|
---|
Category:Letter
MONTHYEARNL-25-0306, Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4, License Amendment Request: Remove Technical Specifications Table of Contents (NL-25-0306)2025-02-27027 February 2025 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4, License Amendment Request: Remove Technical Specifications Table of Contents (NL-25-0306) NL-24-0228, License Amendment Request to Remove or Modify Outdated License Information2025-02-27027 February 2025 License Amendment Request to Remove or Modify Outdated License Information NL-25-0041, Readiness for Supplemental Inspection2025-02-14014 February 2025 Readiness for Supplemental Inspection NL-25-0030, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function2025-02-14014 February 2025 License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function ML25042A1022025-02-12012 February 2025 Integrated Inspection Report 05200025/2024004 and 05200026/2024004 IR 05000424/20240042025-02-11011 February 2025 Integrated Inspection Report 05000424/2024004 and 05000425/2024004 ML25036A1972025-02-10010 February 2025 Unit 4 - Notification of Licensed Operator Initial Examination 05200025/2025301 and 05200026/2025301 ML25034A1982025-02-10010 February 2025 License Renewal Commitment Item 12 (EPID L-2025-LLL-0000) - Letter NL-25-0011, Inservice Inspection Program Owners Activity Report for Outage IR252025-01-30030 January 2025 Inservice Inspection Program Owners Activity Report for Outage IR25 ML25028A3642025-01-30030 January 2025 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-24-0325, License Amendment Request: Move Surveillance Requirements from Technical Specifications (TS) 3.3.15 and 3.3.16 Engineered Safety Feature Actuation System (ESFAS) Actuation Logic2025-01-24024 January 2025 License Amendment Request: Move Surveillance Requirements from Technical Specifications (TS) 3.3.15 and 3.3.16 Engineered Safety Feature Actuation System (ESFAS) Actuation Logic IR 05000424/20243012025-01-24024 January 2025 NRC Operator License Examination Report 05000424/2024301 and 05000425/2024301 NL-24-0417, License Amendment Request: Shutdown Actions Mode Change Restrictions2025-01-23023 January 2025 License Amendment Request: Shutdown Actions Mode Change Restrictions NL-24-0117, Change to Quality Assurance Program to Adopt Regulatory Guide 1.8 Revision 4 and License Amendment Request to Relocate Control of the Unit/Facility/Plant Staff Qualification Requirements from Technical Specifications to the Quality Assura2025-01-23023 January 2025 Change to Quality Assurance Program to Adopt Regulatory Guide 1.8 Revision 4 and License Amendment Request to Relocate Control of the Unit/Facility/Plant Staff Qualification Requirements from Technical Specifications to the Quality Assuranc NL-25-0013, License Renewal Commitment Item 202025-01-16016 January 2025 License Renewal Commitment Item 20 ML25010A3812025-01-16016 January 2025 Authorization of Proposed Alternative Inservice Testing of the 2A and 2B Charging Pumps ML24198A1062025-01-16016 January 2025 Issuance of Amendment Nos. 227 & 209, Revision to Surveillance Requirements for TS 3.8.1, Ac Sources – Operating, to Change Emergency Diesel Generator Frequency and Voltage Ranges ML25008A2482025-01-15015 January 2025 Acknowledgement of the Withdrawal of the Requested Exemptions for Physical Barriers ML25008A0372025-01-15015 January 2025 Audit Summary Report for the Exemption Requests Regarding Physical Barriers NL-24-0365, License Renewal Commitment Item 122025-01-15015 January 2025 License Renewal Commitment Item 12 NL-25-0014, Withdrawal of Request for Exemption from Physical Barrier Requirements2025-01-15015 January 2025 Withdrawal of Request for Exemption from Physical Barrier Requirements NL-25-0008, Request for Alternative for Inservice Testing of the 2A and 2B Charging Pumps in Accordance with 10 CFR 50.55a(z)(2)2025-01-0707 January 2025 Request for Alternative for Inservice Testing of the 2A and 2B Charging Pumps in Accordance with 10 CFR 50.55a(z)(2) ML24330A1232024-12-20020 December 2024 Issuance of Amendment Nos. 251, 248, 226, and 208 Revising TS to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0412, License Amendment Request to Increase Flexibility in Mode Restraints2024-12-19019 December 2024 License Amendment Request to Increase Flexibility in Mode Restraints NL-24-0294, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-12-19019 December 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000424/20244022024-12-13013 December 2024 Security Baseline Inspection Report 05000424/2024402 05000425/2024402 052000252/024404, and 052000262/024405 NL-24-0253, License Amendment Request: Revised Technical Specifications to Adopt TSTF-554, Revised Reactor Coolant Leakage Requirements2024-12-13013 December 2024 License Amendment Request: Revised Technical Specifications to Adopt TSTF-554, Revised Reactor Coolant Leakage Requirements ML24337A1222024-12-10010 December 2024 Audit Summary Report for the LAR to Revise Emergency Diesel Generator Frequency & Voltage Ranges for TS 3.8.1, AC (Alternating Current) Sources - Operating, Surveillance Requirements EPID L-2024-LLA-0031 05200025/LER-2024-004, Condition Prohibited by Technical Specification Due to Main Steam Safety Valve Lift Pressure Setpoint Drift2024-12-0909 December 2024 Condition Prohibited by Technical Specification Due to Main Steam Safety Valve Lift Pressure Setpoint Drift ML24325A4402024-11-26026 November 2024 Summary of November 19, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Modes 5 & 6 for Vogtle Electric Generating Plant, Units 3 & 4 NL-24-0408, Unit 3, Core Operating Limits Report, Cycle 2, Version 12024-11-21021 November 2024 Unit 3, Core Operating Limits Report, Cycle 2, Version 1 ML24318C2622024-11-19019 November 2024 Operator Licensing Examination Approval 05000424/2024301 and 05000425/2024301 05200025/LER-2024-003, Automatic Reactor Protection System and Manual Safeguards Actuation Due to a Failed Open Flow Control Valve2024-11-18018 November 2024 Automatic Reactor Protection System and Manual Safeguards Actuation Due to a Failed Open Flow Control Valve NL-24-0406, Response to Request for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0032024-11-15015 November 2024 Response to Request for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-003 NL-24-0397, Response to Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement2024-11-15015 November 2024 Response to Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement ML24320A1342024-11-15015 November 2024 Regulatory Audit in Support of Review of the Exemption Requests Regarding Physical Barriers EPIDs L-2023-LLE-0018 and -0021 (Nonproprietary Cover Letter) ML24313A0632024-11-14014 November 2024 Integrated Inspection Report and Assessment Follow-Up Letter 05200025/2024003 and 05200026/2024003 ML24305A1662024-11-0606 November 2024 Vogle Electric Generating Plant, Unit 3 - Summary of Conference Call Regarding the Fall 2024 Steam Generator Tube Inspections NL-24-0217, License Amendment Request: Source Range Neutron Flux Doubling Function Applicability2024-11-0101 November 2024 License Amendment Request: Source Range Neutron Flux Doubling Function Applicability NL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter 2025-02-27
[Table view] |
See also: IR 05000424/2017002
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
May 19, 2017
Mr. B. Keith Taber
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
05000425/2017002
Dear Mr. Taber:
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The inspection is planned for the week of June 26, 2017, which coincides with your regularly
scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced
simulator in accordance with ANSI/ANS-3.5-1985, "American National Standard for Nuclear
Power Plant Simulators for Use in Operator Training and Examination."
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the
material as specified in paragraph "A" of the Enclosure, in order to support the NRC's inspection
program needs. The NRC has further requested t
hat you have all items as specified in
paragraph "B" of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Jenkins has been advised of this request and provided with the name and address
of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018).
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0101), Office of Management and Budget, Washington, DC 20503.
B. Taber 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this
inspection please contact Mr. Lanyi at (404)
997-4487, (Internet E-mail: david.lanyi@nrc.gov),
or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).
Sincerely,
/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
Enclosure: Materials Request List
cc: Distribution via Listserv
_________________________ SUNSI REVIEW COMPLETE
FORM 665 ATTACHED OFFICE RII/ OB1 RII/ OB1 SIGNATURE DRL GXM NAME D. Lanyi G. McCoy DATE 5/19/2017 5/19/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO