ENS 51116
ENS Event | |
---|---|
22:05 Jun 3, 2015 | |
Title | Manual Reactor Trip Due To Loss Of Main Feedwater Pump |
Event Description | This is a non-emergency notification from Waterford 3.
At 1705 [CDT] the reactor was manually tripped in anticipation of an automatic trip due to loss of main feedwater pump 'A'. The plant is currently in mode 3 and stable with emergency feedwater feeding and maintaining both steam generators due to an automatic emergency feed actuation signal. During the trip, the 'B' electrical safety and non safety busses did not automatically transfer from the unit auxiliary transformer to the startup transformer causing a loss of off-site power to the 'B' electrical busses. This resulted in a loss of main feedwater pump 'B'. The 'B' emergency diesel generator started as designed and reenergized the 'B' safety related buses. The plant entered the emergency operating procedure for loss of main feedwater. Off-site power has been restored to the 'B' safety and non safety busses, and the emergency diesel generator 'B' is secured. All control rods fully inserted into the core following the trip. Decay heat is being removed by the main condenser using the turbine bypass valves. The electric plant is in a normal shutdown lineup. The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Waterford Louisiana (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-0.48 h-0.02 days <br />-0.00286 weeks <br />-6.57504e-4 months <br />) | |
Opened: | Scott Meiklejohn 21:36 Jun 3, 2015 |
NRC Officer: | Dong Park |
Last Updated: | Jun 3, 2015 |
51116 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51116\u003C/a\u003E - \u003Ca href=\"/Waterford\" title=\"Waterford\"\u003EWaterford\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Reactor Trip Due to Loss of Main Feedwater Pump\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51116 - Waterford\n","link":"","lat":29.993747222222222,"lon":-90.4687111111111,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (100 %) |
After | Hot Standby (0 %) |