ML090790217
From kanterella
Revision as of 05:48, 27 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML090790217 | |
Person / Time | |
---|---|
Site: | Vermont Yankee |
Issue date: | 02/13/2009 |
From: | Entergy Nuclear Operations |
To: | Fish T H Operations Branch I |
Hansell S | |
Shared Package | |
ML082600332 | List: |
References | |
TAC U01743 | |
Download: ML090790217 (1) | |
Similar Documents at Vermont Yankee | |
---|---|
Category:License-Operator
MONTHYEARML18005A4202018-01-0303 January 2018
[Table view]Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML14161A5482014-06-0909 June 2014 Requalification Program Inspection IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report ML14164A0482014-03-25025 March 2014 Walk-through Retake Exam Administered 3/24-25/2014 ML14057A7962014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14055A0412014-02-14014 February 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML14057A7262014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14058A1252014-02-14014 February 2014 Draft Written Exam (Folder 2) ML14059A0202014-02-14014 February 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14059A0562014-02-14014 February 2014 Draft - Outlines (Folder 2) ML14059A5422014-02-14014 February 2014 Final Outlines (Folder 3) ML14059A5462014-02-14014 February 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14063A5142014-02-14014 February 2014 Handouts to Applicants (Folder 3) ML14064A0512014-02-14014 February 2014 Final Qa/Related Forms (Folder 1) ML14029A3202014-01-29029 January 2014 Initial Operator Licensing Operating Test and Written Exam Approval ML13206A2282013-07-25025 July 2013 Senior Reactor Operator Initial License Examinations - 120 Day Notification Letter ML13106A1102013-04-11011 April 2013 Addendum to Final Qa/Related Forms (Folder 1) ML13128A1202013-03-18018 March 2013 Final Qa/Related Forms (Folder 1) ML13088A2752013-03-0808 March 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML13088A2652013-03-0808 March 2013 Final Outlines (Folder 3) ML13088A2802013-03-0505 March 2013 Handouts to Applicants (Folder 3) ML13106A1212013-02-27027 February 2013 NRC Comments on Draft Licensee Developed Exam (Written) (Folder 2) ML13106A1922013-02-22022 February 2013 Draft Written Exam (Folder 2) ML13106A1832013-02-22022 February 2013 Draft - Outlines (Folder 2) ML13022A3112013-01-22022 January 2013 Reactor Operator Written Retake Examination ML12319A1562012-10-25025 October 2012 Post Exam Comments and Resolution (Folder 1) ML12362A3252012-10-24024 October 2012 Final Qa/Related Forms (Folder 1). Examination Preparation Checklist ML12278A3442012-10-0404 October 2012 Initial Operator Licensing Written Examination Approval ML12311A1822012-10-0303 October 2012 Summary of Handouts to Applicants (Folder 3) ML12311A1732012-10-0303 October 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML12311A2132012-09-21021 September 2012 Final Outlines (Folder 3) ML12311A1982012-09-21021 September 2012 Final Operating Exam (Sections a, B, and C) (Folder 3) ML12261A2492012-09-17017 September 2012 Initial Operator Licensing Operating Test Approval - Vermont Yankee ML12311A1402012-09-14014 September 2012 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML12311A1032012-09-14014 September 2012 Draft Written Exam (Folder 2) ML12311A0982012-09-14014 September 2012 Draft - Outlines (Folder 2) ML12311A0952012-09-14014 September 2012 Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2) ML12150A2462012-05-29029 May 2012 Requalification Program Inspection - Vermont Yankee ML12116A0312012-04-24024 April 2012 Senior Reactor and Reactor Operator Initial License Examinations - Vermont Yankee ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML11251A0542011-09-0202 September 2011 June 2011 NRC Generic Fundamentals Examination Boiling Water Reactor - Answer Key ML1119904022011-07-18018 July 2011 June 8, 2011, NRC Generic Fundamentals Examination Results for Vermont Yankee Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML11251A0552011-06-23023 June 2011 June 2011 NRC GFE Roster Report on Total and Grade ML11251A0572011-06-0808 June 2011 Us NRC Examination Answer Sheet ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204392011-01-0505 January 2011 Final Qa/Related Forms (Folder 1) ML1032801642010-11-24024 November 2010 Operator Licensing Examination Approval, Vermont Yankee ML1102002602010-11-0101 November 2010 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1102002542010-11-0101 November 2010 Summary of Handout References to Applications (Folder 3) ML1102002472010-11-0101 November 2010 Final Outlines (Folder 3) 2018-01-03 Category:Part 55 Examination Related Material MONTHYEARML18005A4202018-01-0303 January 2018
[Table view]Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML14161A5482014-06-0909 June 2014 Requalification Program Inspection IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report ML14164A0482014-03-25025 March 2014 Walk-through Retake Exam Administered 3/24-25/2014 ML14064A0512014-02-14014 February 2014 Final Qa/Related Forms (Folder 1) ML14063A5142014-02-14014 February 2014 Handouts to Applicants (Folder 3) ML14059A5462014-02-14014 February 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14059A5422014-02-14014 February 2014 Final Outlines (Folder 3) ML14059A0562014-02-14014 February 2014 Draft - Outlines (Folder 2) ML14059A0202014-02-14014 February 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14058A1252014-02-14014 February 2014 Draft Written Exam (Folder 2) ML14057A7962014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14057A7262014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14055A0412014-02-14014 February 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML14029A3202014-01-29029 January 2014 Initial Operator Licensing Operating Test and Written Exam Approval ML13206A2282013-07-25025 July 2013 Senior Reactor Operator Initial License Examinations - 120 Day Notification Letter ML13106A1102013-04-11011 April 2013 Addendum to Final Qa/Related Forms (Folder 1) ML13128A1202013-03-18018 March 2013 Final Qa/Related Forms (Folder 1) ML13088A2752013-03-0808 March 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML13088A2652013-03-0808 March 2013 Final Outlines (Folder 3) ML13088A2802013-03-0505 March 2013 Handouts to Applicants (Folder 3) ML13106A1212013-02-27027 February 2013 NRC Comments on Draft Licensee Developed Exam (Written) (Folder 2) ML13106A1922013-02-22022 February 2013 Draft Written Exam (Folder 2) ML13106A1832013-02-22022 February 2013 Draft - Outlines (Folder 2) ML13022A3112013-01-22022 January 2013 Reactor Operator Written Retake Examination ML12319A1562012-10-25025 October 2012 Post Exam Comments and Resolution (Folder 1) ML12362A3252012-10-24024 October 2012 Final Qa/Related Forms (Folder 1). Examination Preparation Checklist ML12278A3442012-10-0404 October 2012 Initial Operator Licensing Written Examination Approval ML12311A1732012-10-0303 October 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML12311A1822012-10-0303 October 2012 Summary of Handouts to Applicants (Folder 3) ML12311A2132012-09-21021 September 2012 Final Outlines (Folder 3) ML12311A1982012-09-21021 September 2012 Final Operating Exam (Sections a, B, and C) (Folder 3) ML12261A2492012-09-17017 September 2012 Initial Operator Licensing Operating Test Approval - Vermont Yankee ML12311A1402012-09-14014 September 2012 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML12311A1032012-09-14014 September 2012 Draft Written Exam (Folder 2) ML12311A0982012-09-14014 September 2012 Draft - Outlines (Folder 2) ML12311A0952012-09-14014 September 2012 Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2) ML12150A2462012-05-29029 May 2012 Requalification Program Inspection - Vermont Yankee ML12116A0312012-04-24024 April 2012 Senior Reactor and Reactor Operator Initial License Examinations - Vermont Yankee ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML11251A0542011-09-0202 September 2011 June 2011 NRC Generic Fundamentals Examination Boiling Water Reactor - Answer Key ML1119904022011-07-18018 July 2011 June 8, 2011, NRC Generic Fundamentals Examination Results for Vermont Yankee Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML11251A0552011-06-23023 June 2011 June 2011 NRC GFE Roster Report on Total and Grade ML11251A0572011-06-0808 June 2011 Us NRC Examination Answer Sheet ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204392011-01-0505 January 2011 Final Qa/Related Forms (Folder 1) ML1032801642010-11-24024 November 2010 Operator Licensing Examination Approval, Vermont Yankee ML1102002602010-11-0101 November 2010 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1102002542010-11-0101 November 2010 Summary of Handout References to Applications (Folder 3) ML1102002472010-11-0101 November 2010 Final Outlines (Folder 3) 2018-01-03 |
Text
Drywell 314.6.C (pgs.118, 314.7.C 155a, 314.7.D Vermont Yankee's 2009 NRC Written Exam References Provided to SRO License Candidates February 6, 2009 1. AP 01 56, Notification of Significant Events (Rev. 63) Appendixes G & H 2. EOP-3 Curves including:
PCPL-A, Torus Level Limit, PSP, DWSIL, HCTL 3. EOP-3: Temperature and Torus Temperature Legs 4. The following Tech. Specs. Sections:
1 19) 156, 157) (pg. 158) 314.10 (pgs 21 1 through 21 9) 5. RHR Two Pump NPSH Limit curve from EOP-1 6. EOP-1 RPV Level Control Leg 7. EOP-2 RPV Level Control Leg (pgs.
Retrieved from "https://kanterella.com/w/index.php?title=ML090790217&oldid=987611"