ML11199A057

From kanterella
Revision as of 16:04, 4 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2011/07/14 - Diablo Canyon - July Hearing File Update.Pdf
ML11199A057
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/14/2011
From: Subin L B
NRC/OGC
To: Curran D, Repka D A, ZamEk J
Atomic Safety and Licensing Board Panel, San Luis Obispo Mothers for Peace
Subin L B
References
50-275-LR, 50-323-LR
Download: ML11199A057 (3)


Text

July 14, 2011 David A. Repka, Esq.

Tyson Smith, Esq.

Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111

-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.

San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net Diane Curran, Esq.

Harmon, Curran, Spielberg, and Eisenberg

1726 M Street NW Washington, DC 20036 Suite 600 E-mail: dcurran@harmoncurran.com In the Matter of Pacific Gas and Electric Company (Diablo Canyo n Nuclear Power Plant, Units 1 and 2

) Docket Nos. 5 0-275-LR and 5 0-323-LR

Dear Parties:

Pursuant to the Licensing Board's Memorandum and Order dated September 15, 20 10, the Staff will monthly provid e the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336

. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff.

Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index. Attac hed is the Affidavit of Nathaniel B.

Ferrer, as required by 10 C.F.R. § 2.336(c). Respectfully submitted, /signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff

Affidavit of Nathaniel B. Ferrer

In the Matter of PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50

-2 75-LR and 50-3 23-LR NRC Staff Transmittal Letter dated July 14 , 2011 Attachment 1 Affidavit of Nathaniel B. Ferrer

July 14, 2011 UNITED STATES OF NUCLEAR REGULATORY BEFORE THE ATOMIC SAFETY AND LICENSING In the Matter of ) ) PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. ) (Diablo Canyon Nuclear Power Plant ) Units 1 and 2) AFFIDAVIT OF NATHANIEL B. FERRER CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b) I, Nathaniel B. Ferrer, do hereby state as follows: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's

("NRC") Office of Nuclear Reactor Regulation.

I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application

("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.

2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of July 14, 2011. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. / Nathaniel B. Ferrer Executed in Rockville, Maryland this 14th day of July, 2011