ML18072A014
From kanterella
Revision as of 01:33, 17 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Request | |
---|---|
EPID:L-2018-LLA-0054, Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (Approved, Closed) | |
Initiation Administration | |
MONTHYEARML18072A0102018-01-31031 January 2018, 7 March 2018
[Table View]Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping Project stage: Request ML18072A0132018-01-31031 January 2018 WCAP-18295-NP, Revision 0, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis, Using Leak-Before-Break Methodology. Project stage: Request ML18072A0142018-01-31031 January 2018 WCAP-18302-NP, Revision 0, Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis, Using Leak-Before-Before Break Methodology. Project stage: Request ML18072A0152018-01-31031 January 2018 WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis Using Leak-Before-Break Methodology. Project stage: Request ML18075A1142018-03-26026 March 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18096A7642018-04-0606 April 2018 NRR E-mail Capture - Donald C. Cook, Unit 1 - Acceptance Review for Application of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping Project stage: Acceptance Review ML18204A3722018-07-19019 July 2018 NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR Project stage: RAI ML18263A1542018-09-14014 September 2018 NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR Project stage: RAI ML19011A3512019-01-11011 January 2019 NRR E-mail Capture - Request for Additional Information DC Cook Unit 1 Leak Before Break Amendment Project stage: RAI ML19072A1432019-03-12012 March 2019 NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR Project stage: Draft RAI ML19084A0002019-03-20020 March 2019 NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR Project stage: Draft RAI ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping Project stage: Approval 2018-09-14 |
ML18072A014 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 01/31/2018 |
From: | Johnson E D Westinghouse |
To: | Office of Nuclear Reactor Regulation |
References | |
AEP-NRC-2018-02 WCAP-18302-NP, Rev 0 | |
Download: ML18072A014 (50) | |
Similar Documents at Cook | |
---|---|
Category:Topical Report
MONTHYEARML18072A0132018-01-31031 January 2018
[Table view]WCAP-18295-NP, Revision 0, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis, Using Leak-Before-Break Methodology. ML18072A0142018-01-31031 January 2018 WCAP-18302-NP, Revision 0, Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis, Using Leak-Before-Before Break Methodology. ML18072A0152018-01-31031 January 2018 WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis Using Leak-Before-Break Methodology. AEP-NRC-2018-22, WCAP-18133-NP, Revision 0, Inspection Flaw Acceptance Criteria for D.C. Cook Unit 2 Reactor Vessel Internals MRP-227-A Primary and Expansion Components.2017-03-31031 March 2017 WCAP-18133-NP, Revision 0, Inspection Flaw Acceptance Criteria for D.C. Cook Unit 2 Reactor Vessel Internals MRP-227-A Primary and Expansion Components. ML13283A1222013-09-30030 September 2013 WCAP-17762-NP, Revision 1, D. C. Cook Unit 1 Return to Reactor Coolant System Normal Operating Pressure/Normal Operating Temperature Program - Licensing Report, and Enclosures 7 Through 9 ML11195A0252011-06-30030 June 2011 to Topical Report, D.C. Cook Unit 2 Post-LOCA Long Term Cooling Boron Precipitation Reanalysis Licensing Report Text. ML0425102312004-08-26026 August 2004 Transmittal of Non-proprietary Version of Westinghouse, WCAP-14907 ML0418800822004-05-31031 May 2004 to WCAP-14118-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: D. C. Cook Units 1 and 2. ML0418201432004-05-31031 May 2004 to WCAP-14118-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: D. C. Cook Units 1 and 2. Unit 2 Flaw Tolerance Charts ML0417700722004-05-31031 May 2004 Rev. 0 to WCAP-14070-NP, Evaluation of Donald C. Cook Units 1 and 2 Auxiliary Spray Piping Per NRC Bulletin 88-08. ML0332302252003-11-12012 November 2003 Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. ML0331100912003-10-23023 October 2003 Submittal of Revision 3 to Ice Condenser Utility Group Topical Report No. ICUG-001: Application of the Active Ice Mass Management Concept to the Ice Condenser Ice Mass Technical Specification ML0319206472003-06-19019 June 2003 to Ice Condenser Utility Group Topical Report No. ICUG-001: Application of the Active Ice Mass Management Concept to the Ice Condenser Ice Mass Technical Specification ML0221103342002-05-31031 May 2002 WCAP-15047, Revision 2, D.C. Cook Unit 2 WOG Reactor Vessel 60-Year Evaluation Minigroup Heatup and Cooldown Limit Curves for Normal Operation. ML0221004382002-05-31031 May 2002 WCAP-13515, Revision 1, Analysis of Capsule U from Indiana Michigan Power Company D. C. Cook, Unit 2 Reactor Vessel Radiation Surveillance Program. ML0221103392002-05-31031 May 2002 WCAP-13517, Revision 1, Evaluation of Pressurized Thermal Shock for D.C. Cook Unit 2. ML0213500672002-05-10010 May 2002 Non-Proprietary Version of Topical Report WCAP-15753, Rev. 1, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: D.C. Cook, Units 1 and 2. 2018-01-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML18072A014&oldid=586229"