Calvert Cliffs, Units 1 & 2, Submittal of Updated Final Safety Analysis Report, Revision 48
ML15279A467
Person / Time
Site:  Constellation icon.png
Issue date: 09/14/2015
From: David Gudger
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15279A292 List:
References
NEI 99-04
Download: ML15279A467 (5)


Text

/200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com Exel~o Generation 10 CER 50.71 (e)(4)10 CFR 54.37(b)NEI 99-04 September 14, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

SUBJECT:

Submittal of Updated Final Safety Analysis Report, Revision 48 In accordance with 10 CFR 50.71 (e)(4) and 10 CFR 50.4(b)(6), enclosed is Revision 48 of the Updated Final Safety Analysis Report (UFSAR) for Calvert Cliffs Nuclear Power Plant (CCNPP). The enclosed UFSAR revision is being provided to the U.S. Nuclear Regulatory Commission (NRC) in electronic format on CD-ROM. The electronic version of the UFSAR revision is being submitted in entirety and is a complete document.10 CFR 50.71 (e)(4) stipulates subsequent revisions must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months and the revisions must reflect all changes up to a maximum of 6 months prior to the date of filling. Revision 48 of the UFSAR incorporates applicable changes for the required updating period. The previous revision (i.e., Revision 47) of the CCNPP was submitted on September 19, 2014.Attachment 1 provides a brief summary of the changes incorporated into UFSAR Revision 48.Attachment 2 includes file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CD.In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-1 6, Revision 1, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses, "the UFSAR update required by 10 CFR 50.71 (e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with 10 CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging in order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting UFSAR Revision 48 for CON PP, Units 1 and 2. As a result of this evaluation, there were no newly-identified SSCs for which aging management reviews or time-limited aging analyses would apply.

K U.S. Nuclear Regulatory Commission Submittal of CCNPP UFSAR Revision 48 NRC Docket Nos. 50-317 and 50-318 September 14, 2015 Page 2 Furthermore, in accordance with the guidance NEI 99-04, "Guidelines for Mana ging NRC Commitment Changes," this submittal addresses commitment changes made since the previous UFSAR submittal on September 19, 2014. There are no commitment changes being reported in conjunction with this submittal.

As required by 10OCFR50.71 (e)(2)(i), I certify that to the best of my knowledge, Revision 48 of the UFSAR accurately reflects information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.If you have any questions or require further information, please contact Richard Gropp at (610) 765-5557.Resp4ctfully'

,,,j David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

Attachment 1 -Brief Summary of the Changes Attachment 2 -Electronic File Directory Structure

Enclosure:

CCNPS, Units 1 and 2, UFSAR Revision 48 (CD-ROM)cc: Regional Administrator, Region I, USNRC w/ Enclosure/Attachments USNRC Senior Resident Inspector, CCNPP" USNRC Senior Project Manager NRR, CCNPP" S. T. Gray, State of Maryland" Attachment 1 Brief Summary of the Changes Page 1 of 1 Change Number Brief Description of Change UCR00789 UCR0081 6 UCR00850...U CR00861 ..UCR00866 UCR00867 UCR00868 UCR00870 UCR00872...U.C.R.0.08735 UCR00877 UCR00883 UCR00884 U CR00884 UCR00886 UCR00887 UC008 UCR00891 UCR00892...U.CRO00893.

UCR00894 UCR00896 UCR00898 UCR00902 UCR.0.091 9 UCR00921*Update UFSAR Section 7.5.7 (Seismic Instrumentation) to remove seismic...................

tr.....i .ggers 0-Y:.S-001 .an~d o.-YS-0(02 an~d..seismic!*

playb~ack! ..............................

....... .. ..... ........ .. .Revise UFSAR Section 7.4.5 to describe changes in the Feedwater control............................

sys~te~m and..Steam

...Gen~erator..feed Revise UFSAR Sections 7.10.2 and 14.4 related to Excess Load event......Revise description in UFSAR Table 16-2 for Line Item 189............................

R evis~e descri.Ptior.n , in U FSA R .Table

.254., ...............................................

Revise UFSAR Section 11.2.3.1 and Table 11-11 to reflect changes related to area radiation monitors..........................."Revi se UFJSARnTabl}e 9-20oto adda "note to allow d ifferent pipin g 'materi al andi............

Revise UFSAR Table 11-10 to reflect changes in the display for the Main Steam Line radiation monitors..........................

..R~evise descrip~tio in. n UF.SAR T. abl!e...1.6-2 f.or L~ine..Item

.21.6 ..... .................................

SAdd description for new UFSAR Section 16.3.1 Containment Tendon Prestress SLoss and update various line items in Table 16-2. .......................

Revise UFSAR S-ection 8.4.44related to the installation of a new Automatic...............

............................

Ad~d description..f~ornew.

UFISAR. Sect~ion...

16..3.2...poisoQn..Sheets in spent..Fuel.

Pool.'.Add description for new UFSAR Section 16.3.3 10 CER 50.49 Environmental

.. ....:Q ualification P!rogram ....... .... .... ... ......................

Revise UF~sAR Table 9-18 concerning maintaining Diesel-Generator Room... ..*temperature.

SUpdate UFSAR Sections 3.3, 3.4, 3.5, and 3.7 to include information for Unit 2 (Cycle 21 ) fuel batch and burnable poison data, cycle limiting values and excess shutdown margin, quarter core assembly map, relative power densities at...... ..................

d ~iff[ e re n t. c o£ n d itio n s .*..........................

........ ......... .. .. ..... ... .. .... ..........

..... .... .................

SUpdate UFSAR Sections 7.5.4 and 7.5.5 related Plant Process Computer..........................

i..Revi~s~e.descripltionD in UF).SA.R.

Tabl.e 1.6-.2_.0 forline.Item 1!56. ....................

.........

....Revise UFSAR Section 7.4.7.2 description related to Turbine high exhaust.....................

.. .e p e a u e trte m p e ra tu re.... .. ...... ........ ..............

.. ........ ........trip .... ...... ............

Revise UFSAR Sections 14.13, 14.14, and 14.17 for Unit 2 Cycle 21 concerning use of AREVA fuel.Revise UFSAR Section 8.4 description regarding diesel fuel oil calculation

..... ..... .........

... m e h o * ... ........ .........me th o d ..... .. .. ...... ...........

.... .............. ......... .. .. ...Revise UFSAR to add new information in Section 9.3.2.1 (Circulating Water........ .........

... ... .y ~ e ) ,... .... .. ........Sy s t e m ) ...... ........ .. ............

.. ... .. ...... ...... .... .. ... .......... .... ....... .... ....... .. .............

............

..................

Revise UFSAR. Section 5A.3_.5. (Referen~ces).

to? correct a date reference

...........

SRevise various UFSAR sections and LOEP references to make editorial corrections.

.ATTACHMENT 2 Page ilof 1 Electronic File Directory Structure I :C FA 4 0 1Intro and Summary.pdf

___ 439,7721jUFSAR R48 :002 01 Intro and Summary Fig.pdf ____9,068,1151 d:\C UFSR R4 00 02 ite nd Evirnmenpdfg i54ij 3{j~d:\CC UFSAR R48 :003 02 Site and EnvironmentFg.pdf

______ -Sd:\CC UFSAR R48 005 03 Reactor.pdf

_____1,021,0751 d:\CC UFSAR R48 :006 03 Reactor Fig.pdf i ,5" 118 '278i;d:\CC UFA 4 0 4RSand Associated Sys.pdf i5719 id:\CUFAR t R48008 04 RCS and Associated Sys Fig.pdf ... ..................

..1,294,7091t d:\CC UFSAR R48 00 5Structures.pdf

'5975 d:CC USA 48 1010 05 Structures Figpdfdf,762,22 d:\CC UFSAR R48 0611 05 Structures App.pdf .____ 526,778 1 i d:\CCUFSAR R48 1012 05 Structures App Fig.pdf 1 752,4021 d:\CC UFSAR R48 ]015 07 lnstr and Controls.pdf

__ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _679,439!d\CUARR48 1016 07 Instr and Controls Fig.pdf 3,142,6181UFSAR R48 __ 017 08 Electrical Sys.pdf ................

....................................

349,60tU 4d:CC UFSAR R48 [018 08 Electrical Sys Fig.pdf ___- 2,927,2881 Id:\CC UFSAR R48 i019 09 Auxiliary Systems.pdf

____675,9861UFSAR R48 1020 09 Auxiliary Systems Fig.pdf ___ __ 4,610,1731 d:\CC UFSAR R48 02 0Steam and Power Conv.pdf ,135,6691 id:\CC UFSAR R48 022 10 Steam and Power Cony Fig.pdf i4,382,1371 d:\CC UFSAR R48 :023 11 Waste Processing and RP.pdf ___ ____ __ d:\CC UFSAR R48 024 11 Waste Processing and RP Fig.pdf _____3,458,674t d:\ccUFSAR R48 ~ 025 12 Conduct of Operations.pdf i13741731 rd:\CC UFSAR R48 1026 12 Conduct of Operations Fig.pdf 183,564!'d:\CC UFSAR R48 13 Initial Tests and Operation.pdf

_____110,5081

!d:\CC UFSAR R48 j028§14 Safety Analysis.pdf

___ 1,280,677 Sd:\CC UFSAR R48 1029 14 Safety AnalysisFig.pdf 3,774,1021 d:\CC UFSAR R48 030 15Technical Req Manual.pdf

_ 71,877 d:CUFAR4 031 Li cense Renewal.pdf

___________

__ 401,930~

ENCLOSURE Calvert Cliffs Nuclear Power Plant Units 1 and 2 Updated Final Safety Analysis Report, Revision 48 Compact Disk (CD)

/200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com Exel~o Generation 10 CER 50.71 (e)(4)10 CFR 54.37(b)NEI 99-04 September 14, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

SUBJECT:

Submittal of Updated Final Safety Analysis Report, Revision 48 In accordance with 10 CFR 50.71 (e)(4) and 10 CFR 50.4(b)(6), enclosed is Revision 48 of the Updated Final Safety Analysis Report (UFSAR) for Calvert Cliffs Nuclear Power Plant (CCNPP). The enclosed UFSAR revision is being provided to the U.S. Nuclear Regulatory Commission (NRC) in electronic format on CD-ROM. The electronic version of the UFSAR revision is being submitted in entirety and is a complete document.10 CFR 50.71 (e)(4) stipulates subsequent revisions must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months and the revisions must reflect all changes up to a maximum of 6 months prior to the date of filling. Revision 48 of the UFSAR incorporates applicable changes for the required updating period. The previous revision (i.e., Revision 47) of the CCNPP was submitted on September 19, 2014.Attachment 1 provides a brief summary of the changes incorporated into UFSAR Revision 48.Attachment 2 includes file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CD.In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-1 6, Revision 1, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses, "the UFSAR update required by 10 CFR 50.71 (e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with 10 CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging in order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting UFSAR Revision 48 for CON PP, Units 1 and 2. As a result of this evaluation, there were no newly-identified SSCs for which aging management reviews or time-limited aging analyses would apply.

K U.S. Nuclear Regulatory Commission Submittal of CCNPP UFSAR Revision 48 NRC Docket Nos. 50-317 and 50-318 September 14, 2015 Page 2 Furthermore, in accordance with the guidance NEI 99-04, "Guidelines for Mana ging NRC Commitment Changes," this submittal addresses commitment changes made since the previous UFSAR submittal on September 19, 2014. There are no commitment changes being reported in conjunction with this submittal.

As required by 10OCFR50.71 (e)(2)(i), I certify that to the best of my knowledge, Revision 48 of the UFSAR accurately reflects information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.If you have any questions or require further information, please contact Richard Gropp at (610) 765-5557.Resp4ctfully'

,,,j David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

Attachment 1 -Brief Summary of the Changes Attachment 2 -Electronic File Directory Structure

Enclosure:

CCNPS, Units 1 and 2, UFSAR Revision 48 (CD-ROM)cc: Regional Administrator, Region I, USNRC w/ Enclosure/Attachments USNRC Senior Resident Inspector, CCNPP" USNRC Senior Project Manager NRR, CCNPP" S. T. Gray, State of Maryland" Attachment 1 Brief Summary of the Changes Page 1 of 1 Change Number Brief Description of Change UCR00789 UCR0081 6 UCR00850...U CR00861 ..UCR00866 UCR00867 UCR00868 UCR00870 UCR00872...U.C.R.0.08735 UCR00877 UCR00883 UCR00884 U CR00884 UCR00886 UCR00887 UC008 UCR00891 UCR00892...U.CRO00893.

UCR00894 UCR00896 UCR00898 UCR00902 UCR.0.091 9 UCR00921*Update UFSAR Section 7.5.7 (Seismic Instrumentation) to remove seismic...................

tr.....i .ggers 0-Y:.S-001 .an~d o.-YS-0(02 an~d..seismic!*

playb~ack! ..............................

....... .. ..... ........ .. .Revise UFSAR Section 7.4.5 to describe changes in the Feedwater control............................

sys~te~m and..Steam

...Gen~erator..feed Revise UFSAR Sections 7.10.2 and 14.4 related to Excess Load event......Revise description in UFSAR Table 16-2 for Line Item 189............................

R evis~e descri.Ptior.n , in U FSA R .Table

.254., ...............................................

Revise UFSAR Section 11.2.3.1 and Table 11-11 to reflect changes related to area radiation monitors..........................."Revi se UFJSARnTabl}e 9-20oto adda "note to allow d ifferent pipin g 'materi al andi............

Revise UFSAR Table 11-10 to reflect changes in the display for the Main Steam Line radiation monitors..........................

..R~evise descrip~tio in. n UF.SAR T. abl!e...1.6-2 f.or L~ine..Item

.21.6 ..... .................................

SAdd description for new UFSAR Section 16.3.1 Containment Tendon Prestress SLoss and update various line items in Table 16-2. .......................

Revise UFSAR S-ection 8.4.44related to the installation of a new Automatic...............

............................

Ad~d description..f~ornew.

UFISAR. Sect~ion...

16..3.2...poisoQn..Sheets in spent..Fuel.

Pool.'.Add description for new UFSAR Section 16.3.3 10 CER 50.49 Environmental

.. ....:Q ualification P!rogram ....... .... .... ... ......................

Revise UF~sAR Table 9-18 concerning maintaining Diesel-Generator Room... ..*temperature.

SUpdate UFSAR Sections 3.3, 3.4, 3.5, and 3.7 to include information for Unit 2 (Cycle 21 ) fuel batch and burnable poison data, cycle limiting values and excess shutdown margin, quarter core assembly map, relative power densities at...... ..................

d ~iff[ e re n t. c o£ n d itio n s .*..........................

........ ......... .. .. ..... ... .. .... ..........

..... .... .................

SUpdate UFSAR Sections 7.5.4 and 7.5.5 related Plant Process Computer..........................

i..Revi~s~e.descripltionD in UF).SA.R.

Tabl.e 1.6-.2_.0 forline.Item 1!56. ....................

.........

....Revise UFSAR Section 7.4.7.2 description related to Turbine high exhaust.....................

.. .e p e a u e trte m p e ra tu re.... .. ...... ........ ..............

.. ........ ........trip .... ...... ............

Revise UFSAR Sections 14.13, 14.14, and 14.17 for Unit 2 Cycle 21 concerning use of AREVA fuel.Revise UFSAR Section 8.4 description regarding diesel fuel oil calculation

..... ..... .........

... m e h o * ... ........ .........me th o d ..... .. .. ...... ...........

.... .............. ......... .. .. ...Revise UFSAR to add new information in Section 9.3.2.1 (Circulating Water........ .........

... ... .y ~ e ) ,... .... .. ........Sy s t e m ) ...... ........ .. ............

.. ... .. ...... ...... .... .. ... .......... .... ....... .... ....... .. .............

............

..................

Revise UFSAR. Section 5A.3_.5. (Referen~ces).

to? correct a date reference

...........

SRevise various UFSAR sections and LOEP references to make editorial corrections.

.ATTACHMENT 2 Page ilof 1 Electronic File Directory Structure I :C FA 4 0 1Intro and Summary.pdf

___ 439,7721jUFSAR R48 :002 01 Intro and Summary Fig.pdf ____9,068,1151 d:\C UFSR R4 00 02 ite nd Evirnmenpdfg i54ij 3{j~d:\CC UFSAR R48 :003 02 Site and EnvironmentFg.pdf

______ -Sd:\CC UFSAR R48 005 03 Reactor.pdf

_____1,021,0751 d:\CC UFSAR R48 :006 03 Reactor Fig.pdf i ,5" 118 '278i;d:\CC UFA 4 0 4RSand Associated Sys.pdf i5719 id:\CUFAR t R48008 04 RCS and Associated Sys Fig.pdf ... ..................

..1,294,7091t d:\CC UFSAR R48 00 5Structures.pdf

'5975 d:CC USA 48 1010 05 Structures Figpdfdf,762,22 d:\CC UFSAR R48 0611 05 Structures App.pdf .____ 526,778 1 i d:\CCUFSAR R48 1012 05 Structures App Fig.pdf 1 752,4021 d:\CC UFSAR R48 ]015 07 lnstr and Controls.pdf

__ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _679,439!d\CUARR48 1016 07 Instr and Controls Fig.pdf 3,142,6181UFSAR R48 __ 017 08 Electrical Sys.pdf ................

....................................

349,60tU 4d:CC UFSAR R48 [018 08 Electrical Sys Fig.pdf ___- 2,927,2881 Id:\CC UFSAR R48 i019 09 Auxiliary Systems.pdf

____675,9861UFSAR R48 1020 09 Auxiliary Systems Fig.pdf ___ __ 4,610,1731 d:\CC UFSAR R48 02 0Steam and Power Conv.pdf ,135,6691 id:\CC UFSAR R48 022 10 Steam and Power Cony Fig.pdf i4,382,1371 d:\CC UFSAR R48 :023 11 Waste Processing and RP.pdf ___ ____ __ d:\CC UFSAR R48 024 11 Waste Processing and RP Fig.pdf _____3,458,674t d:\ccUFSAR R48 ~ 025 12 Conduct of Operations.pdf i13741731 rd:\CC UFSAR R48 1026 12 Conduct of Operations Fig.pdf 183,564!'d:\CC UFSAR R48 13 Initial Tests and Operation.pdf

_____110,5081

!d:\CC UFSAR R48 j028§14 Safety Analysis.pdf

___ 1,280,677 Sd:\CC UFSAR R48 1029 14 Safety AnalysisFig.pdf 3,774,1021 d:\CC UFSAR R48 030 15Technical Req Manual.pdf

_ 71,877 d:CUFAR4 031 Li cense Renewal.pdf

___________

__ 401,930~

ENCLOSURE Calvert Cliffs Nuclear Power Plant Units 1 and 2 Updated Final Safety Analysis Report, Revision 48 Compact Disk (CD)