05000364/FIN-2018001-02
From kanterella
Revision as of 22:27, 29 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Finding | |
---|---|
Title | Enforcement Action (EA)-18-025:Unit 2 Main Steam Safety Valve (MSSV) Lift Pressure Outside of Technical Specification Limits |
Description | On October 26, 2017, MSSV Q2N11V0012E was removed from service at Farley Nuclear Plant Unit 2 during a refueling outage, and on November 1, 2017 the valve was tested with steam at an offsite facility. As-found lift testing determined that the valve opened at 1171 psig steam pressure, which was 9 psig high outside the plant technical specification (TS) allowable lift setting range of 1096 psig to 1162 psig. The valve had been in service prior to the plant beginning commercial operation on July 30, 1981, until it was removed from the main steam system on October 26, 2017. The licensee last tested the valve, while installed on the main steam system, on April 5, 2016. The test results indicated the lift pressure was within +/- 1% of the TS 3.7.1 required set pressure of 1129 psig, and no set pressure adjustment was necessary for the valve. The licensee determined that the MSSV high as-found lift set-point did not have an adverse impact on the main steam system over-pressurization protection, since the valve as-found lift setpoint was lower than 110% of steam generator design pressure (1194 psig), and this condition would not have resulted in a loss of safety function. Therefore, the plant remained bounded by the accident analysis in the Final Safety Analysis Report (FSAR), based on the as-found condition. Corrective Action(s): The valve was replaced with an operable MSSV during the refueling outage prior to plant startup.Corrective Action Reference(s): The licensee entered this issue into their Corrective Action Program (CAP) as condition report (CR) 10426186 as found test results for MSSV Q2N11V0012E. Violation: Farley Nuclear Plant, Unit 2 Technical Specifications (TS) limiting condition for operation (LCO) 3.7.1, Main Steam Safety Valves (MSSVs), required five MSSVs per steam generator to be operable. Per TS Table 3.7.1-2, MSSV Q2N11V0012E must have a lift setting within the range of 1096 psig to 1162 psig, while the Unit was in modes 1, 2, and 3. With one MSSV inoperable and the Moderator Temperature Coefficient (MTC) zero or negative at all power levels, Action Statement, Condition A, Required Action A.1, required reducing thermal power to 87% RTP within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. If the required action and associated completion time is not met, Action Statement, Condition C, required that the unit be in mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.Contrary to the above, the licensee determined the MSSV setting was outside the TS limits longer than 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> during the operating cycle between May 11, 2016 and October 15, 2017, while the Unit was in modes 1, 2, and 3. Severity/Significance: The inspection assessed the severity of the violation using Section 6.1 of the Enforcement Policy and determined the significance is appropriately characterized at Severity Level IV, due to the inappreciable potential safety consequences. The significance of this violation was informed, in part, using IMC 0609, Appendix A, The Significance Determination Process (SDP) for findings at Power, dated June 19, 2012. Basis for Discretion: The NRC exercised enforcement discretion in accordance with Section3.10 of the Enforcement Policy because the MSSV as-found lift pressure issue was not reasonably foreseeable and preventable. The inspectors reached this conclusion due to the fact that the licensee last tested the valve satisfactorily, while installed on the main steam system, on April 5, 2016, and during the period of time that the valve was in service, following May 11, 2016, there was no indication of valve degradation (e.g. seat leakage) |
Site: | Farley |
---|---|
Report | IR 05000364/2018001 Section NO CC AREA |
Date counted | Mar 31, 2018 (2018Q1) |
Type: | Violation: |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 4OA3 |
Inspectors (proximate) | 7115 |
Violation of: | Technical Specification |
INPO aspect | Enforcement Discretion |
' | |
Finding - Farley - IR 05000364/2018001 | |||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|