ML16006A157
| ML16006A157 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 02/08/2016 |
| From: | James Danna Division of License Renewal |
| To: | Greendeer J Ho-Chunk Nation of Wisconsin |
| Russell Chazell 415-5003 | |
| References | |
| Download: ML16006A157 (30) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Jon Greendeer, President Ho-Chunk Nation
W9814 Airport Road P.O. Box 667 Black River Falls, WI 54615
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear President Greendeer:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS).
LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2) the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016 J. Greendeer Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv
Mr. William Quackenbush, Tribal Historic Preservation Officer
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Steve Cadue, Chairman Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas 1107 Goldfinch Road Horton, KS 66439
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Cadue:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Gilbert Salazar, Chairman Kickapoo Tribe of Oklahoma 407 North Highway 102 P.O. Box 70
McLoud, OK 74851
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Salazar:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS).
LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Mr. Kent Collier, NAGPRA Contract
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 8, 2016
Mr. Douglas G. Lankford, Chief Miami Tribe of Oklahoma P.O. Box 1326
Miami, OK 74355
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chief Lankford:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS).
LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. John P. Froman, Chief Peoria Tribe of Indians of Oklahoma 118 S. Eight Tribes Trail P.O. Box 1527
Miami, OK 74355
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chief Froman:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS).
LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. John A. Barrett, Jr., Chairman Citizen Potawatomi Nation 1601 S. Gordon Cooper Dr.
Shawnee, OK 74801
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Barrett:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Dr. Kelli Mosteller, Tribal Historic Preservation Officer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Ms. Judith Bender, Chairperson Sac and Fox Tribe of the Mississippi in Iowa/Meskwaki 349 Meskwaki Road Tama, IA 52339
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairperson Bender:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Mr. Johnathan L. Buffalo, Historic Preservation, Director UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Ms. Brigette Robidoux, Chairperson Sac and Fox Nation of Missouri in Kansas and Nebraska 305 N. Main Street Reserve, KS 66434
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairperson Robidoux:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. George Thurman, Principal Chief
Sac and Fox Nation Administration Building 920883 S. Hwy 99 Bldg A Stroud, OK 74079
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Principal Chief Thurman:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Ms. Sandra Kaye Massey, NAGPRA Coordinator UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. John P. Warren, Chairperson
Pokagon Band of Potawatomi 58620 Sink Road P.O. Box 180
Dowagiac, MI 49047
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairperson Warren:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Mr. Marcus A. Winchester, Tribal Historic Preservation Officer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Harold "Gus" Frank, Chairman Forest County Potawatomi 5416 Everybody's Rd. P.O. Box 340
Crandon, WI 54520
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Frank:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 8, 2016
Mr. Kenneth Meshigaud, Tribal Chairperson
Hannahville Indian Community N14911 Hannahville B1 Road Wilson, MI 49896-9728
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairperson Meshigaud:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Steve Ortiz, Chairman
Prairie Band of Potawatomi Nation 16281 Q Road Mayetta, KS 66509
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Ortiz:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. John Blackhawk, Chairman Winnebago Tribe of Nebraska 100 Bluff Street PO Box 687 Winnebago, NE 68071
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Blackhawk:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation
Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv DISTRIBUTION: See next page ADAMS Accession Number: ML16006A157 *concurred via email OFFICE LA:DLR PM:DLR/RERP RERP Technical Staff Member BC:DLR/RERP NAME IBetts DDrucker RChazell JDanna DATE 1/ 11 /16 2/ 3/16 w/changes 2/4/16 2/8/16 OFFICIAL RECORD COPY Identical letters have been sent to: Mr. Jon Greendeer, President, Ho-Chunk Nation Mr. Steve Cadue, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas Mr. Gilbert Salazar, Chairman, Kickapoo Tribe of Oklahoma Mr. Douglas G. Lankford, Chief, Miami Tribe of Oklahoma Mr. John P. Froman, Chief, Peoria Tribe of Indians of Oklahoma Mr. John "Rocky" Barrett, Chairman, Citizen Potawatomi Nation Ms. Judith Bender, Chairperson, Sac and Fox Tribe of the Mississippi in Iowa/Meskwaki Ms. Brigette Robidoux, Chairperson, Sac and Fox Nation of Missouri in Kansas and Nebraska Mr. George Thurman, Principal Chief, Sac and Fox Nation Mr. John P. Warren, Chairperson, Pokagon Band of Potawatomi Mr. Harold "Gus" Frank, Chairman, Forest County Potawatomi Mr. Kenneth Meshigaud, Tribal Chairperson, Hannahville Indian Community, Band of Potawatomi Mr. Steve Ortiz, Chairman, Prairie Band of Potawatomi Nation Mr. John Blackhawk, Chairman, Winnebago Tribe of Nebraska
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT DISTRIBUTION:
PUBLIC RidsNrrDlr Resource
RidsNrrDlrRpb1 Resource
RidsNrrDlrRerp Resource RidsOpaMail RidsOgcMailCenter
DDrucker RChazell UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Jon Greendeer, President Ho-Chunk Nation
W9814 Airport Road P.O. Box 667 Black River Falls, WI 54615
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear President Greendeer:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS).
LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2) the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016 J. Greendeer Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv
Mr. William Quackenbush, Tribal Historic Preservation Officer
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Steve Cadue, Chairman Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas 1107 Goldfinch Road Horton, KS 66439
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Cadue:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Gilbert Salazar, Chairman Kickapoo Tribe of Oklahoma 407 North Highway 102 P.O. Box 70
McLoud, OK 74851
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Salazar:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS).
LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Mr. Kent Collier, NAGPRA Contract
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 8, 2016
Mr. Douglas G. Lankford, Chief Miami Tribe of Oklahoma P.O. Box 1326
Miami, OK 74355
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chief Lankford:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS).
LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. John P. Froman, Chief Peoria Tribe of Indians of Oklahoma 118 S. Eight Tribes Trail P.O. Box 1527
Miami, OK 74355
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chief Froman:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS).
LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. John A. Barrett, Jr., Chairman Citizen Potawatomi Nation 1601 S. Gordon Cooper Dr.
Shawnee, OK 74801
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Barrett:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Dr. Kelli Mosteller, Tribal Historic Preservation Officer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Ms. Judith Bender, Chairperson Sac and Fox Tribe of the Mississippi in Iowa/Meskwaki 349 Meskwaki Road Tama, IA 52339
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairperson Bender:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Mr. Johnathan L. Buffalo, Historic Preservation, Director UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Ms. Brigette Robidoux, Chairperson Sac and Fox Nation of Missouri in Kansas and Nebraska 305 N. Main Street Reserve, KS 66434
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairperson Robidoux:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. George Thurman, Principal Chief
Sac and Fox Nation Administration Building 920883 S. Hwy 99 Bldg A Stroud, OK 74079
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Principal Chief Thurman:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Ms. Sandra Kaye Massey, NAGPRA Coordinator UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. John P. Warren, Chairperson
Pokagon Band of Potawatomi 58620 Sink Road P.O. Box 180
Dowagiac, MI 49047
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairperson Warren:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv Mr. Marcus A. Winchester, Tribal Historic Preservation Officer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Harold "Gus" Frank, Chairman Forest County Potawatomi 5416 Everybody's Rd. P.O. Box 340
Crandon, WI 54520
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Frank:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 8, 2016
Mr. Kenneth Meshigaud, Tribal Chairperson
Hannahville Indian Community N14911 Hannahville B1 Road Wilson, MI 49896-9728
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairperson Meshigaud:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. Steve Ortiz, Chairman
Prairie Band of Potawatomi Nation 16281 Q Road Mayetta, KS 66509
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Ortiz:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. John Blackhawk, Chairman Winnebago Tribe of Nebraska 100 Bluff Street PO Box 687 Winnebago, NE 68071
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT
Dear Chairman Blackhawk:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating licenses for LaSalle County Station, Units 1 and 2 (LSCS). LSCS is located in LaSalle County, Illinois, approximately 75 miles southwest of Chicago, and 11 miles southeast of Ottawa, IL and is operated by Exelon Generation Company, LLC (Exelon). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of LSCS. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of LSCS is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated February 9, 2015, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small.
Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the LSCS operating licenses)
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRC's preliminary recommendation is that the adverse environmental impacts of license renewal for LSCS are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants," Revision 1, (2)
the environmental report submitted by Exelon; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
February 8, 2016
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB) Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please
contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv
Please find a copy of the draft SEIS with these conclusions enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0268. Written comments may be mailed to the NRC at:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Please note that the public comment period for the draft SEIS ends on April 4, 2016.
A public meeting to discuss the findings of the draft SEIS will be held on March 22, 2016, at the LaSalle County Emergency Operations Center, 711 East Etna Road, Ottawa, Illinois. The
meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A meeting notice will be published shortly providing more details about this public meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Mr. David Drucker, Environmental Project Manager, at (301) 415-6223 or by e-mail at
David.Drucker@nrc.gov. Sincerely, /RA/ James G. Danna, Chief Environmental Review and
Project Management Branch Division of License Renewal Office of Nuclear Reactor Regulation
Docket Nos. 50-373 and 50-374
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57
cc w/encls: Listserv DISTRIBUTION: See next page ADAMS Accession Number: ML16006A157 *concurred via email OFFICE LA:DLR PM:DLR/RERP RERP Technical Staff Member BC:DLR/RERP NAME IBetts DDrucker RChazell JDanna DATE 1/ 11 /16 2/ 3/16 w/changes 2/4/16 2/8/16 OFFICIAL RECORD COPY Identical letters have been sent to: Mr. Jon Greendeer, President, Ho-Chunk Nation Mr. Steve Cadue, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas Mr. Gilbert Salazar, Chairman, Kickapoo Tribe of Oklahoma Mr. Douglas G. Lankford, Chief, Miami Tribe of Oklahoma Mr. John P. Froman, Chief, Peoria Tribe of Indians of Oklahoma Mr. John "Rocky" Barrett, Chairman, Citizen Potawatomi Nation Ms. Judith Bender, Chairperson, Sac and Fox Tribe of the Mississippi in Iowa/Meskwaki Ms. Brigette Robidoux, Chairperson, Sac and Fox Nation of Missouri in Kansas and Nebraska Mr. George Thurman, Principal Chief, Sac and Fox Nation Mr. John P. Warren, Chairperson, Pokagon Band of Potawatomi Mr. Harold "Gus" Frank, Chairman, Forest County Potawatomi Mr. Kenneth Meshigaud, Tribal Chairperson, Hannahville Indian Community, Band of Potawatomi Mr. Steve Ortiz, Chairman, Prairie Band of Potawatomi Nation Mr. John Blackhawk, Chairman, Winnebago Tribe of Nebraska
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF LASALLE COUNTY STATION, UNITS 1 AND 2, FOR PUBLIC COMMENT DISTRIBUTION:
PUBLIC RidsNrrDlr Resource
RidsNrrDlrRpb1 Resource
RidsNrrDlrRerp Resource RidsOpaMail RidsOgcMailCenter
DDrucker RChazell