ENS 41167
From kanterella
Revision as of 17:42, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
19:00 Nov 2, 2004 | |
Title | Unanalysed Condition - Inadequate Cable Separation |
Event Description | On 11/2/04 at 1400, Seabrook Station determined that a potential scenario involving a fire could result in the loss of the Train A and Train B centrifugal charging pumps (CCP). During a fire, inadequate cable separation could result in the spurious closure of one of two series volume control tank (VCT) outlet valves. This would result in a loss of suction to the operating CCP and eventual loss of the pump. The second CCP is assumed to be lost as a result of the same fire. This condition was concluded to be reportable pursuant to 10CFR50.72(b)(3)(ii)(B) as a condition that resulted in the plant being in an unanalyzed condition that significantly degrades plant safety.
Compensatory measures include establishing a roving fire watch in the affected fire zones, operator briefings, and limiting combustible material in the affected fire zones. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Seabrook New Hampshire (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+-1.4 h-0.0583 days <br />-0.00833 weeks <br />-0.00192 months <br />) | |
Opened: | Pat Leary 17:36 Nov 2, 2004 |
NRC Officer: | Bill Gott |
Last Updated: | Nov 2, 2004 |
41167 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 41167\u003C/a\u003E - \u003Ca href=\"/Seabrook\" title=\"Seabrook\"\u003ESeabrook\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnanalysed Condition - Inadequate Cable Separation\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 41167 - Seabrook\n","link":"","lat":42.89886111111111,"lon":-70.85284722222222,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 411672004-11-02T19:00:0002 November 2004 19:00:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalysed Condition - Inadequate Cable Separation 2004-11-02T19:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_41167&oldid=92955"