1)
Note 1:
DW = Dead Weight DBE = Design Basis Earthquake THER = Thermal THIST(FRV) = Time History Loads due to Feedwater Regulating Valve Closure event THIST(FIV) = Time History Loads due to Feedwater Isolation Valve Closure event