| Q | CCA | Title |
---|
05000395/FIN-2013005-02 | 2013Q4 | | Inadequate Procedure for Control of Containment Penetrations |
05000395/FIN-2013008-01 | 2013Q4 | H.2 | Failure to Design the Safety-related Chiller Modification to Appropriate Quality Standards |
05000395/FIN-2013008-02 | 2013Q4 | | Failure to Prevent a Water Hammer Event in the RBCU SW Discharge Piping |
05000395/FIN-2013005-01 | 2013Q4 | | Seal Water Injection Filter Impact on Alternate Seal Injection System and Design Basis Accidents |
05000395/FIN-2014002-01 | 2014Q1 | | Failure to Declare the A Safety Injection Pump Inoperable and Enter TS 3.5.2 Action a |
05000395/FIN-2014002-02 | 2014Q1 | P.3 | Failure to Promptly Identify and Correct a Condition Adverse to Quality for an Inboard Bearing Oil Leak on the A CCW Pump |
05000395/FIN-2014003-01 | 2014Q2 | P.2 | Failure to Accomplish Procedure to Determine Cause and Correct Failures of Reactor Building Spray System Relief Valve |
05000395/FIN-2014003-02 | 2014Q2 | H.11 | Failure to Develop Adequate Post Modification Testing for the Alternate Seal Injection System |
05000395/FIN-2014008-01 | 2014Q3 | H.1(f) H.1 | Degraded Emergency Feedwater System Piping Supports |
05000395/FIN-2014004-01 | 2014Q3 | | Operator Actions Associated with Unit 1 Automatic Reactor Trip on July 22, 2014 |